HomeMy WebLinkAbout2367-M-1Af\
Fz�
on
6
C7
Z
Z
D
ccM
—RECORD DRAWING
THESE RECORD DRAWINGS (AS -BUILT DRAWINGS)
HAVE BEEN PREPARED BASED ON INFORMATION
SUBMITTED, IN PART, BY OTHERS. WHILE THIS
INFORMATION IS BELIEVED TO BE RELIABLE,
WOLFF/LANG/CHRISTOPHER ARCHITECTS, INC.,
HAS NOT VERIFIED THIS INFORMATION AND IS NOT
RESPONSIBLE FOR ITS ACCURACY OR ADEQUACY,
NOR FOR ANY ERRORS OR OMISSIONS WHICH MAY
HAVE BEEN INCORPORATED INTO THESE
DOCUMENTS AS A RESULT.
Certificate Of Compliance(Part 1 of 2) Performance Requirements CF -1B
FONTANA FIRE #77 2\91 For Enforcement Agency Use only
Project Title Date OT Leif t care
WOLFF LANG1CHRISTOPHER ARCHITECTS
MojectArChltec ngineer Buitding Permit Number
Project Location Plans ChecKed By a e
FONTANA CA.
I y own Field Checkedy D a e
JEFF DISCOUNT/J.H.E. (714)544-0636
ocumen a ton u or irm Yetepnone Approved By Date
Principal Designer. The proposed building wit t be in sub-
stantial compliance with the California Building Energy
Efficiency Standards provided it is built according to the
plans and specifications and provided future improvements are
completed according to the requirements indicated on this
Certificate of Compliance. The plans end specifications have
been prepared to include all significant energy conservation
features required for compliance with the Standards. Building
areas that are unconditioned and/or not subject to the
standards are indicated on the plans.
2\91 2\91
ans dated specs dated
Signature Date
LARRY WOLFF/A.I.A.
Name It e
WOLFF/LANG/CHRISTOPHER ARCHITECTS
ortpany
10470 FOOTHILL BLVD.
ress
RANCHO CUCAMONGA CA.91730
City/State/Lip
(714)987-0909 C19064
TeLephone Cal. License NO.
Owner. The energy conservation features and performance
specifications indicated on this document and on the plans
and specifications shall apply to future alterations, unless
compliance is demonstrated anew and a new Certificate of
Compliance is submitted. A copy of this Certificate will be
retained and transmitted to future tenants, subsequent owners
or others with responsibility for making improvements or
modifications to the building. If this certificate is lost,
a new Certificate may be required before a permit is issued
for alterations. Unconditioned areas are indicated on the
plans and, if these areas are conditioned in the future, they
must be made to comply with the applicable energy standards
then in effect.
signature Date
Name/Titte
CITY OF FONTANA
ompany
8353 STERRA AVE.
Address
FONTANA,CA.92335
city/state/tip
Enforcement Agency. The proposed building, and future
alterations will comply with the California Building Energy
Standards, provided future alterations meet the requirements
indicated on this Certificate and all applicable mandatory
measures, as long as the building occupancy type remains
unchanged.
Signature Date
Name/Titte
Company
Address
City/State/Zip
,
Energy Analyst The energy performance analysis summarized
below was performed using an approved CEC calculation method
with CECapproved fixed and restricted engineering inputs for
the applicable clima one and occ y type, and using an
appropriate repr at on of buitdi zoning and physical
conf' r tion. 'Al i ,cant ener y conservation features
a lis ow, n attached / lement.
sign ure v uaLe
JO HAMMOND/P.E.
Nfme/T It le
JON HAMMOND ENGINEERS
Proposed
Company
1
2472 CHAMBERS RD.
30.38
h-F-sf/Btu
ress
Average Exterior Floor Rt.
TUSTIN CA.92680
h-F-sf/Btu
t
y a e ip
0.72
(7 14) 544-0636
4
letephone
315
General Reference
5
1
Unconditioned or Multi -tenant shell?...
NO
2
CEC Occupancy Type.......... LOW RISE
OFFICE
3
UBC Occ. Group/Division..... 6-Z
Average SC (Roof)........
4
Climate Zone................10
5
Conditioned Floor Area ...... WS -1A
4150 sf
6
Unconditioned Floor Area....
sf
7
Budget Table(fr. Standards).2-53R
8
All. Energy Budget(WS-1A)... WS -1A
189.01 kBtu/sf-yr
9
Calc.Method CEC Code/Date ...SCM 2.OH
10
Multiplier ..................INCL.
11
Calculated Energy Use....... 176.9
kBtu/sf-yr
Envelope
Requirements
12
Average Roof/Ceiling Rt ..... CF -2
30.38 h-F-sf/Btu
13
Average Exterior Floor Rt...
h-F-sf/Btu
14
Average Opaque Wall Rt ...... CF -2
0.72 h-F-sf/Btu
15
Glazing Area in Watt ........ CF -2
315 of
16
Average SC (wall glazing) ... CF -2
0.75
17
Glazing Area in Roof........
sf
18
Average SC(Roof glazing)....
Ughling Requirements
19
Allowed Whole Building LPD..
watts/sf
20
Allowed Common Areas LPD....
watts/sf
21
Allowed Tenant Space LPD....
watts/sf
22
Package Lighting Reduction..
watts/sf
23
Lighting Controls Required?.
(Y/N)
Mechanical Requirements
24
System Type ...............
25
Unit Fan Power .............
watts/cfm
26
Rated Cooling Efficiency....
8.5 EER (units)
27
Rated Cooling Capacity...... WS -4A
136.7 kBtu hr (units)
28
Rated Heating Efficiency .... 79 %
(units)
29
Rated Heating Capacity...... WS -4A
239.2 kBtu hr (units)
30
Economizer Cooling?........
Y (Y/N)
31
CF -1X Attached? ....................
(Y/N)
EEM Form Revised September 1988 Page of
Certificate of Compliance (Part 2 of 2) Performance Compliance CF -1B
FONTANA FIRE #77 2\91 4150 For Enforcement Agency Use Only
Fr6ject TI vale BY er t ica a r. rea
JEFF DISCOUNT/J.H.E. (714)544-0636 OFFICE
Documentation u or irm T a I ep,one ETC occ. Type Ptan Checked By Date
Nota. More than one Part 2 may be submitted but all must reference the same Part 1. The person responsible for design compliance
for each major building system acknowledges the following compliance statement by signing the appropriate space below.
Compliance Statement The proposed building improvements substantially comply with the requirements indicated on the Certificate
of Compliance for this building, dated Theplans and specifications include the significant energy conservation features
and the compliance documentation is consisTtent with the plans and specifications.
Envelope Allowed
Proposed
2 91
1
Average Roof/Ceiling Rt...
30.38
h-F-sf/Btu
2
Average Exterior Floor Rt.
q0 --2-;;517-o0
h-F-sf/Btu
3
Average Opaque Wall Rt....
0.72
h-F-sf/Btu
4
Glazing Area in Wall......
315
of
5
Average SC (Wall)........
0.75
My/state/Zip
6
Glazing Area in Roof......
9340
sf
T
Average SC (Roof)........
Date
Other requirements:
Lighting
8 Basis of Al lowed LPD...... TSI LO f? -F- t]
Allowed Proposed
9 LPD ......................
12 watts/sf
10 Package Lighting Reduction — watts/sf
11 Adjusted LPD .............. I.2 2 watts/sf
12 Lighting Control Credits...........t J (Y/N)
Other requirements:
• %—jaIU' r.
IVA 01a
stgn,axurev v- nate
JON HAMMOND/P.E.
46me/Titte
ON HAMMOND ENGINEERS
w- any
2472 CHAMBERS RD.
Address
TUSTIN CA.92680
t y a e ip
(714)544-0636 11712
Tee one Cal. License No.
Entorcemerit Date
NEW CONSTRUCTION
txtent oT improvements
•1?
2 91
2 N 91
P ans aatea
Specs cated
Signature
Date
HARRY MACDONALD/ENGINEER
q0 --2-;;517-o0
Aaoe i e
M/P ENGINEERS INC.
Company
3828 W. COMMONWEALTH
AVE.
Address
FULLERTON CA.92633
My/state/Zip
(714) 6803044
9340
eLepnone
Cat. License No.
n orcemen
Date
Mechanical Allowed Proposed NEW CONS ION
13 Unit Fan Power............ watts/cfm x 9 o ro en s /17 9 1
ans a pets clat
14 Rated Coding Efficiency.. 8.5 EER (units) aur a.!
15 Rated Cooling Capacity.... 136.7 kBtu hr (units) i9y HAMMOND P.E.
a 56 t e
16 Rated Heating Efficiency.. (units)JON HAMMOND ENGINEERS
17 Rated Heating Capacity... _ 239.2 kBtu hr (units>r47n
2472 CHAMBERS RD.
18 Economizer Cooli•,g?....... _ Y (Y/N) A.ss >
19 Simultaneous heat/cool?... (Y/N) TUSTIN CA.92680 J
Other requirements: C -7S-BT-e� t� --� - '� 1
(714)544-0636. 11712
Te"�c�6nc.- a ,cense No.
Date
EEM Form Revised September 1988
Page of
CITY OF
FONTANA
FIRE STATION
NO.
w+wwuu��
r�
V •
FONTANA COMMUNITY
DEVELOPMENT DEPARTMENT
CENTRAL VALLEY
FIRE PROTECTION DISTRICT
CONSULTANT
JON HAMMOND ENGINEERS
Enginoerin8 Consultant
2472 Chambers Road, Suite 130
Tustin, CA 82680
(714) 544-0636
APPROVED
[,COMPLIANCE SHEET
DRAWN
•1?
CHECKED
' •N.
DATE
3✓11
SCALE
000 s
J06 No.
q0 --2-;;517-o0
M—lAl
[)wc, Wb. 23a'l