Loading...
HomeMy WebLinkAbout2597-4N CONDUCTOR SCHEDULE A.W.G. SIZE POLE OR RUN � OR CABLE SIZE CIRCUIT -- Fumish and install Model �Ljk_,1Z4...,� "B" am per deta6, this ~ - POLE STRfAN Furnish and install R73-3 sign on sigW most cin per CAL114V C POLE A DetaN U. (Quantity " 2) 1 1 be dieconnected In 1 1 1 1 1 O Contractor to perforlr cabnit n"10d iC4j5W.1%aM by ECOMLI A0 N"s i i hough city. i i i 1 i POLEB TV- 1-T - 1 1 --+�- - - 1 1 1 1 1 ' N D MAS/MAS SP -1 -CS 2 20OW Citrus Ave E 1-A - -- 1' 2.5' TV- 1-T POLE I CC SP -1 -CS 2 1 1 1 24-4-80 1 , 1 1 2.5' SV- 1-T U C T 8 - on 20OW Randall Ave �S 1-A - - 1' 2.5' TV- 1-T - SP -1 -CS Pay D O --�- - - H 1 t 15' 1 1 - MAS/MAS - C 20OW Citrus Alva 1-A 1 1 5' 1 1 - SP -1 -CS 6 R 0 POLE 1 1 1 D Poll , C POLE ;a) 1 1 1 T 12 0 POLEQ t t t t R POLE ii �-� 1 1 1 1 1 1 1 1 TOTAL CAKES 3C/ 12C 1 Y2 3 3, 0 0 10 - 5 5 4 4 3 3 2 2 1 1 10 LUMINAIRES 2 2 - - 2 2 2 2 2 - G.F.C.I. 1 1 1 #6 SIGNAL SERVICE 2 2 2 - - 3 3 3 TOT #8 VIDEO COAXIALCABLE 1 1 2 2 - 21 1VIDEO POWER CABLE 1 1 2 2 - 21 g2'l 1OPTICOM CABLE 1 1 2 2 - 2 1 - CONDUIT SIZE (in.) Z 3 3j 3j 2 4 3j 3j 3 2j LAS = EXISTING CONDUIT TO REMAIN IN USE. • NEW CONOUIT RUK NOTES: CONDUCTOR SCHEDULE 1. Abandon conduit runs /g% and i9% as shown on the pillet. L...% L_A 2. Install new conduit runs & and & as shown on the pian. 3. ftnnove and disc ord all ccunatur tors and =$a from oonduit ruses mW Paissr 4. Install all new signal cables. *AAGE SENSOR cables and OPTK:OM cobbe per plan and the CONDUCTOR SCHEDULE. Factory provided TOM= to row+m connector coblw shipping} i Can 6 mount tubo (hole to face kw4f6 ire) �mox. n Woo & Town co inside mounting tubs. ..... ... hole and on luminaire -- into luminaire fixture. 3 ave required per pia! seem witho n rr*iW - �oanductone `' -` I r -- (] �eviiN hoary dul�r (t oowworter} Mr�Mol bieoit for lighting and I.S.U. Power, per special pro�ieiono. 2 Conned I.S.U. Powor j�bie (3- f 14 VNTC Coblefrom Video Interface Panel CoMnot 10 henry "y �io►ndn# block in Luminaire Head. Vides coaxial cable and Bolden #!!~2A1 ooaxW cabl& �4 I.S.U. Power Cable and ooaxiel Vides, Cable to run oowl4N . to vliM Pones isolion is, eonirrW e41116"t !S� _ UNt of V* Vises . NOT TO SCALE IMAGE SENSOR CABLE DETAIL CONSTRUCTION NOT Q -- rr stdil cfty fern wd 110M UW and bra" W SIGNAL MOINiTNQ 090 111,100t, NO. -- Fumish and install Model 711 OPTICOM DETECTOR on smost "B" am per deta6, this ~ - POLE STRfAN Q -- Furnish and install R73-3 sign on sigW most cin per CAL114V - Standard Ptah ES -6T. DetaN U. (Quantity " 2) 4 --AN loop detectors will be dieconnected In crd poli boxes orad B abei donld in phos,. 40' 15' S - Contractor to perforlr cabnit n"10d iC4j5W.1%aM by ECOMLI A0 N"s SP -1 -CS order required on purchase hough city. �C i r' I L 188 8ACK OF C/W �4m PHASE DIAGRAM EMERGENCY VEHICLE. PREEMPTION DETECTOR 1 1/20 TO 3& REDUCCER ASTRO Mini-Srac MOUW PELCO AB -121 OR APPROVED EQU& MAST -ARM MOUNTING CLAMP FOR MODEL 711 OPTICAL DETECTOR to s� ��aw� N irB'� 'Ip Ny Ci 9Sf W R.P. #2314089E P.P.#197971E a l s` � v ` ce �1 I (� it I I L -r J Val W V 1 O 32' 32' 0 44i U 1 W M ,� 0 mN r I AB I I i L_J L J POLE AND EQUIPMENT SCHEDULE POLE !IQlIAL STANDAW PLACEMENT DIMENSIONS SIGNAL MOINiTNQ PED PUSH BUTTONS NPOV KART AM ARROW LtJ�NA1M TiAw NAME SM 0 NO. SIGNAL MAST ARM L.tWAINAME MAST ARM "A" "B" POLE VEHICLE MAST ARM VEHICLE POLE STRfAN A 1-A - - 13' 4.0' TV -1-T - SP -1 -CS 6 --� - - B 26-4-80 40' 15' 17' 4.0' SV -1-T RIAS/HAAS SP -1 -CS 4 20OW Randall Ave �C i 1-A - - t' 2.5' TV- 1-T - SP -1 -CS 4 --+�- - - D 24-4-80 35' 15 1 ' 2.5' SV- 1-T MAS/MAS SP -1 -CS 2 20OW Citrus Ave E 1-A - -- 1' 2.5' TV- 1-T - - SP -1 -CS 2 --�- - - i: 24-4-80 35' 15' 1' 2.5' SV- 1-T MAS/MAS SP -1 -CS 8 - on 20OW Randall Ave �S 1-A - - 1' 2.5' TV- 1-T - SP -1 -CS 8 --�- - - H 24-4-80 35' 15' -9' 2.5' - MAS/MAS - - 20OW Citrus Alva 1-A 5' 2.5' TV- 1-T - SP -1 -CS 6 --- - - 11kj'J1Ti EIC iTING P E TO RE RELOCAT€O OR OR NM . X.,1INDICATES EXISTING POLE TO REMAIN AS IS. NOTES: POLE AND EQUIPMENT SCHEDULE 1. Remove and salvage existing POLES %AI and :� and 4. Remove an salvo ,existing lenses from W" hooft equipment. Remove existing foundations and anchor on POLES `B� and E.J. Install new tri -arrow lenses, bolts. BackfM holes with Class N Aggregate bass S. Remove and salvage existing 20' signal, most axrns, MAS compacted to 95% rela ive compaction• and signal heads from existing POLES %D:l and �Mj. insta 2. Install salvaged POLEA and equipment on new new 35' most arms with one additiond MAS on foundation as sho n on the pion. each pole. Install salvaged MAS and signal hood and 3. Instal new POB . Install sa eged equipment from install a new tri -arrow signal heed on the end of each existing POLE X81 on new POLE B new most arm. s,r r -i 7 ,� IABI 230' TO 1 BACK 4F C/W AS J W C S SCALE 1"=20' 4 fi 10 20 a i GENERAL NOTES 1. Aft work and i nalerial shown on thft V sh N confaiii to the Slots ofDepartment of Transportation (CAL AStandard Specifications and Standard Plans dated July 1992 and the Special Provisions for this project. �. An strtplrg, orld *+ or shall be completed at lecwt one day prior to the ache _ uled turn -on. I Obtain approval for exact equipffmO., crosswalk and RmR line location prior to n 4. All sited h and back Nates shall be metal twS city specificat AN lenses shah be 1Z -glees. Ad rod motions shah be per the Special Ptorisions. 3ti AN pull boxes shall be No. S unless shown otherwise on the pion or approved by the inspector in the field i. The CONDUCTOR SC"EDULE is furnishes,! as an inalaiLatfenguld Oneen4y. R shoes be the Contractor's responsibility to provide the correct conductors required for the intender! operation. NOTE: SPECIAL PROVISIONS FOR THIS WORK ARE ON FILE IN THE OFFICE OF THE CITY TRAFFIC ENGINEER C-111