Loading...
HomeMy WebLinkAbout2049-4VERT: 1 in = 4 f t HORZ : l in = 40 ft CURVE DATA: CURVE NUMBER DELTA a-111°2443" (D4-- 150 17'07 5�-- 150 17'07 �- 900 00' 23" �7 -- 890 5936" 10 680 35117" q3)-- 150 17'07" CALL UNDER AROUND SERViEf ALERT 48 HOURS BEFORE YOU DIG 1-800-422-4133 TANGNET Z / LENGTH Q , 51.32' – Q 24.42' m 29.25' _ 30.00 30.00' 23.87' E?C 15T. 26.84' CMP��j_ r EX15T. 2'XZ' (ARATI✓ IN LET- 2 5M CITYOF FONTANA �. WAWIW-j No. &40 FOR PETAI l s ON E?C 15T'I Nii e5TORIM PP41 N N ill 1q" 40 �v �o CONSTRUCTION NOTES 1 CONSTRUCT (31'MIN) A.C. OVER (411MIN1) CLASS 2 AGGREGATE BASE. [SEE GENERAL NOTE NO. 63 2O— CONSTRUCT 6" CURB AND GUTTER PER CITY OF FONTANA STD. NO. 101. (3)—CONSTRUCT 8" CURB AND GUTTER PER CITY OF FONTANA STD. NO. 101. 40-- CONSTRUCT CROSS GUTTER PER CITY OF FONTANA STD. NO. 105. 5 CONSTRUCT HANDICAP RAMP PER CITY OF FONTANA STD. NO. 104A. 60-- CONSTRUCT 4" THICK P.C.C. SIDEWALK PER CITY OF FONTANA STD. NO. 105A. 7�-- CONSTRUCT P.C.C. DRIVEWAY APPROACH PER CITY OF FONTANA STD. NO. 102 (WIDTH = 16' ) . CONSTRUCT 1" MIN A.C. OVERLAY. 9 SAWCUT EDGE OF PAVEMENT WHERE NEW PAVEMENT JOINS TO A SMOOTH STRAGHT LINE. CONSTRUCT MATCH -UP PAVING AS SHOWN ON PLAN AND OVERLAY PAVING AS DIRECTED IN THE FIELD TO PRODUCE*A SMOOTH SECTION. 10 REMOVE EXISTING CURB AND GUTTER AND PAVEMENT. 11 CONSTRUCT CATCH BASIN PER CITY OF FONTANA STD. NO. 121 (W = 28' AND D = 6') 12 INSTALL 36" R.C.P. D -LOAD = 1500 t3 INSTALL 5,800 LUMEN (H.P.S.U.I ORNAMENTAL POLE STREET LIGHT. S ­INSTALL 22,000 LUMEN [H.P.S.U.) ORNAMENTAL POLE STREET LIGHT. 15 RELOCATE. EX I ST I NG ITEMS A5 SHOWN ON PLANS. 17 REMOVE ITEi� A6 S14OWN ON PLANS. lid APJU5T SEWER MANHOLE TO G R'"r PF -R- CITY OF FONTANA S?D• No. Imo. 25 ApJUST EX 15T I N(� WATER VAI-Vr-- TO G-ARAAE . �x t5 i-7AVN6� N PRIVATE ENGINEER'S NOTE TO CONTRACTORS: THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES SHDWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTIN19 UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY. AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS, OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE CITY, THE OWNERS, AND THE•.ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE. OWNER OR THE ENGINEER. RIVERSIDE BLUEPRINT - RIVERSIDE, CALIF. A BENCHMARK NO. 396 PK NAIL IN P.P. #1170851E NW COR. ARROW HIGHWAY AND OLEANDER AVENUE. ELEVATION: 1260.84 DATE: 9/67 BENCHMARK NO. 399 PK NAIL IN P.P. #1170859E NE COR. ARROW HIGHWAY AND CITRUS AVENUE. ELEVATION: 1254.82 DATE: 9/67 REVISIONS: N0. DESCRIPTION I ENG . I DATE I APPROVED I DATE r C> g R.C.E. 2a® IV. e ? dl r DATE: 6111 ul A V��IUE Sierra Engineering CIVIL ENGINEERS - LAND SURVEYORS - LAND PLANNERS OLEANDER AVENUE sEff �£� No. z �F== F` SCALE: 0 t"= 40 .' " RS- BU 1 LT CITY OF FONTANA. CALIFORNIA PARI Tf'. IJf1RKq f1P7PARTMFNT ARC RADIUS LENGTH 35.00' 58.06' 182.00' 48.55' 218.00' 58.16' 30.00' 47.13' 30.00' 47.12' 35.00' 41.90' 200.00' 53.36' CALL UNDER AROUND SERViEf ALERT 48 HOURS BEFORE YOU DIG 1-800-422-4133 TANGNET Z / LENGTH Q , 51.32' – Q 24.42' m 29.25' _ 30.00 30.00' 23.87' E?C 15T. 26.84' CMP��j_ r EX15T. 2'XZ' (ARATI✓ IN LET- 2 5M CITYOF FONTANA �. WAWIW-j No. &40 FOR PETAI l s ON E?C 15T'I Nii e5TORIM PP41 N N ill 1q" 40 �v �o CONSTRUCTION NOTES 1 CONSTRUCT (31'MIN) A.C. OVER (411MIN1) CLASS 2 AGGREGATE BASE. [SEE GENERAL NOTE NO. 63 2O— CONSTRUCT 6" CURB AND GUTTER PER CITY OF FONTANA STD. NO. 101. (3)—CONSTRUCT 8" CURB AND GUTTER PER CITY OF FONTANA STD. NO. 101. 40-- CONSTRUCT CROSS GUTTER PER CITY OF FONTANA STD. NO. 105. 5 CONSTRUCT HANDICAP RAMP PER CITY OF FONTANA STD. NO. 104A. 60-- CONSTRUCT 4" THICK P.C.C. SIDEWALK PER CITY OF FONTANA STD. NO. 105A. 7�-- CONSTRUCT P.C.C. DRIVEWAY APPROACH PER CITY OF FONTANA STD. NO. 102 (WIDTH = 16' ) . CONSTRUCT 1" MIN A.C. OVERLAY. 9 SAWCUT EDGE OF PAVEMENT WHERE NEW PAVEMENT JOINS TO A SMOOTH STRAGHT LINE. CONSTRUCT MATCH -UP PAVING AS SHOWN ON PLAN AND OVERLAY PAVING AS DIRECTED IN THE FIELD TO PRODUCE*A SMOOTH SECTION. 10 REMOVE EXISTING CURB AND GUTTER AND PAVEMENT. 11 CONSTRUCT CATCH BASIN PER CITY OF FONTANA STD. NO. 121 (W = 28' AND D = 6') 12 INSTALL 36" R.C.P. D -LOAD = 1500 t3 INSTALL 5,800 LUMEN (H.P.S.U.I ORNAMENTAL POLE STREET LIGHT. S ­INSTALL 22,000 LUMEN [H.P.S.U.) ORNAMENTAL POLE STREET LIGHT. 15 RELOCATE. EX I ST I NG ITEMS A5 SHOWN ON PLANS. 17 REMOVE ITEi� A6 S14OWN ON PLANS. lid APJU5T SEWER MANHOLE TO G R'"r PF -R- CITY OF FONTANA S?D• No. Imo. 25 ApJUST EX 15T I N(� WATER VAI-Vr-- TO G-ARAAE . �x t5 i-7AVN6� N PRIVATE ENGINEER'S NOTE TO CONTRACTORS: THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES SHDWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTIN19 UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY. AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS, OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE CITY, THE OWNERS, AND THE•.ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE. OWNER OR THE ENGINEER. RIVERSIDE BLUEPRINT - RIVERSIDE, CALIF. A BENCHMARK NO. 396 PK NAIL IN P.P. #1170851E NW COR. ARROW HIGHWAY AND OLEANDER AVENUE. ELEVATION: 1260.84 DATE: 9/67 BENCHMARK NO. 399 PK NAIL IN P.P. #1170859E NE COR. ARROW HIGHWAY AND CITRUS AVENUE. ELEVATION: 1254.82 DATE: 9/67 REVISIONS: N0. DESCRIPTION I ENG . I DATE I APPROVED I DATE r C> g R.C.E. 2a® IV. e ? dl r DATE: 6111 ul A V��IUE Sierra Engineering CIVIL ENGINEERS - LAND SURVEYORS - LAND PLANNERS OLEANDER AVENUE sEff �£� No. z �F== F` SCALE: 0 t"= 40 .' " RS- BU 1 LT CITY OF FONTANA. CALIFORNIA PARI Tf'. IJf1RKq f1P7PARTMFNT 90-069 C7141 799-8080 25864 BUSINESS CENTER DRIVE. SUITE 'F' DRAWN BY STREET IMPROVEMENT PLANS SCALE 1- "=40 REDLANDS CA---- 92374 TMG TRACT N O. 14747 DESIGNED BY DATE 5 SEVILLE AVENUE .& CITRUS AVENUE CHECKED BY gi DRW, 4 � S� APPROVED ACTING ._CITY _ENGINEER R.C.E. 25131 2-044 4 ar R.C.E. - 33820 EXP 6/30/94 • 90-069