HomeMy WebLinkAbout1449B-2NORTH SOUTH
R/W 109 PHASE IA CONSTRUCTION LIMITS ly
w
loe 100' -
50' 50'
14' 1.5 10.5 24 24' 10.5 1.5 14'
EXISTING A.C. VARIES 10' to ' 13' EXISTING A.C. VARIES I I I to 14' 10
10,0 /o 0
/o
i I EXISTING VARIES 0.08 TO 2.95
-WINSTALL 0.10' MIN. A.C. 2 EXISTING VARIES 0.15 % TO 4.30 %
OVERLAY
3 I 233 PROPOSED 2%
4 SLOPE 1/4" -
4 — — 4 PROPOSED 4 O/o
10 SAW CUT TO FORM SMOOTH J OI N
, i I REMOVE EXISTING AC. PAVEMENT ,a „
3 INSTALL 8 PC.C. CURB AND 2 INSTALL ____ A.C. OVER
GUTTER PER STD. No. 101 �? COMPACTED NATIVE SOIL
(FUTURE) EXISTING CROSS-SECTION (TYP)
NORTH
R/W
STA. 83 + 00 TO STA -88+472
S TA. 102 +17 8 TO S TA. 110 + 72.6
STA. 116+72.5 TO STA -130+ 54.76
PHASE IA CONSTRUCTION LIMITS
INSTALL � �2 A.C. OVER
12 "COMPACTED NATIVE
INSTALL 8" PC.C. CURB AND SOIL. (FUTURE)
GUTTER PER STD. No. 101
(FUTURE)
STA. 88 + 47.2 TO STA. 102 +- 17.8
STA. 110 + 72.6 TO STA.116 + 90.5
No.27674
Exp 3-3/-cjo
CIV 11.
F OF CA1.\F
SOUTH
V/w
(LHT _
- n
EXISTING CURB & CUTTER
SLOVER AVENUE PHASE I A
I EXISTING VARIES 0.64 % TO 2.64 %
2 EXISTING VARIES 0.68 % TO 2.47 %
3 PROPOSED VARIES 2.0% TO 3.51 %
4 PROPOSED VARIES 1.97% T04.0%
TYPICAL CROSS. SECTION