Loading...
HomeMy WebLinkAbout2316-1STREET IMPROVEMENT PLANS GENERAL NOTES I. All work shall be done in accordance with these plans. and' the City of Fontana Public Works Department Standard Specifications dated 1975, and any revision thereafter. 2. Construction permits shall be obtained from the City of Fontana Public Works Department prior to the start of any work within city limits• 3. Stationing refers to the centerlines of street except where otherwise noted. 4. Curve data refers to the face of the curb. 5. All exposed concrete shall conform in grade, color and finish to all adjoining curbs and sidewalks. 6. Actual thickness of A. C. pavement and/or base course e- atbeyiaa for structural street sec all be submittede to the City of geotechnical engineering report and Fontana for approval upon completion of rough grading. 7. Pavement structural sections shown are minimvand sect tsts to revision and approval of the City as requiredy soils taken after completion of rough grading. 8. Care should be taken to prevent grades, ditches and swales from undermining street improvements. Upon inspection of the site, the City Engineer may required temporary gunite swales, entering or leaving improvements. 9. All underground work shall be completed prior to paving of the streets. 10, Adequate stakes shall be set by the Engineer to enable the contractor to construct the work to the plan grades. 11. All pipes or substructures of any -kind and all one or tructuower poles, water meters, valves, hydrants, irrigation etc., shown or not shown on this plan and located within rareas to �' be improved and interfering with constructions shall lit to notify by others. It shall be the contracto�onstrucresponsibility begins. ' all of the agencies concerned before 12 All manhole and cleanout frames and covers shall be conestrai sed 6" below finished grade by sewer contractor and shall to grade by paving contractor after completion of pn g. , ■o 13. All valve cans and covers shall be constructed 6" below finished grade by water contractor and shall be raised to grade by paving contractor after completion of paving$ 14. Refer to City of Fontana, underground utility location Standard Detail 129. 15. The contractor(s) shall coordinate construction with all utilities and other improvements including, but not limited to, gas, telephone, electrical, lighting, television water reclae cable, landscaping, landscaping irrigation, domestic water, sewer, storm drainage, flood control systems, etc. 16. As built drawings shall be provided by the engineer to the City of Fontana. 17. Type, location and width of driveway approach conform with the rons will be determined at the time of construction and shat City of Fontana standard details. 18. Contractor is instructed to refer to these plans be a conflict dthe shall specifications, and where there is or may mmediately report said conflict or possible conflict to the owner's representative. 19. Sterilant required under all A.C. pavement. 20. No concrete shall be placed until forms and reinforcing steel have been placed, inspected and approved. 21. All utility companies shall be given 48 hours notice prior to work around their facilities. 22. All backfill compaction to be certified by soils engineer. 23. All materials and methods to be subject to the approval of the City Engineer. 24. Backfill materials shall be verified by contractor and-- ;)proved by Public Works Inspector prior to the placing of any permanent pavement. 25. Contractor to install pavement markings and striping as required by the City Engineer. 26. Contractor shall not operate any main line water valve, 6A'. Upon caVietion of construction, contractor shall restore all 1� signing, striping, barricades, and other traffic control devices to their original condition, or to the satisfaction of City Engineer. 27. If existing utilities or any other facilities conflict with the proposed improvements, work shall stop and the Engineer notified immediately. 28. it shall be the responsibility of the contractor ucttd notifyand he . Engineer after the base ea that theconstructed Engineer may install the paving has been installedso the street centerline monuments as required by the City Code of the City of Fontana. UTILITY NOTIFICATIONS WATERs SAN GABRIEL VALLEY WATER COMPA14Y 11142 GARVEY AVENUE EL MONTE, CA 91734 13) 448-6183 SEWERS � CITY OF SIERRA AVE 8NA 353 NUE FONTANA, CA 92335 (714) 350-7640 POWER: SOUTHERN CALIFORNIA EDISON COMPANY P. 0. BOX 788 300 N. PEPPER STREET RIALTO, CA 92376 ATTN: DAVID JONES (714) 820-5191 GAS: SOUTHERN CALIFORNIA GAS COMPANY 16231 VALLEY BLVD. FONTANA, CA 92335 MR. LOU WESTFALL (714) 889-9711 SOUTHERN CALIFORNIA GAS COMPANY TRANSMISSION DIVISION 2191 E, BIRCH STREET BREA, CA 92621 (714) 529-2889 TELEPHONE% GENERAL TELEPHONE 9000 HEILMANAYCA 91730 RANCHO CUCAMON , (714) 945-3562 t PACIFIC BELL 3939 E. CORONADO STREET ANAHEIM, CA 92807 (714) 999-5639 1* 0 �cjfESSIOI U No. 28501 ;;Q Cl Y 1 �_ Of A0 18 SEE Dr. No. ! loZ shl yoFB