HomeMy WebLinkAbout1451C-2Sol
R
WI
R
SLOVER AVENUE
/.SOT TO SC.oGE
MULBERRY AVENUE
NOT To SGtE
No. 27674
Exp. _3-(�90
1K- CAl\
►RT H
/W
L
ST
'W
1
SPECIAL NOTES
8" Minimum clearance between top of 24" RCP lateral and bottom
of proposed/ existing waterline shall be maintained.
8" Minimum clearance between top or bottom of 24" RCP lateral
and bottom or top of proposed sewerline shall be maintained.
Depth of sewer line within Santa Ana Avenue
increases in an easterly direction.
Contractor to pothole lateral crossing locations of the existing
16"/10"/4" gas lines prior to construction to verify depth of
said gas lines so as to insure that lateral crossings can be
accomplished.
WEST
R/W
EAST
R/W
SOUTH
R/W
COMMERCE. -
WAY
BUSINESS DRIVE
NOT 7b SCALE
NORTH
R/W
SANTA ANA AVENUE
/VOT TO -15CAL C ROAD NO. 5727.50
LIMITS 10A5 -1L0
®1
2/i ,;