I. All work shall be done in accordance with these plans. and' the
City of Fontana Public Works Department Standard Specifications
dated 1975, and any revision thereafter.
2. Construction permits shall be obtained from the City of Fontana
Public Works Department prior to the start of any work within
city limits•
3. Stationing refers to the centerlines of street except where
otherwise noted.
4. Curve data refers to the face of the curb.
5. All exposed concrete shall conform in grade, color and finish to
all adjoining curbs and sidewalks.
6. Actual thickness of A. C. pavement and/or base course e- atbeyiaa
for structural street sec all be submittede to the City of
geotechnical engineering report and
Fontana for approval upon completion of rough grading.
7. Pavement structural sections shown are minimvand sect tsts
to
revision and approval of the City as requiredy soils
taken after completion of rough grading.
8. Care should be taken to prevent grades, ditches and swales from
undermining street improvements. Upon inspection of the site,
the City Engineer may required temporary gunite swales, entering
or leaving improvements.
9. All underground work shall be completed prior to paving of the
streets.
10, Adequate stakes shall be set by the Engineer to enable the
contractor to construct the work to the plan grades.
11. All pipes or substructures of any -kind and all one or tructuower
poles, water meters, valves, hydrants, irrigation
etc., shown or not shown on this plan and located within
rareas
to �'
be improved and interfering with constructions
shall
lit to notify
by others. It shall be the contracto�onstrucresponsibility
begins. '
all of the agencies concerned before
12
All manhole and cleanout frames and covers shall be conestrai sed
6" below finished grade by sewer contractor and shall
to grade by paving contractor after completion of pn g. ,
■o
13. All valve cans and covers shall be constructed 6" below finished
grade by water contractor and shall be raised to grade by paving
contractor after completion of paving$
14. Refer to City of Fontana, underground utility location Standard
Detail 129.
15. The contractor(s) shall coordinate construction with all
utilities and other improvements including, but not limited to,
gas, telephone, electrical, lighting, television water reclae
cable,
landscaping, landscaping irrigation, domestic
water, sewer, storm drainage, flood control systems, etc.
16. As built drawings shall be provided by the engineer to the City
of Fontana.
17. Type, location and width of driveway approach conform with the
rons will be
determined at the time of construction and shat
City of Fontana standard details.
18. Contractor is instructed to refer to these plans be a conflict dthe
shall
specifications, and where there is or may
mmediately report said conflict or possible conflict to the
owner's representative.
19. Sterilant required under all A.C. pavement.
20. No concrete shall be placed until forms and reinforcing steel
have been placed, inspected and approved.
21. All utility companies shall be given 48 hours notice prior to
work around their facilities.
22. All backfill compaction to be certified by soils engineer.
23. All materials and methods to be subject to the approval of the
City Engineer.
24. Backfill materials shall be verified by contractor and-- ;)proved
by Public Works Inspector prior to the placing of any permanent
pavement.
25. Contractor to install pavement markings and striping as required
by the City Engineer.
26. Contractor shall not operate any main line water valve,
6A'. Upon caVietion of construction, contractor shall restore all
1� signing, striping, barricades, and other traffic control
devices to their original condition, or to the satisfaction
of City Engineer.
27. If existing utilities or any other facilities conflict with the
proposed improvements, work shall stop and the Engineer notified
immediately.
28. it shall be the responsibility of the contractor ucttd notifyand he .
Engineer after the base ea that theconstructed
Engineer may install
the paving has been installedso
the street centerline monuments as required by the City Code of
the City of Fontana.
UTILITY NOTIFICATIONS
WATERs SAN GABRIEL VALLEY WATER COMPA14Y
11142 GARVEY AVENUE
EL MONTE, CA 91734
13) 448-6183
SEWERS � CITY OF SIERRA AVE
8NA
353 NUE
FONTANA, CA 92335
(714) 350-7640
POWER: SOUTHERN CALIFORNIA EDISON COMPANY
P. 0. BOX 788
300 N. PEPPER STREET
RIALTO, CA 92376
ATTN: DAVID JONES
(714) 820-5191
GAS: SOUTHERN CALIFORNIA GAS COMPANY
16231 VALLEY BLVD.
FONTANA, CA 92335
MR. LOU WESTFALL
(714) 889-9711
SOUTHERN CALIFORNIA GAS COMPANY
TRANSMISSION DIVISION
2191 E, BIRCH STREET
BREA, CA 92621
(714) 529-2889
TELEPHONE% GENERAL TELEPHONE
9000 HEILMANAYCA 91730
RANCHO CUCAMON ,
(714) 945-3562 t
PACIFIC BELL
3939 E. CORONADO STREET
ANAHEIM, CA 92807
(714) 999-5639
1*
0 �cjfESSIOI
U
No. 28501 ;;Q
Cl Y 1 �_
Of A0
18
SEE Dr. No. ! loZ shl yoFB