HomeMy WebLinkAbout2378-23---
I 1111111 111111 I 111111111111111 111111 III I
1111I111 1111111 II 1111111 11111111111111 II 11111
II 11 1-0 1110 11111111 101!:
II I II 11111111111111111 II III
,111 11 .1111 I III 1111111111 11 11111111
11 II 1111
-
111111111111111[0111110111101111111.1110,'�-,~``
Inc.Igor Hall & tbreman,
Civil Engineering • Planning • Surveying • Public Works
13821 Newport Ave.. Suite 200 "Tustin, CA 92680-7803" 714/544-3404
PREPARED UNDER THE SUPERVISION OF:
REVISIONS
ENGR S
APPROVAL
JOHN C. HOGAN
R.C.E. 26229
CTY OFO\TA\A, CALPO\A
DRAWN BY .
R.A.
DESIGNED BY
R.A.
CHECKED BY
J.C.H.
JOB NO.
3828
PROGRESS SEC 0+00-8+00
SCALE:
HORIZ.: 1"=20'
VERT.: 1"=2'
FOOTHILL BOULEVARD ROUTE 66
APPROVED
DR. NO. SHT. NO.
78 23 OF ^�c�