Loading...
HomeMy WebLinkAbout2666-150+00 1+00 2+00 i�iZ�7 2+00 3+00 1+00 2+00 3+00 `X\ CONSTRUCTION NOTES I � 1 CONSTRUCT 42" DIA. RCP PER PLAN AND PROFILE THIS SHEET AND -�` BEDDING DETAIL ON SHEET 21. CONSTRUCT MANHOLE PER DETAILS ON SHEET 22. r CONSTRUCT DROP -INLET MANHOLE PER DETAILS ON SHEET 23 \ CONSTRUCT WETLAND INLET STRUCTURE PER DETAILS ON SHEET 30. + 8 CONSTRUCT 18" DIA. RCP PER PLAN AND PROFILE THIS SHEET AND BEDDING DETAIL ON SHEET 21 s 12 DIA. PVCs 13 CONSTRUCT 24" DIA. RCP PER PLAN AND PROFILE THIS SHEET AND �� s'J• WETLANQ 7 Lt/ / q WETLAND 7 DRAIN Ir�_Nf BEDDING DETAIL ON SHEET 21. 594.98 ` �, `req a r BOT. EL. =1572.00 86. N 14, 17 CONSTRUCT JUNCTION STRUCTURE PER DETAILS ON SHEET 25 E- 4 ,875.02 y (� / q o 0 1A 'p� Il I� t 34 on o 638 z�r o� 31 CONSTRUCT LINE "G2" OUTLET PER DETAILS ON SHEET 19 • 6'p l �, op F-� .BASIN 10 �? LATERAL TO MHAK'I4+$73.32 BOT. NO. 38 BY OTHERS14.32 CONSTRUCT 20 L F . TRANSITION STRUCTURE FROM 825.50 `` c rr rr r as P I N=14, 871.2 TO S Ems. 1 f , 800.5: STA. 0+10. 18 TA. 0+30.18 LINE G2 PER DETAILS 3 8. 43 H ' 31 �� ' CONSTRUCT WETLAND DRAIN INLET PER DETAILS ON SHEET 31. 4 a� _ 34 r - "G3" Z RCP nrnr _ 1 35 CONSTRUCT 12" DIAMETER PVC WETLAND DRAIN. w Iti s CATCH BASINS AT SAG / . �i T l`z. `Nppa, '� POINT IN "C" STREET 2 �� % '' ,o 1. IMITs QF r---- 38 CONSTRUCT BASIN INLET PER APWA STANDARD PLAN 351-0 • 03 ,-'� f of... GRAVED LAYER ALIGNMENT BY OTHERS � Q `" 8 ,� R� - �yCASE 2 SUBSTITUTE PVC FOR RCP SHOWN AND SUBSTITUTE STANDARD STEEL BAND FOR CONCRETE COLLAR SHOWN. CONSTRUCT RCP TRANSITION STRUCTURE PER DETAILS ON SHEET 26. PLAN - BASIN 109 WETLAND 7 FAIRWAY 13 REVISIONS APPROVAL I DATE I APPROVAL I DATE QROEESSr � a - 10 xp. 06130/00 CURVE DATA NO. DELTA LENGTH TANGENT RADIUS 4�? 17009'26" 26.95 13.58 90.00 ® 31°27'35" 49.42 25.35 90.00 55°38'08" 43.70 23.74 45.00 BENCH MARK: NO. 615 IJAS I S OF bEAK I NGS : THE BEARING OF N89.30'06"E ALONG THE RAILROAD SPIKE AT INTERSECTION NORTH LINE OF SECTION 30, TOWNSHIP 1 OF CITRUS AVE. AND LOS CEDROS AVE. NORTH RANGE 5 HEST SAN BERNARDINO IN POWER POLE NO. 9011E ON THE MERIDAN AS SHOWN ON RECORD SURVEY EAST SIDE OF CITRUS AVE. FILED IN BOOK 58, PAGE 5 OF RECORDS OF SURVEY WAS USED AS THE BASIS OF BEARING (P �2 ELEVATION: 1467.59 FOR THIS MAP 1 V 1\ ��\P JVI 111 I"I. I L I I LI'ILI-N Cyt rlJJUUrA I L>, II ll. A DIV15ION OF THE KEITH COMPANIE5, INC. EHGIHEERI/YG • MAHAGEMENT • PLAHHIHG 3151 Airway Avenue, 5uite Q-1, Costa Mesa, California 92626 oz1 "AS BUILT" DING. FEB. 2000 CITY OF FONTANA9 CALIFORNIA 112,,11iffill 1*1111-01 DRAWN BY: SIERRA LAKES SCALE: SK INFILTRATION BASIN AND WATER DUALITY WETLAND DESIGNED: STORM DRAIN SYSTEM H: 1" = 59' V: 1 = 5 DDV PLAN AND PROFILE. LINES G1.G2&G3 CHECKED:- DATE: MPV BASIN 109 WETLANDS 7 FEBRUARY, 1999 JOB NO. DWG. NO. SHEET NO. APPROVED�G��'yt )c000�r CITY ENGINEER R.C.E. 25126 2666 15 OF 31 z:\server\dgn\o79-41st\dgn\sd13