Loading...
HomeMy WebLinkAbout1451B-4z INSTALL FRAME AND COVER IN STALL VO CiALY, — ST@1P5• STATE 5TD P. 7Z Z" CLR. (TY P) "5• BAIZ S AT I Z" O.C.— :#4 .G :#4 13,0ZI42 AT X" o.C. ADD Al SAM HOOPS X><=><r0►IZ00ND PIPE (TOTAL Z) 12" MIN \ I SECTION A -A /v T. 5, #4 CQAeg AT Z" O.C. *'4 BARO AT Co" D.C. GU¢D OPENING DETAIL _,-LOCAL DEPRESSION 13,a R-5 AT 121, D.C. #4 DAV-6 AT I Z' � o. C. 1 I Q DD 04* 6A&R 1-1001705 y��C�R• X -<=><AROUND PIPE T YP.) (TIL 9 ) I I 45"0 xCF I 1 i �FLOWLINE ELEVATION FLOW SHOWN ON PLANS 4AW-5 AT IZ" O. C. VI #5 SAR5 AT I Z ", O.C. lay a' - o'� lo'• SECTION 6 - B N. T. 5. 9EFP K E NCE S: CATCH BASIN STORM DRAIN CLEANOUT NOr � 5CA1_E NOT E'er 11 DEEP CATLI Mboev 1 N �WAL L. aE CON STRU CTED OP C LA 4�74-5 "A" C Olv C SET E -PC = 3000 P. 41�7.1. Z CLE/_\V-ANLE FIXOM I.D. OF PIPE TD CLEANOUT WALL 4" M)N. 3. k\L L 7-5)NF0R6EJ 15k)T SAV -5 oSPUALL 136 INTE7-MENATE &W -.ADE -Fl, = on, ODD 1P., S I. ZXND SI4,LZLL 136 DEPOP-MED AC- C OZ - D I N C-1 TO ZN evT M A 5&5- SF& 7 �• rorz A4:;PITI0t4AL W -r100 *Eg. P1'At L. XA 4�-T talo. C�; P N. FRAME AND PER STD. Z #4 I3AR 5 AT Z" O.C. A IMPROVEMEN Tti L6TA'nON PER PLAID 44 SAF -6 AT &"' C (TYPICAL) LDS AN&EL ES COUNTY FLOOD CO1UTROL J' STAN C>A II D FLANS NO. Z -- DWI 2 2. •54kN 13EANrAIZDINO COUNTY FLOOD CON T12.OL "DC5E1zP-Y STO12M DPAIN" CONT V-A LST N0. 6o70& FILE ND. Z-80-5-1 SPEP—T 6 OF - 'IUS IDN Am pTION PC.AN6 ►L 'ESSION ZIUS DN AND 4TION PLAN 7 In 5iWl 3� �5� s{eel- sf eps per S' f'�fe Sfd -;r-4 @ Co,(3o4h via y6 1 .5/ope 1/4g /4rper FA Profeciion ear See Curb a Zr^ 0, jn def 4?n41(/or- J OuNet Pij7e (May be in any u/all) • ' I-•�— 2 r( CIr ; Const, J71•:. ; �yP I �, • • SECTION A -A ' �'roc�`rai wipe N � Rr Top o�`Cur6 v� v� Ou�lef ppe �or Ih/e f� ''• _v o ' 1 ; 14 ��--- 4: SECTION 6 - 6 N T S. 1/4"R SLOPE 1/4„; It. U t N OD — U / V �J PROTECTION BAR 3/4" 0 GALVANIZED / I/2" ROUND STIRRUP GUTTER. FLOW LINE- • i . .•- •x 1'4 SUPPORT BOLT ;.. , (ALHAMBRA FOUNDRY A-1572 OR EQUAL) 3312 OPTIONAL HOOK . I- 2TEEL AN23E I $9EP 0T DOLT DETAIL 6"MIN.—•� 1/4" I + OPTIONAL ANCHOR L 0/2"x6" STUDS) u 1050 a �S6MGALV. STEEL 3►/2" ANGLE I/2" 0 STEEL ANCHOR AT 3�-0" O.C.(MAX.) LENGTH SHALL BE OPENING WIDTH PLUS 12 INCHES STEEL ANGLE ANCHOR y 4 NOTES. S-4 I. A PLAIN ROUND GALVANIZED STEEL PROTECTION BAR 3/4" IN DIA, SHALL BE INSTALLED AND EMBEOED 6"AT EACH END. �' 2. ALL EXPOSED METAL PARTS SHALL BE GALVANIZED. (EXCEPT FRAME AND COVER) 3. SUPPORT BOLTS SHALL BE UNIFORMLY SPACED BUT NOT TO EXCEED 7"ON CEN?ER. 4. STEEL ANGLE SHALL BE SENT TO MATCH CURB ALIGNMENT. 6i/he`r Ouf/I P•P' ttase-xfei101>`o ' 5 �� �\ ower apron a 1301 rs �N` �\ 5>11014.4? 0r add Aire Me s11 r N\ I 6 Exp 7n!5 torr f I jvi � �l�d Z- �4 Suers •d- , Cover per S• 8. Co S -f -al. 204 A J X PLAN � CATCH BASIN DETAIL �or 7o SCALE 4" 0 galvanized steel piU 06 (tots! 2) Add -46 bars z T( g2 Pipe (total 2) �a Precast concrete end I block to be placed flush I with end of pipe as t directed by the Engines. o I I � -- ---- -- bars T-+---* --"*— ,--► @ I2" 0. C'. EM ELEVATION El EE CLOSQRE - TYPE A. /VO 7~ TO _5 C A L E CATCH BASIN OPENING- IV07- Jo S&AtE NO. 27674 Exp, 3, -