HomeMy WebLinkAbout2360-1OS% .R.4.L .NOTSS
1 .gill work shall be done in accordance with this plans, standard
specifications jbr public works construction "the Green Book and
the city of .Fontana Public Xorks Department Standard Specifications
dated 1976, and any revision thema, lrer.
,2 Construction permits shall be obtained from the City of Fontana Public
Xorks Department prior to the stars of any work within the city city limits
3 1411 exposed concrete shall conArm in grade, color and fznash to all
adjoining curbs and sidewalks
q Adequate stakes shall be set by the Sngineer to enable the contracter to the
work to the plan grades
S' 1411 pages or substructures of any kind all telephone or power poles, water
meters, valves, hydrants, irrigation structures, etc., shown or not shown on
this plan and located within areas to be improved and interfering with
construction, shall be relocated by others It shall be the contractor's
responsibilty to notify,/ all of the agencies concerned beybre construction begins
6 The contractoiKs) shall coorYinate construction with all utilities and other
improvements including, but not limited to, gas, telephone, electrical, lighting
television cable, landscaping, landscaping irrigation, domestic water, reclaimed
water, sewer, storm drainage, ,Mood control systmes, etc.
7' Type, location and width of driveway approach aprons will be determined at the
time of construction and shall conlbrm with the City of Fontana standanY details
8 Contractor is instructed to refer to this plan and the specifications, and where
there is or may be a con,�'Sict shall immediately report said confict or possible
con,lficl to the owner's representative.
9 SterVant required under all AC. pavement
10 411 utility companies shall be given o& hours notice prior to work around their
jbcilil?es
11 Protective measures shall be taken by the contractor so as not to cause any mud,
silt or debris to be deposited onto public or adjacent property at all times during
construction. 4ny mud or debris on public property shall be removed immediately.
Dust shall be controlled by watering or other approved method throughout the
grading and construction operations
12 Care should be taken to prevent grades, ditches and swales from undermining
street improvements Upon inspection of the site, the City Z'ngineer may require
temporary gunite swales, enteHnq or leaving improvements
P.r,Y.�ac,�lva►' .�rAs
1. The City Public Forks Inspector may require at hisl4er own discretion, that the
contractor submit a soils report with calculated "R "* values and gravel equivalents
jbr the verification of a proper pavement thickness
,2 Pavement sections shown are minimum and subAct to revision and approval of the
City as may be required b y soils test taken a f er completion of rough grading.
7 �
SC" >.�ro J'Y17.R
r 1=.e MAr
Br" 1/.4JII!? y h
S..RCis .8Af. >5-49 N. Ar. Cot h dWpw .4butOwnt Sa
SM&P rmeuay & Kest S"i Sis"v .4m 5,8. S So
of R A 1 her Ar Top &ss Chau XLXV = 1»O. S09 4pn ,251-,20,2- 03 4pn ,25>-,20,2- 04 �' 4 4pn 251-,202- 05
era sfs77s M.R .ern stoa
O /
Jr 9S. 06 FL -9q.35
Zzist Subcurbr, `I PSP J? ��xast CL Fence Sidewalk
/;'
Wa%&� re-.
4 ` J� r s > Craa&r to '4ecopi Prainasw .�xfsT ,R/�►r
I d4
4.
19000
1 JFZist T- 0. 40 27-70 FL 93.9,2 1 : p� X{/ 18.OD�/,a, 5 r a' S `. zZist '' O. �6 y 2 00 B exist Curb &Gutter 9 18.00
Y/00 FL ^93.98 � OHO `Ori�� y —
2 00 ------------------ ------- �9 18.00 NB9 .BSS 1S~i�' Y
�'xist - - - _�-Tzist Curb & Gutter 18.00
3000 _ 1
AxIST R/�' Exist Sidewalk
PRIVATE ENGINEER'S NOTES TO CONTRACTOR
CORMACTOR AaRUS rAAT Jc SHALL assure SOLE ARD COME= RESPOSMMIrT POR
CONDITIONS DUAW rBa COME OF CONBTMMON OP TJRS PROJlff. INCLUDIAC
SAFZTY OY ALL MOONS AND PJtOPRJWr. TRAT rffiS MQUIREWWWr SHALL APPLY
COMINUMPS r IND Aw as mjaTaDTO NVXNAL wow HOURS; AND MAT MY
WATAACPOR SHALL DaIaND INDaMMfY AND BUD TER ffN= M CIVIL AMINUA
AND rsa CRY �S FROM ANF AND Au Id/DIIJrr, Jim OR II.LicirD
IN CONN=10N VMS TER PSWOMAWN OF TORN ON MS PJWJ=,alClPr r+OR
LZABUIff ARISING FROM THT SOLE MUGNME OF rBF 01rMM OR XMIN"A
Mr ZMSTX NCa IID LOCATION OY ANr UNDIRAROUXD o7111Tr PIPaS, CONDUITS
OR ST SROWN ON THESE PLANS ARF 0ATA1NU Br A SSARCA oP rAT
AVAILABLE RNWRAY, To rfla BM OY WR MYOWLEDOa MUM ARE MT axrSrIM
UTILMNS 1'ICZPT IS SHffN ON VHJSX PLANS TAI' CO NMACTOR IS REQUIRSD
TO 1AJGr DUX PRWAUr10NARY "ASURES r0 PROrsCT rNs U Uff LINaS SROWN
ON Tessa DRAWAVS. rRR COMUCTOR PURTAZR ASSUMss ILL LIABILITY AND
RESPOWSIBILPff POR rAa UrILmr PIPSS.CONDUIrs. OR STJKXmRss SEVVY
OR NOr SROWN ON TMUff DRAUIMS.
f
L
2' 2' i cut
i) -lo' overlay
Grade
--
S9- _ —
�xist Pa v 't
Grade Per Plan
SzrT r0dV
CONSTRUCTION NOTES: Astim * jbr l*rmst
s O'»ly
O CONSTRUCT 8" CURB & GUTTER PER CITY STD. 10f 16s if
Q CONSTRUCT SIDEWALK PER. CITY STDS /05-.4 s09•! 5
® CONSTRUCT DRIVEIPAY PER CITY STD.DETAIL 102-C 9s0 sV
® CONSTRUCT 0.38' A.C. PAvzmzNT OVER f2" C0mPACTIs'D NATIVE SOIL ," tons
® aFXRZT XXIST. #VIT. f O. >O' .4C 16 tons
® SAIICUT AND REMOVE EXIST. PAV'T
AfAV PA' AxIST P.�d VXJ AVT "P COM* T.R P. rzo SAS.4m tla ss' XCj
SC" 1-•410 A10..R
q "GONG
1 0 ' CF
1 '
S g PI CF
\- Weaken P. Jt
Top of Curb 1 'R„.--Frof t Z'dge of Sidewalk 9 "CF ,
FL
#eaken Pland Joint q "R
Zxp&nsion Joint
,0RIP�'1F.�4Y SFCTION OF CURB F14CZ
PROP
R
5
1i
FR�'1�'ApAY
SAN prRNAJWINO
PRO,!ArT.
BOYLX b�lAVX
4
110,
SL0VL'R I I '4 V -X
N
h
.1
1
kft
0.
tft
xi
t
PIC
.JW
I W&
O
O
h
.=Ra
Qk
114j:
06
OS% .R.4.L .NOTSS
1 .gill work shall be done in accordance with this plans, standard
specifications jbr public works construction "the Green Book and
the city of .Fontana Public Xorks Department Standard Specifications
dated 1976, and any revision thema, lrer.
,2 Construction permits shall be obtained from the City of Fontana Public
Xorks Department prior to the stars of any work within the city city limits
3 1411 exposed concrete shall conArm in grade, color and fznash to all
adjoining curbs and sidewalks
q Adequate stakes shall be set by the Sngineer to enable the contracter to the
work to the plan grades
S' 1411 pages or substructures of any kind all telephone or power poles, water
meters, valves, hydrants, irrigation structures, etc., shown or not shown on
this plan and located within areas to be improved and interfering with
construction, shall be relocated by others It shall be the contractor's
responsibilty to notify,/ all of the agencies concerned beybre construction begins
6 The contractoiKs) shall coorYinate construction with all utilities and other
improvements including, but not limited to, gas, telephone, electrical, lighting
television cable, landscaping, landscaping irrigation, domestic water, reclaimed
water, sewer, storm drainage, ,Mood control systmes, etc.
7' Type, location and width of driveway approach aprons will be determined at the
time of construction and shall conlbrm with the City of Fontana standanY details
8 Contractor is instructed to refer to this plan and the specifications, and where
there is or may be a con,�'Sict shall immediately report said confict or possible
con,lficl to the owner's representative.
9 SterVant required under all AC. pavement
10 411 utility companies shall be given o& hours notice prior to work around their
jbcilil?es
11 Protective measures shall be taken by the contractor so as not to cause any mud,
silt or debris to be deposited onto public or adjacent property at all times during
construction. 4ny mud or debris on public property shall be removed immediately.
Dust shall be controlled by watering or other approved method throughout the
grading and construction operations
12 Care should be taken to prevent grades, ditches and swales from undermining
street improvements Upon inspection of the site, the City Z'ngineer may require
temporary gunite swales, enteHnq or leaving improvements
P.r,Y.�ac,�lva►' .�rAs
1. The City Public Forks Inspector may require at hisl4er own discretion, that the
contractor submit a soils report with calculated "R "* values and gravel equivalents
jbr the verification of a proper pavement thickness
,2 Pavement sections shown are minimum and subAct to revision and approval of the
City as may be required b y soils test taken a f er completion of rough grading.
7 �
SC" >.�ro J'Y17.R
r 1=.e MAr
Br" 1/.4JII!? y h
S..RCis .8Af. >5-49 N. Ar. Cot h dWpw .4butOwnt Sa
SM&P rmeuay & Kest S"i Sis"v .4m 5,8. S So
of R A 1 her Ar Top &ss Chau XLXV = 1»O. S09 4pn ,251-,20,2- 03 4pn ,25>-,20,2- 04 �' 4 4pn 251-,202- 05
era sfs77s M.R .ern stoa
O /
Jr 9S. 06 FL -9q.35
Zzist Subcurbr, `I PSP J? ��xast CL Fence Sidewalk
/;'
Wa%&� re-.
4 ` J� r s > Craa&r to '4ecopi Prainasw .�xfsT ,R/�►r
I d4
4.
19000
1 JFZist T- 0. 40 27-70 FL 93.9,2 1 : p� X{/ 18.OD�/,a, 5 r a' S `. zZist '' O. �6 y 2 00 B exist Curb &Gutter 9 18.00
Y/00 FL ^93.98 � OHO `Ori�� y —
2 00 ------------------ ------- �9 18.00 NB9 .BSS 1S~i�' Y
�'xist - - - _�-Tzist Curb & Gutter 18.00
3000 _ 1
AxIST R/�' Exist Sidewalk
PRIVATE ENGINEER'S NOTES TO CONTRACTOR
CORMACTOR AaRUS rAAT Jc SHALL assure SOLE ARD COME= RESPOSMMIrT POR
CONDITIONS DUAW rBa COME OF CONBTMMON OP TJRS PROJlff. INCLUDIAC
SAFZTY OY ALL MOONS AND PJtOPRJWr. TRAT rffiS MQUIREWWWr SHALL APPLY
COMINUMPS r IND Aw as mjaTaDTO NVXNAL wow HOURS; AND MAT MY
WATAACPOR SHALL DaIaND INDaMMfY AND BUD TER ffN= M CIVIL AMINUA
AND rsa CRY �S FROM ANF AND Au Id/DIIJrr, Jim OR II.LicirD
IN CONN=10N VMS TER PSWOMAWN OF TORN ON MS PJWJ=,alClPr r+OR
LZABUIff ARISING FROM THT SOLE MUGNME OF rBF 01rMM OR XMIN"A
Mr ZMSTX NCa IID LOCATION OY ANr UNDIRAROUXD o7111Tr PIPaS, CONDUITS
OR ST SROWN ON THESE PLANS ARF 0ATA1NU Br A SSARCA oP rAT
AVAILABLE RNWRAY, To rfla BM OY WR MYOWLEDOa MUM ARE MT axrSrIM
UTILMNS 1'ICZPT IS SHffN ON VHJSX PLANS TAI' CO NMACTOR IS REQUIRSD
TO 1AJGr DUX PRWAUr10NARY "ASURES r0 PROrsCT rNs U Uff LINaS SROWN
ON Tessa DRAWAVS. rRR COMUCTOR PURTAZR ASSUMss ILL LIABILITY AND
RESPOWSIBILPff POR rAa UrILmr PIPSS.CONDUIrs. OR STJKXmRss SEVVY
OR NOr SROWN ON TMUff DRAUIMS.
f
L
2' 2' i cut
i) -lo' overlay
Grade
--
S9- _ —
�xist Pa v 't
Grade Per Plan
SzrT r0dV
CONSTRUCTION NOTES: Astim * jbr l*rmst
s O'»ly
O CONSTRUCT 8" CURB & GUTTER PER CITY STD. 10f 16s if
Q CONSTRUCT SIDEWALK PER. CITY STDS /05-.4 s09•! 5
® CONSTRUCT DRIVEIPAY PER CITY STD.DETAIL 102-C 9s0 sV
® CONSTRUCT 0.38' A.C. PAvzmzNT OVER f2" C0mPACTIs'D NATIVE SOIL ," tons
® aFXRZT XXIST. #VIT. f O. >O' .4C 16 tons
® SAIICUT AND REMOVE EXIST. PAV'T
AfAV PA' AxIST P.�d VXJ AVT "P COM* T.R P. rzo SAS.4m tla ss' XCj
SC" 1-•410 A10..R
q "GONG
1 0 ' CF
1 '
S g PI CF
\- Weaken P. Jt
Top of Curb 1 'R„.--Frof t Z'dge of Sidewalk 9 "CF ,
FL
#eaken Pland Joint q "R
Zxp&nsion Joint
,0RIP�'1F.�4Y SFCTION OF CURB F14CZ
PROP
R
5
1i
FR�'1�'ApAY
SAN prRNAJWINO
PRO,!ArT.
BOYLX b�lAVX
4
110,
SL0VL'R I I '4 V -X
N
h
VICINITY a94P
AYIST
R
3
1 -1
50
'ope Par. A C Fca}her
EXIST PAV'T 1 /4 ” J'
.EXIST IMPROV.
TYPICAL SECTION