Loading...
HomeMy WebLinkAbout1451C-4INSTALL FPWf, AND COVER INOTALI, V0 6ALY. — STLrr5• STATE STD P. 7Z Z" CLX. (TYP.) #s SaM5 AT IZ" O.c :#4 13AIZ5 AT IZ" D.G. H 12" MIN i ',T SAM HOOPS 41ZOOND PIPE DrA L Z) !'4 MAV -05 AT Z" O.C. "4 BARO AT Co" D.G. GUZ21 OPENING DETAIL, LOCAL DEPRESSION 3b9-6 AT 121r D.C. 04 DA Iz 6 AT IZ" D. C. & DD #S SAX x.1010 P4:�P X -<--x A ROUND PIPE l TOTAL C) 45".0 VCP I �FLOWLIUE ELEVATION I . FLOW SHOWN ON PLANS I 1 4 3AIE15 AT IZ" O.C. VI #5 LSA►R5 AT IZ" O.C. SECTION A-4\ /V. T. S. I V �F' Q •I 10, r SECT ION B - 6 N. T. 5. 9EF2I- E INCE S: CATCH BASIN STORM DRAIN CLEANOUT NOT T4 SCALA .NOTES: I. DEEB GATLI4 6bo47IN yLfALL GE GONSTRUGTED OF CL,4h� "A" G0IUG9ETE 3DDD P. 415*. 1. Z. GLEAeANGE FROM I.D. OF PIPE TD GC.EANOUT WALL SNALC. C3E 4" MIN. 3. ,CALL 7-EINFDRGEMENT CiAds SI-IALL 6E INTERMEDIATE Ca RADE AND 9SPI444LL 6E DEFORMED AC- G0RDINC-i TO AZTM A 305- 6Co7 4. r-ot4 Npo►Tio0fao� WFogmt%-TioJ vET�� s►-t50ST NO -C:7 *1,4 FRAME AND PER STD. Z #4 aA;z5 AT Z"O.C, A IMPROVEMEN Ty L6TATION PER PLAN 44 SAR5 AT !o" C ( TYPICAL) LOS AN&EL ES COUNTY FLOOD COIUTROL J" S17AN1>L\I5zD PLANS NO. Z -- DI72 2. •54N 5ER -HAV-DIK10 COUNTY FLOOD CON TMOL "DEt3EMPLY STOIzM DRAIN" C ON T V-A LST N D. 6o 7 D Co FILE ND. Z-805-1 157HEF—T 5 OF 0F IU5 IDN AN D ►TION PLANS ►L I.'ESSION lD1U5 ON AND !6T I O N PLAN 7 sf e✓PS Pe -r- S t� y`e o• ` OPTIONAL HOOK -•�-- Z C% _ const.-Jf a_ yy ' d • _ §TEEL A'N2.E A SU PPOT DOLT DETAIL, / / , I/4 OPTIONAL ANCHOR �4d '#� 3 0/2"x6" STUDS) IN SECTION A -A J-� 1050 N �V. T. 5. *iISIGALV. STEEL " 1 2 0 STEEL A1�CHOR AT 3'-O�r O.C. MA ANGLE / ( X 1 LENGTH SHALL BE OPENING WIDTH PLUS 12 INCHES STEEL ANGLE ANCHOR NOTES= 1. A PLAIN ROUND GALVANIZED STEEL PROTECTION BAR 3/4" IN DIA. SHALL BE INSTALLED AND EMBEDED 6"AT EACH END. 2. ALL EXPOSED METAL PARTS SHALL BE GALVANIZED. (EXCEPT FRAME AND COVER) 3. SUPPORT BOLTS SHALL BE UNIFORMLY SPACED BUT NOT TO EXCEED 71ON CENTER. 4. STEEL ANGLE SHALL BE BENT TO MATCH CURB ALIGNMENT. CATCH BASIN OPENING-, � � Nor To s�.aLr SECTION B - B N T S. Alhen Duf/p,f ,v•P� extends /IV 7<o 5 add 3 `4 A5nrs R s �� sGror,�/n o add 641ire McS11 Trate si ron B I'• B Ex�arrs /orrI •. ,� Joirt7' t ��d Z- 4 Suers cover per' S.S. Ca 5fd • 204 A. X PLAN CATCH BASIN DETAIL NOT t0 SCALE Pipe I � I I I I I I I cv rr •--r- r PLAN BENCH MAR K NO, S. B. CO. Brass Disk 13-1 4.5 miles west along S. P. R. R. from Sierra Avenue Overcrossing & 0.5 miles east of Etiwanda Overcrossing, Headwall for Bay of 5 large CMP over Etiwanda Wash. Elevation 993.449 ft. Equation: Add 0.26 ft. to plan elevation to obtain benchmark datum. t 112" 4" 0 galvanized steel pi (total 2) in �- Add -W6 bars x k(-Tfic3 K (total 2) Precast concrete end .0 �? block to be placed flush a: with end of pipe as tV1 t directed by the Engineer. :R o O 12" o. C. ELEVATION CLOSURE — TYPE "A" /V0 7' TO .5CALE 00 N— N� r� u� No. 27674 zo Exp. Nit � ROACH NO. 51IT50 fcAQ! - LIMI`C5. lc�5--t tc7 4 @ Co `C�o�GI via ys 1/4"R err CITY OF FON TA N A SLOPE 1/4":I' -5 /0 e /4 mer- yrt —� ^� • �. 2z. Pr'0 h! Cii on 43ar See cat -b SCALE NOT TO -544LE DRAWN BY J P.GJ . C'Oep ehin9 r2zf$ii TtiI's SA-f. - J. BABBITT R.C.E. 27674 DATE 3-31-90 If CHECKED BY ' G' APPROVED 8YEXP. CITY ENGINEER R.C.E. 18932 DWG. N0. C .3 11z co W V4 r 1-0r ,• • a U I�J 8 `I 4P4 12�` / PROTECTION BAR 3/4" 0 GALVANIZED q n I rr I/2" ROUND STIRRUP t •, r Iy�e'f �nql�/- 1' • • GUTTER • FLOW LINE ' ~ ' `' "x 1'4 SUPPORT BOLT (ALHAMBRA FOUNDRY A-1572 OR EQUAL) outlet Fijpe, (May be in do h/all) •. - : •' : ' .� . .. • '• • - 2 sf e✓PS Pe -r- S t� y`e o• ` OPTIONAL HOOK -•�-- Z C% _ const.-Jf a_ yy ' d • _ §TEEL A'N2.E A SU PPOT DOLT DETAIL, / / , I/4 OPTIONAL ANCHOR �4d '#� 3 0/2"x6" STUDS) IN SECTION A -A J-� 1050 N �V. T. 5. *iISIGALV. STEEL " 1 2 0 STEEL A1�CHOR AT 3'-O�r O.C. MA ANGLE / ( X 1 LENGTH SHALL BE OPENING WIDTH PLUS 12 INCHES STEEL ANGLE ANCHOR NOTES= 1. A PLAIN ROUND GALVANIZED STEEL PROTECTION BAR 3/4" IN DIA. SHALL BE INSTALLED AND EMBEDED 6"AT EACH END. 2. ALL EXPOSED METAL PARTS SHALL BE GALVANIZED. (EXCEPT FRAME AND COVER) 3. SUPPORT BOLTS SHALL BE UNIFORMLY SPACED BUT NOT TO EXCEED 71ON CENTER. 4. STEEL ANGLE SHALL BE BENT TO MATCH CURB ALIGNMENT. CATCH BASIN OPENING-, � � Nor To s�.aLr SECTION B - B N T S. Alhen Duf/p,f ,v•P� extends /IV 7<o 5 add 3 `4 A5nrs R s �� sGror,�/n o add 641ire McS11 Trate si ron B I'• B Ex�arrs /orrI •. ,� Joirt7' t ��d Z- 4 Suers cover per' S.S. Ca 5fd • 204 A. X PLAN CATCH BASIN DETAIL NOT t0 SCALE Pipe I � I I I I I I I cv rr •--r- r PLAN BENCH MAR K NO, S. B. CO. Brass Disk 13-1 4.5 miles west along S. P. R. R. from Sierra Avenue Overcrossing & 0.5 miles east of Etiwanda Overcrossing, Headwall for Bay of 5 large CMP over Etiwanda Wash. Elevation 993.449 ft. Equation: Add 0.26 ft. to plan elevation to obtain benchmark datum. t 112" 4" 0 galvanized steel pi (total 2) in �- Add -W6 bars x k(-Tfic3 K (total 2) Precast concrete end .0 �? block to be placed flush a: with end of pipe as tV1 t directed by the Engineer. :R o O 12" o. C. ELEVATION CLOSURE — TYPE "A" /V0 7' TO .5CALE 00 N— N� r� u� No. 27674 zo Exp. Nit � ROACH NO. 51IT50 fcAQ! - LIMI`C5. lc�5--t tc7 DATE REVISION CK.B krue er engineering g� g & associates civil engineering • land surveying 568 north mountain view, suite 230 san Bernardino, california 92401 884-2159 CITY OF FON TA N A PUBLIC WORKS DEPARTMENT DESIGN BY �'t/8 FCZ MULBERRY AV�NU� 57-40AM PAA /N )94A/V AE7A /L .Sle:"���T SCALE NOT TO -544LE DRAWN BY J P.GJ . DAT $ - J. BABBITT R.C.E. 27674 DATE 3-31-90 CHECKED BY ' G' APPROVED 8YEXP. CITY ENGINEER R.C.E. 18932 DWG. N0. C 1779�FRED