HomeMy WebLinkAbout2598-3DETECTOR
SCHEDULE
Y.NST
CHANNEL
DETECTOR
OPERATION
�
1
2-N-6
EXTENSION
2 1 3-N-6
CALL
3 1-N-1
EXTENSION
4 2-N-1
CALL
2
1
2-E-8
EXTENSION
2 3-E-8
CALL
3 1-E-3
EXTENSION
4 2-E-3
CALL
3
1
2-S-2
EXTENSION
2 3-S-2
CALL
3 1-S-5
EXTENSION
4 2-S-5
CALL
4
1 1
2-W-4
EXTENSION
2 3-W-4
CALL
3 1-W-7
EXTENSION
4 2-W-7
CALL
5
1
1-N-6
EXTENSION
2 1-E-8
EXTENSION
3 1-S-2
EXTENSION
4 14-4
EXTEN N
isa=rz
PHASE
DIAGRAM
I
i t II I
I
1'
�
SIGNAL MOUNTING
�
l
C
I
M
SIG.
PHASE 1
PHASE 2
PHA S 3
PHASE 4
QUAD
�- Now
PED.
1
II (
3 1
1
0
30
45 N
III
200 W
B
ZIII
N
MAS,MAS,SV-1—T N
PHASE 5
PHASE 61
PHASE 7
PHASE 8
�k NOTE: FOUNDATION FOR POLE WAS REMOVED
TO ONLY 48" BELOW FINISHED GRADE
DUE TO UTILITY CONFLICTS. 1-4
CITRUS
EXISTING RIGHT OF WAY
0
Q
Uj
J
0fn
s
QIII
�-
I
i t II I
I
III
BT.
SIGNAL MOUNTING
i t
I I
C
I
M
SIG.
LUM.
H.P.S.V.
TYPE
PHASE
QUAD
VEHICLE
PED.
I
II (
3 1
1
0
30
45 N
III
200 W
B
ZIII
N
MAS,MAS,SV-1—T N
SP-1—CSN
Arrow Blvd
10.5
4
2
1—A N
10'
—
—
—
� � �I'S
6 N
I`l
ril II I
XIII
U►
—
�
F
3
26-4-80
30'
45'
15'
200 W
B
6
E
MAS,MAS,SV-1—T
SP-1—CS
Arrow Blvd
18
2.5
4
1—A
10
—
—
—
B
8S
TOTAL
f
POLE SCHEDULE
�-
STANDARD
MASTARMS
LUMINAIRE
PED PUSH
BT.
SIGNAL MOUNTING
S.N.S.
PLACEMENT
C
TYPE
HT.
SIG.
LUM.
H.P.S.V.
TYPE
PHASE
QUAD
VEHICLE
PED.
MESSAGE
AB
3 1
1
26-4-80
30
45 N
15'
200 W
B
4 N
N
MAS,MAS,SV-1—T N
SP-1—CSN
Arrow Blvd
10.5
4
2
1—A N
10'
—
—
—
B
6 N
E
TV -1—T N
SP-1—CSN
—
g'
4'
3
26-4-80
30'
45'
15'
200 W
B
6
E
MAS,MAS,SV-1—T
SP-1—CS
Arrow Blvd
18
2.5
4
1—A
10
—
—
—
B
8S
TOTAL
TV -1—T
SP-1—CS
—
14'
2.5'
5
26-4-80
30'
35'
15'
200 W
B
8
S
MAS MAS SV -1—T
SP-1—CS
Citrus Ave
8'
5'
6
_ 1—A
10'
—
—
—
B
2
W
TV -1—T
SP-1—CS
—
11'
2.5'
7
26-4-80
30'
40'
15'
200 W
B
2
W
MAS MAS SV -1—T
SP-1—CS
Citrus Ave
3'
5.5
7
1—A
10'
—
—
3
I B
4
N
TV -1—T
SP-1—CS
—
9.5
5'
NOTE: ALL EQUIPMENT IS EXISTING UNLESS SHOWN OTHERWISE.
(N) - NEW EQUIPMENT ix
— y W
Id - "I nomr-
SCALE: 1`20'
1-1 /2"C. 2 DLC
"ENUe
Curb/Berm flow lir
or edge of should4
BCR
/ FH _ �` \4 1-1 /2"C, 1 DLC
-03-- ---- -----$PtiJ�6P�� — — — — — -
L
._._ 1 -_ EXISTING RIGHT OF WAY
EXISTING CURB AND GUTTER ( '� 1, I' � EXISTING CURB AND GUTTER
11 106 �- �8 08 r �-______-__ T
` I I RC 05` - -
cvLO
I�,
RC 1
CC �( ► ► ► I {2-N-6
---------- �. I I c L L _J _ 1� �1-N-s.
N _ _ _ 0 6 G =1 G — G — _ G — _ — G —N—
, �` � - � {- � � � � 3-N-�6 � 115' TO BACK.
- - II I I MH I L4_ _J LJ J LJ
10„S 2 S 5— I I S
-----__- ------��T 1-S-5 L- J}-
78” RCP ------------- - --- - -
f -1 ---
WV
r� L — 3 /1 _
E — _ \ s OF CROSSWALK
— — T —�—� — -L-� — — — T — :� — — — — — — — — — — — — — — — — — — — — — — — — — — — —
05'E-�___________________________-
-------y -L- --------------------------------------------------------------
i 1 1 2
-- -- --- --- --- --- --- — — — — — — — — — — — — — — — — — — V — — V V V y
.+.- O
230' TO BACK 2-S-2 115' TO ACK - - i I —
L 0 CROSSWAL � B 3 S 2 �i AB (�l — — T — — — — — —
EXISTING CURB AND GUT R L �I OF CROSSWALK - i T T T
S I �� 1�2 2 11—//-Z--
01 _
-------- - - - - ---------------______________�__—___ - - __ -__ ___-___-
EXISTING EDGE OF PAVEMENT
TEL - -- ------ % 4 "04 "T
- �! fTl
M EXISTING RIGHT OF WAY `y�� � 4P EXISTING RIGHT OF WAY
1-1 2 C 1 DLC 1_1/2"Cs
/ 2 DLC � �- - _ � /
1-1 L , v { - TRAFFIC SIGNAL CONSTRUCTION NOTES.
.
f2c,1c ,1 �I { _� �c2 As
_ 0
. 8 6FI
Il
i I 4 N {� X I �' _- ,,�.J j III I I 2 C, 3#6 #10
{ 1 t �i j "f
6 ILII ill — III II
SINGLE CONDUCTOR
SCHEDULE
CIRCUIT OR
AWG
CIRCUIT
8
I9
RUN
NUIDER
POLE
�J
1
_
2
_
3
-
4
-
5
-
6
-
#14
/1 VEHICLE
02 VEHICLE
MOUNTING. RELOCATE
EXISTING SIGNAL HEAD. FURNISH AND INSTALL NEW PEDESTRIAN HEAD/MOUNTING.
3
3 1
3
3
O3 VEHIaE
3 3 3 3 3
3
04 VEHICLE
- - - - 3
3
05 VEHIaE
- 3 3 3 3
3
06 01aE
- - - - -
-
07 VEHIaE
- - - 3 3
3
08 VEHIaE
3 3 3 3 3
3
02 PEDESTRIAN
- - 2 2 2
2
i4 PEDESTRIAN
- - - - 2
2
06 PEDESTRIAN
- 2 2 2 2
2
08 PEDESTRIAN
2 2 2 2 2
1 2
02 PPB
- - - 1 1
1
04 PPB
- - - - -
-
06 PPB
1 1 1 1 1
1
08 PPB
- 1 1 1 1
1
PPB COMMON
1 1 1 1 1
1
SPARES
3 3 3 3 3
3
TOTAL
13 19 24 28 33
33
#10
LUMINAIRE
2
2
2
2
-
-
SIGNAL COMMON
1 1 1 1 1
1
TOTAL
3 3 3 3 1
1
#6
SIGNAL SERVICE
3
DLC
PHASE 1
-
2
2
2
2
2
PHASE 2
- - - - -
-
PHASE 3
- - - 2 2
2
PHASE 4
4 4 4 4 4
4
PHASE 5
-- - - -
-
PHASE 6
- 3 3 3 3
3
PHASE 7
2 2 2 2 2
2
PHASE 8
- - - 3 3
3
TOTAL
5 10 10 15 15
15
OIPWOk CABLE FUliIRE
-
-
-
-
1
1
CONDUIT SIZE
2
30
3F—
3F
3.5 93.5
SIGNAL CABLE CONDUCTOR TABLE
CIRCUIT OR
RUNS
BOLTS AND CONSTRUCT 26-4-80 FOUNDATION. RELOCATE EXISTING 26-4-80 SIGNAL STANDARD AND LUMlMRE.
8
I9
CITY
AWG.
POLE
�J
POLE Q
1 1
1 1
1 1
1 1
�1
ANCHOR
BOLTS AND CONSTRUCT 1A FOUNDATION. FURNISH AND INSTALL NEW 10' 1A POLE AID TV -1-T SIGNAL HEAD
�� ��
MOUNTING. RELOCATE
EXISTING SIGNAL HEAD. FURNISH AND INSTALL NEW PEDESTRIAN HEAD/MOUNTING.
POLE 0
1
1 1
1
1;0/,1
1
AND
INSTALL
NEW CONDUIT AND PULLBOX AS SHOWN.
Uj
POLE
1
1
1 1
1
1
0
0
N
<'
Q I III I
r
I
M I
I N
III mI,
�
� ��IIi
M
� �
i
�
I
U
I O
C
�
TOTAL
3 3
3 3
3 3
2 2
o
10
ILUMINAIRE
� �
L16 II ",./ LL1 \, o/, I `n
a�ncaM cA�fvn� 2 z z EQ I III a i I zLij
E—a III I� 1-1/2'c. 1 DLC
CONDUIT SIZE 3 3 3 2
III
�
11� -_T 11 i
%JO 50
10I 1-E-8
DRAWING OF RECORD ` , ;, _III �
10/1/98 - NO CHANGES
DIAL TWO VCRKING
BEFORE DAYS REFIRE
YOU DIG YOU DIG
TOLL FREE 1-800-422-4133
A PUBLIC SERVICE BY UNDOMMM SERVICE ALERT
Y J
Q �
M N
O V)
F-�
� U
n V`
N 0
aFURNISH
NEW
ANCHOR
BOLTS AND CONSTRUCT 26-4-80 FOUNDATION. RELOCATE EXISTING 26-4-80 SIGNAL STANDARD AND LUMlMRE.
INSTALL
CITY
FURNISHED 45' MASTARM AND RELOCATE EXISTING STREET NAME SIGN AND SIGNAL HEADS.
FURNISH
AND
INSTALL
PEDESTRIAN HEAD/MOUNTING AND NEW SV -1-T MOUNTING.
�FURNISH
F
NEW
ANCHOR
BOLTS AND CONSTRUCT 1A FOUNDATION. FURNISH AND INSTALL NEW 10' 1A POLE AID TV -1-T SIGNAL HEAD
�� ��
MOUNTING. RELOCATE
EXISTING SIGNAL HEAD. FURNISH AND INSTALL NEW PEDESTRIAN HEAD/MOUNTING.
Q
INSTALL
6' DIAMETER TYPE "E" DETECTOR LOOPS PER CALTRANS STD. ES -5B AS SHOWN.
F41
FURNISH
AND
INSTALL
NEW CONDUIT AND PULLBOX AS SHOWN.
Uj
1-1 /2"C, 2 DLC
<'
Q I III I
I
M I
I N
III mI,
�
� ��IIi
M
� �
i
�
I
W
I I
I O
C
�
0
o
z
�
� �
I II
AJ
`
X �I � i
i
i�
I �
i
m
X
111 w�� .
IZ
L16 II ",./ LL1 \, o/, I `n
a�ncaM cA�fvn� 2 z z EQ I III a i I zLij
E—a III I� 1-1/2'c. 1 DLC
CONDUIT SIZE 3 3 3 2
III
�
11� -_T 11 i
%JO 50
10I 1-E-8
DRAWING OF RECORD ` , ;, _III �
10/1/98 - NO CHANGES
DIAL TWO VCRKING
BEFORE DAYS REFIRE
YOU DIG YOU DIG
TOLL FREE 1-800-422-4133
A PUBLIC SERVICE BY UNDOMMM SERVICE ALERT
Y J
Q �
M N
O V)
F-�
� U
n V`
N 0
aFURNISH
NEW
ANCHOR
BOLTS AND CONSTRUCT 26-4-80 FOUNDATION. RELOCATE EXISTING 26-4-80 SIGNAL STANDARD AND LUMlMRE.
INSTALL
CITY
FURNISHED 45' MASTARM AND RELOCATE EXISTING STREET NAME SIGN AND SIGNAL HEADS.
FURNISH
AND
INSTALL
PEDESTRIAN HEAD/MOUNTING AND NEW SV -1-T MOUNTING.
�FURNISH
F
NEW
ANCHOR
BOLTS AND CONSTRUCT 1A FOUNDATION. FURNISH AND INSTALL NEW 10' 1A POLE AID TV -1-T SIGNAL HEAD
�� ��
MOUNTING. RELOCATE
EXISTING SIGNAL HEAD. FURNISH AND INSTALL NEW PEDESTRIAN HEAD/MOUNTING.
Q
INSTALL
6' DIAMETER TYPE "E" DETECTOR LOOPS PER CALTRANS STD. ES -5B AS SHOWN.
F41
FURNISH
AND
INSTALL
NEW CONDUIT AND PULLBOX AS SHOWN.
5 PULL NEW SIGNAL CABLE/CONDUCTORS INCLUDING OPTiC01rt CABLE, AND REPULL EXISTING DLC IN RUNS A���
TO ACHIEVE DESIRED SIGNAL OPERATION.
TRAFFIC SIGNAL GENERAL NOTES:
1. TRAFFIC SIGNAL AND LIGHTING SHALL CONFORM TO THE STATE OF CALIFORNIA
STANDARD SPECIFICATIONS SECTION 86 AND STANDARD PLANS (DATED JULY 1992)
2. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR
SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS
ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF OBSTRUCTIONS.
PHONE UNDERGROUND SERVICE ALERT AT (t00)433-4131, TWO (2) WORKING DAYS
BEFORE DIGGING.
3. ALL PULLBOXES SHALL BE No. 5 AND CONDUIT SHALL BE 2' RIGID METAL UNLESS
SHOWN OTHERWISE. ALL VEHICLE HEADS SHALL BE PER SPECIAL PROVISIONS.
4. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT
LOCATIONS PRIOR TO FINAL PLACEMENT.
5. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
FONTANA ENGINEERING DIVISIQN PRIOR TO COMMENCEMENT OF WORK.
6. ALL TRAFFIC CONTROL, WORK ZONES AND LANE CLOSURES SHALL BE COMPLETELY
DELINEATED BY CHANNELIZATION DEVICES AND SHIELDED BY BARRIERS TO EXCLUDE
VEHICLE AND/OR PEDESTRIAN TRAFFIC. CONTRACTOR SHALL FOLLOW THE MANUAL
OF TRAFFIC CONTROL DEVICES FOR CONSTRUCTION AND MAINTENANCE WORK ZONES,
CALTRANS STANDARD SPECIFICATIONS AND STANDARD PLANS, LATEST EDITION. EXACT
LOCATION OF ALL TRAFFIC CONTROL TO BE APPROVED BY THE ENGINEER AND
ADDITIONAL WARNING AND/OR CONSTRUCTION SIG" MAY BE REQUIRED.
AUTOCAD FILENAME: CIT_ARR_SIG.DWG