Loading...
HomeMy WebLinkAbout2713-1550 WN ORANGETHORPE VICINITY MAP �CIl�NI'Y MSP SCALE: 1 m 1/2 mile CITY OF FONTANA NOTES: INSPECTIONS: 1. It is the Landscape Contractor's responsibility to contact the Engineering Division Landscape Inspector, (48) hours prior to desired inspection of an item at extension (909) 350-6633. ` 2. Prior to release of utilities or maintenance period commencement, the following inspections are required: I a. Pre -Construction meeting(s). b. Construction of irrigation system in open trench condition (prior to backfill). Pressure Test 150 PSI for a three (3) hour continuous period. C. An irrigation coverage test. d. Planting, including street trees. Contact the parks Planning and Landscape Development Section, Engineering Division, for species and locations. e. Finish grade prior to seeding. f. Compliance with approved landscape plans. g. Any special Conditions of Approval attached to project. h. Final Inspection. 3. The Owner's representative and Landscape Contractar shall be pret at these inspections. MAINTENANCE GUIDELINES: or " � - TV M__� I �41Ivy L A, L. L. C . PLACENTIA, PLANS PREPARED FOR No. LANDINGS, 750 L.L.C. ATTN: BEN ANDERSON 550 W. ORANGETHORPE PLACENTIA, CALIFORNIA 92670 (714) 996-6700 ' ' 1 Landscape shall be- maintained in a neat, clean, weed free and healthy condition. This shall include, but not limited to: 1. - Cultivation of planted beds at intervals (not to exceed ten (10) days). 2. Regular mowing to maintain a lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth. 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. - 5. Immediate replacement of plant material as needed due to death, disease, or lack of growth. �► _- ._-_. _ �.�_. _- __ 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. 8. Stakes, guys and ties, on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunks or branches. -- 9.- Upon completion of the three (3) months or one (1) year maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection staff. The landscape shall be maintained in accordance with these landscape maintenance standards. maintenance bonding shall be released at the end of the appropriate period if the landscape is maintained according to plans and specifications. - - 10. The principal bond holder is responsible to contact the City and schedule the maintenance inspection L- 1 TITLE SHEET L- 2 - L-13 WALL PLANS L-1 4 ENTRY MONUMENTATION GRADING & LAYOUT L-1 5 ENTRY MONUMENTATION DETAILS L-1 6 ALL SPECIFICATIONS ' L-17 - L-31 IRRIGATION PLANS l`N111, ve� � LlsY00" T;i L-32 - L-34 IRRIGATION DETAILS & SPE("4ATIONS L-35 - L-49 PLANTING PLANS L-50. PLANTING SPECIFICATIONS L-51 DETENSION BASIN IRRIGATION L-52 DETENSION BASIN PLANTING � L-53 NEIGHBORHOOD PARK GRADING, CONSTRUCTIOKlr,P.LN�"s',; Ieh � L-54 NEIGHBORHOOD PARK I( rN 3 I �X� IRRIGATION, PLANTING PLA,N,,,24scke: i'.wo ��, q ae L-55 NEIGBORHOOD PARK CONSTRUCTION DETAILSi­TN,OTE$) jiEyl81Qp19 Uneer city BENCHMAW Prepared By: i+rFy, Sad FONTANA CA4LJFOM,L&t.1 LAYMON COMMUNITY_ DEVELOPMENT DEPT.; A. Drown By: St7,010: iJ�__ S CAjr._ E r TITLE SHEET �ARC.�ITECTSO*s1gnad By: Dote: ] ENCINA IRVINE, CALIFORNIA 92726 - . PHONE i7f4)731-8208 FAX (714) 731-F]41 N �QI'oVQ+�: :'��°�� - :, P - ,_M_ CITY ENG'11 { _M_ R.C.E.251 k � - . X: ... T 31� '77177