HomeMy WebLinkAbout2366-M-1Ad
c�
Z
Z
Q
M
EEM Form Revised September 1988 Page of
Envelope Allowed
Certificate Of Compliance(Part 1 of 2)
Performance Requirements CF -1B
1 Average Roof/Ceiling Rt...
FONTANA FIRE #74 8-27-90
For Enforcement Agency Use only
2 Average Exterior Floor Rt.
Project Ti Dateo er t tca e
Photocell sensors with • diffusing cover and
3 Average Opaque Wall Rt....
WOLFF LANG CHRISTOPHER ARCHITECTS
h-F-sf/Btu
4 Glazing Area in Watt......
Froject ArChltect/Lngineer
Building Permit Number
5 Average SC (Walt).........
1 1500 V I L-l.Al 1% D,
U
Manufacturer's instructions provided for installation
Project Location
Plans Checked By Date
D Insulation installed to meet flame spread and smoke
FONTANA CA
and calibration per 2-5319(e)6 ......................
12 Lighting Control Credits............ N
Ci y own
Field Checkedy DaFe__
t]
JEFF DISCOUNT/J.H.E. (714)544-0636
Rated Heating Efficiency..
o"ny
3828 W. COMMONWEALTH AVE
Documentation of or trm IeLephone Approved By Date
(units)) N "'MOND ENGINEERS _
Principal Designer. The proposed building will be in sub-
Energy Analyst The e y performance angl,ysis summarized
below was performed ing an approved CEC c4(culation method
378.0
stanttal compliance with the California Building Energy
Efficiency Standards provided it is built according to the
with CECapproved fi a r tricted engineering inputs for
luminaires only within daylit area per 2-5319(e)8....
plans and specifications and provided future improvements are
the apAicable c h to zo a occupancy type, and using an
'ti
U Retrofit insulation specified as per 2-5313 .........
completed according to the requirements indicated on this
app r at repgese t �df building zoning and physical
fig at /All g scant energy conservation features
Certificate of Compliance. The plans and specifications have
been prepared to include all significant energy conservation
are It ted l n attached supplemen
features required for compliance with the Standards. Building
/ `•
Lat. License No.
areas that are unconditioned and/or not subject to the
r ��
Entorcement
standards are indicated on the plans.
9/90
tg ure a e
J HAMMOND ENG. M.E.
caulking of joints and openings in exterior walls,
section 2-5317..........
P ans ins
J N HAMMOND ENGINEERS
Company
signature a e
2472 CHAMBERS RD.
1171
KELLEY NEEDHAM/ARCHITECT
Address
Name/Titte
TUSTIN CA.92680
Cat. Lic
WOLFF/LANG/CHRISTOPHER ARCHITECTS
city/state/zip
Visible or sudible malfunction alarm per 2-5319(8)... ELECT.
nY
714 544-0636
D
10470 FOOTHILL BLVD.
Tetephone
Address
General Reference
RANCHO CUCAMONGA CA . 917 3 0
1 Unconditioned or Multi - tenant shell?... NO
U Independent control w/enclosed areas per 2-5319(a)..g s —
t y a e tp
(714) 987-0909 C19064
2 CEC Occupancy Type.......... LOW RISE OFFICE
Tete one Cal. License No.
3 UBC Occ. Group/Division..... 0
U Reduction of lighting toad to at least one half per
Owner. The energy conservation features and performance
4 Climate Zone................10 0
NA
specifications indicated on this document and on the plans
2-5319(c). Occupancy sensors or programmable timers
and specifications shall apply to future alterations unless
5 Conditioned Floor Area ...... WS -1A 4661 sf
compliance is demonstrated anew and a new Certificate of
6 Unconditioned Floor Area .... 0 4415 sf
Certified HVAC equipment per 2-5314(a)...............
Compliance is submitted. A copy of this Certificate will be
El Seperste switching of daylit areas per 2-5319(d)....E-5
retained and transmitted to future tenants, subsequent owners
7 Budget Table(fr. Standards).2-53R 0
P-1
or others with responsibility for staking improvements or
8 Alt. Energy Budget(WS-1A)... WS -1A 188.99 kBtu/sf-yr
U Seperate switching of display and valance lighting
modifications to the building. If this certificate is lost,
Heating and cooling equipment efficiency
2-5314(b)
N-1
a new Certificate may be required before a permit is issued
9 Catc.Method CEC Code/Date...SCM 2.OH 0
for alterations. Unconditioned areas are indicated on the
10 Multiplier ..................INCL 0
plans and, if these areas are. conditioned in the future, they
I)
Pilotless ignition of gas appliances per 2-5314(c) ...
must be made to comply with the applicable energy standards
11 Calculated Energy Use....... 150.8 0 kBtu/sf-yr
and wholesale stores per 2-5319(h)..................11A
then in effect.
Envelope Requirements
M-6
12 Average Roof/Ceiling Rt ..... CF -2 29.21 h-F-sf/Btu
U
signature Date
13 Average Exterior Floor Rt...O 0 h-F-sf/Btu
KERSTIN KOBLIK /PROJECT COORDINATOR
14 Average Opaque Wall Rt ...... CF -2 0.72 h-F-sf/Btu
Nwie/Titte
CITY OF FONTONA
15 Glazing Area in Wall ........ CF -2 675 sf
ompany
16 Average SC (wall glazing) ... CF -2 0.95
A353 STIERRA AVE.
17 Glazing Area in Roof ........ CF -2 120 of
Address
FONTANA CA.92335
18 Average SC(Roof glazing) .... 0.75 0
t y a e t p
Ughting Requirements
Automatic exhaust fan dampers per 2-5316(b)..........
M-1
19 Allowed Whole Building LPD..1.10 0 watts/sf
Controls (when applicable)
Enforcement Agency. The proposed building, and future
20 Allowed Common Areas LPD .... 0 0 watts/sf
alterations will comply with the California Building Energy
21 Allowed Tenant Space LPD .... 0 0 watts/sf
U
Standards, provided future alterations meet the requirements
P-2
Indicated on this Certificate and sit applicable mandatory
22 Package lighting Reduction..0 0 watts/sf
Ventilation provided per 2-5316 and 2-5343 ...........
measures, as long as the building occupancy type remains
23 Lighting Controls Required?.0 0 (Y/N)
per 2-5319(e)l......................................ELECT.
unchanged.
Ventilation and recirculation air quantity
Mechanical Requirements
information provided per 1403(b)3....................M-2
24 System Type ............... PKG. GAS/ELEC UNITS
RECORD DRAWING
signature Date
25 Unit Fan Power..............0.90 0 watts/cfm
Heaters for domestic hot water and/or pools
Namenitte
26 Rated Cooling Efficiency.... 8.4 MIN 0 EER (units)
27 Rated Cooling Capacity...... WS -4A 279.0 kBtu hr (units)
Company
28 Rated Heating Efficiency .... 79X 0 (units)
Aaaress
29 Rated Heating Capacity...... WS -4A 378.0 kBtu hr (units)
HAVE BEEN PREPARED BASED ON INFORMATION �
per 2-5319(e)3 ......................................
30 Economizer Cooting?......... YES (Y/N)
t y a e tp
31 CF -IX Attached? ..................... NO (Y/N)
U step switching devices with separation between
EEM Form Revised September 1988
Page of
i
Mandatory Measures Checklist MF -1
Certificate of Compliance (Part 2 of 2) Performance Compliance CF -1B
FONTANA FIRE 074 For Enforcement Agency Use Only
FONTANA FIRE #74 8-27-90
4661 For Enforcement Agency Use Only
Project Title
JEFF DISCOUNT/J.H.E. 8-27-90
rojec t oaeoCertificate r. Area
JEFF DISCOUNT/J.H.E. (714)544-0636 OFFICE
Documentation AU or trm Ften Y uste
Documentation Author7irm a ephone CEC
occ. PLan Checked By Date
. I The Checklist is applicable to both First and SecondGenerationNonresidential Standards Compliartte.
WOLFF/LANG/CHRISTOPHER ARCHITECTS, INC.,
Note. More than one Part 2 may be submitted but all must reference
the same Part 1. The person responsible for design compliance
Reference in Reference in
for each major building system acknowledges the following compliance statement by signing the appropriate space below.
Construction Construction
Compliance Statement The proposed building improvements substantially comply with the requirements indicated on the Certificate
Documents Documents
of Compliance for this building, dated Theplans and specifications include the significant energy conservation features
and the compliance documentation is coasts-' tent with the plans and specifications.
EEM Form Revised September 1988 Page of
Envelope Allowed
Envelope Measures
NEW CONSTRUCTION
1 Average Roof/Ceiling Rt...
29.21
h-F-sf/Btu
2 Average Exterior Floor Rt.
U
Photocell sensors with • diffusing cover and
3 Average Opaque Wall Rt....
0.72
h-F-sf/Btu
4 Glazing Area in Watt......
no opaque cover per 2-5319(e)5 ......................
sf
5 Average SC (Walt).........
U Certified insulation materials per 2-5311(s) ........ ARCH.
U
Manufacturer's instructions provided for installation
120
sf
D Insulation installed to meet flame spread and smoke
ame t e
and calibration per 2-5319(e)6 ......................
12 Lighting Control Credits............ N
(Y/N)
density requirements of 2-5311(b)...................
t]
Proper installation of controls Including sensor location
Rated Heating Efficiency..
o"ny
3828 W. COMMONWEALTH AVE
U Urea formaldehyde foam insulation is installed
(units)) N "'MOND ENGINEERS _
certification of intial calibration and control of
Rated Heating Capacity....
378.0
per 2-5311(c) .......................................
FULLERTON CA.92633
luminaires only within daylit area per 2-5319(e)8....
18
Economizer Cooling?.......
U Retrofit insulation specified as per 2-5313 .........
0
Visible or audible malfunction storms per 2-5319(8).
(714)680-3044
D Air infittration is minimized by specification of tested
(Y/N)
Tee one
Lat. License No.
manufactured doors and windows, proper sealing and
requirements.
Entorcement
Date
(71 a e
caulking of joints and openings in exterior walls,
section 2-5317..........
Occupancy Sensing Devices (when
p
and weatherstripping as per
4 544-0636
1171
applicable)
letepnone
Cat. Lic
Lighting System Measures
U
Visible or sudible malfunction alarm per 2-5319(8)... ELECT.
Entorcement
D
limits on emissions per exceptions to 2-5319(e)......
0 Certified luminaires/ballasts per 2-5314(b) ......... E-2
U Independent control w/enclosed areas per 2-5319(a)..g s —
HVAC and Plumbing System Measures
U Manual switching readily accessibte per 2-5319(b)...
U Reduction of lighting toad to at least one half per
U
Piping insulated as required by 2-5312 ...............
NA
2-5319(c). Occupancy sensors or programmable timers
meeting CEC criteria may substitute.................E-5
U
Certified HVAC equipment per 2-5314(a)...............
El Seperste switching of daylit areas per 2-5319(d)....E-5
p
Certified ptuttbirtg equipment per 2-5314(a)...........
P-1
U Seperate switching of display and valance lighting
t]
Heating and cooling equipment efficiency
2-5314(b)
N-1
in retail and wholesale stores per 2-5319(h) ........ N/A _
per .........................................
U Automatic control of display lighting in retail
I)
Pilotless ignition of gas appliances per 2-5314(c) ...
P-1
and wholesale stores per 2-5319(h)..................11A
U
Automatic controls for off -hours per 2-5315(a)l......
M-6
U Tandem wiring of one -and three -lamp luminaires
E-5
U
Thermostat set point requirements per 2-5315(a) ......
M-6
per 2-5319(1) ..................... ..................
U
Sequential control of heating and cooling
per 2-5315(a)3.......................................M-1
Daylighting and Lumen Maintenance
U
Automatic exhaust fan dampers per 2-5316(b)..........
M-1
•
Controls (when applicable)
U
Thermostat controls for each zone per 2-5315(b) ......
P-2
U Uniformly illumination reduction to one-half
11
Ventilation provided per 2-5316 and 2-5343 ...........
M-1
per 2-5319(e)l......................................ELECT.
U
Ventilation and recirculation air quantity
information provided per 1403(b)3....................M-2
RECORD DRAWING
n Flicker free operation and no premature lamp
failure per 2-5319(e)2 ..............................
U
Heaters for domestic hot water and/or pools
per 2-5318 ...........................................P-1
THESE RECORD DRAWINGS (AS -BUILT DRAWINGS)
U Time delays to prevent urtdesirabte cycling
HAVE BEEN PREPARED BASED ON INFORMATION �
per 2-5319(e)3 ......................................
.
SUBMITTED, IN PART, BY OTHERS. WHILE THIS
U step switching devices with separation between
on/off settings per 2-5319(e)4 ......................
INFORMATION IS BELIEVED TO BE RELIABLE,
,
WOLFF/LANG/CHRISTOPHER ARCHITECTS, INC.,
HAS NOT VERIFIED THIS INFORMATION AND IS NOT
RESPONSIBLE FOR ITS ACCURACY OR ADEQUACY,
NOR FOR ANY ERRORS OR OMISSIONS WHICH MAY
HAVE BEEN INCORPORATED INTO THESE
DOCUMENTS AS A RESULT.
_
_
--
EEM Form Revised September 1988 Page of
Envelope Allowed
Proposed
NEW CONSTRUCTION
1 Average Roof/Ceiling Rt...
29.21
h-F-sf/Btu
2 Average Exterior Floor Rt.
9/90
h-F-sf/Btu
3 Average Opaque Wall Rt....
0.72
h-F-sf/Btu
4 Glazing Area in Watt......
675
sf
5 Average SC (Walt).........
0.95
watts/sf
6 Glazing Area in Roof......
120
sf
7 Average SC (Roof).........
ame t e
Rated Cooling Capacity....
Other requirements:
N CONSTRU T'bV
tento ry
9/94 2 9 A b
Plans a pets
clatea
r ate
JO OND /M. E.
tLe
JON (HAMMOND ENGINES S
ompany
2472 CHAMBERS RD.
ress
TUSTIN CA.92680
(8
(714)544-0636 11712
e Cat. Eicense No.
Enforcement Date
Lighting
Proposed
NEW CONSTRUCTION
NEW CONSTRIJ(I
8 Basis of Allowed LPD...... TAILORED
13
Extent of improvements
9/90
9/90
Allowed Proposed
9
Mans dated
Specs dated
9 LPD.......................1.10
watts/sf
ans
_9b
pc'ca
`�
10 Package lighting Reduction
watts/sf
Signature MACDONALD ENGINEER
EER
11 Adjusted LPD..............1.10 .98
watts/sf
ame t e
Rated Cooling Capacity....
12 Lighting Control Credits............ N
(Y/N)
M/P ENGINEERS INC.
_
Other requirements:
Rated Heating Efficiency..
o"ny
3828 W. COMMONWEALTH AVE
0
(units)) N "'MOND ENGINEERS _
ress
Rated Heating Capacity....
378.0
kBtu hr
FULLERTON CA.92633
18
Economizer Cooling?.......
t y a e tp
(Y/N)
Xddress
(714)680-3044
9340
(Y/N)
Tee one
Lat. License No.
Other
requirements.
Entorcement
Date
Mechanical Allowed
Proposed
CHECKED J,d,
NEW CONSTRIJ(I
SCALE. d I..� �
13
Unit Fan Power............
0
watts/cfm x mpr v n.s
90•
9
•
ans
_9b
pc'ca
`�
Rated Cooling Efficiency..
0
EER
t g ur
ll14
(units) OND M.E.
Fe—
15
Rated Cooling Capacity....
279.0
kBtu hr
(units) a t e
16
Rated Heating Efficiency..
0
(units)) N "'MOND ENGINEERS _
17
Rated Heating Capacity....
378.0
kBtu hr
(units )244 72 7 2 CHAMBERS RD.
18
Economizer Cooling?.......
_
(Y/N)
Xddress
19
Simultaneous heat/coot?...
(Y/N)
TUSTIN CA. 92680
Other
requirements.
(71 a e
4 544-0636
1171
letepnone
Cat. Lic
Entorcement
Date
EEM Form Revised September 1988
CITY OF
FONTANA
FIRE AND
I POLICE CONTACT
STATION
II TY
DEFONTANA VELOPMENT DEP R^TMENT
*.'..-
CENTRAL- VALLEY
FIRE. PROTECTION .DISTRICT
• FONTANA,
POLICE DEPARTMENT
CONSULTANT
JON HAMMOND ENGINEERS
Engineering Consultant
2472 Chamb*rs Road, Suite 120
Tustin, CA 92680
(714) 544-0626
Np DATE 1BY REMARKS
DRAWN
,�-f
CHECKED J,d,
DATE `�j/�O
SCALE. d I..� �
.IOB N0.
_1
IMmIA1
Dw&. No.. 23 s6