Loading...
HomeMy WebLinkAbout2305-1410' MAXIMUM FROM TAP TO DISCONNECT SWITCH SINGLE LINE DIAGRAM SHOWN IS ALL EXISTING UNLESS NOTED OTHERWISE NOTE: O CONTRACTOR TO FIND THE SHORTEST POSSIBLE ROUTING OF THE NEW CONDUITS. TO ELEVATOR MACHINE ROOM BASEMENT 0 �( NEW > >/a^ c V NEW 1" C 3 W Z W J W Z O W J W = Q O N a- Z J 3 W Z z � aa. U 53 W D =o LnJ W TO UTI LIN SWITCHBOARD 240/12OV, 3 PHASE, 4W, 600A ALL ELECTRICAL EQUIPMENT OR DEVICES SHOWN ARE EXISTING UNLESS NOTED OTHERWISE SINGLE LINE DIAGRAM, "It i A n rt 1 1 n -r 1 I v -,.o V V.., I "Aft W-w-A (NEW) 120/240 1 3 VOLTS PHASE WIRE PANEL / F- / LOCATION MACHINE ROOM FEEDER MAIN BREAKER M. L. 0. BUSSING 100 A. ENTER CAB'T AT P. A. MTG. SURFACE LOCATION WATTAGE L-1 L-2 LTG REC MIS CIR BRK LOAD CALCULATION: BRK CIR MIS REC LT WATTAGE L-1 L-2 LOCATION ELEV, LOBBY LTS 340 10 = 20 EXISTING LOAD 100 KW = SPACE ELEV, CAR LTS. 600 3 15 4 v TIMECLOCK ELEV.PIT REC,& LT, 280 1 1 5 o (VERIFIED SCE MAX. DEMAND DOOR CONTROL N 200 11 7 15 1 8 N SPACE OF METER #P721-7516 900 5 9 20 10 0 OCCURED ON OCT. 1991) 400 11 15 12 ILz 14 o w Ev- NEW LOAD 15 HP ELEVATOR 17.5 KW D = _ = a - � o o m - iw - PANEL F 3.2 KW CL 18 w z N w z 19 TOTAL LOAD = 120.7 KW 20 z ¢ z ¢ z ¢ Zd 3 o x §- ¢ z ¢ z ¢ i-- I = 290A V) u.. w w a. �-- w - a. a cn ALL ELECTRICAL EQUIPMENT OR DEVICES SHOWN ARE EXISTING UNLESS NOTED OTHERWISE SINGLE LINE DIAGRAM, "It i A n rt 1 1 n -r 1 I v -,.o V V.., I "Aft W-w-A (NEW) 120/240 1 3 VOLTS PHASE WIRE PANEL / F- / LOCATION MACHINE ROOM FEEDER MAIN BREAKER M. L. 0. BUSSING 100 A. ENTER CAB'T AT P. A. MTG. SURFACE LOCATION WATTAGE L-1 L-2 LTG REC MIS CIR BRK BRK CIR MIS REC LT WATTAGE L-1 L-2 LOCATION ELEV, LOBBY LTS 340 10 1 20 2 SPACE ELEV, CAR LTS. 600 3 15 4 200 TIMECLOCK ELEV.PIT REC,& LT, 280 1 1 5 15 1 6 100 ROOF EXHAUST FAN DOOR CONTROL 200 11 7 15 1 8 SPACE ELEV, LOBBY REC, 900 5 9 20 10 MOTION D,/SENSOR 400 11 15 12 13 14 15 16 17 18 19 20 211 22 23 24 27 28 31 32 33 34 35 361 1 37 38 39 40 41 42 WATTS PER PHASE CONTINUOUS LOAD 1520 1200 1140 X 1.25 = + OTHER LOAD = TOTAL LOAD = 1425 1780 3305 W W W TOTAL CONNECTED WATTS 1= 14 A 100 200 1520 1620 1200 1400 WATTS PER PHASE '^ *; BASEMENT ELECTRICAL ROOM FLOOR PLAN a s IIIIII I I I I I I ( ((I III I I ( III I I I III I ( ( III III III i I I z NOTE: EXTREME CAUTION SHALL BE EXERCISED IN CONNECTING THE (2) HOT LEGS OF THIS PANEL TO EXISTIN 3};Oy, 3PH, 4W DELTA 1/8 = 1 ' —O CONNECTED SERVICE. USE (2) HOT LEGS AND NEUTRAL THAT WILL GIVE 120V LINE TO GROUND BUT NEI F ; v, ONEW 1" C USE THE HIGH LEG WHICH WILL GIVE 208V LINE TO GROUND (US ED ORANGE).a. , NEW " ���� � 2305 14 OF 16 Cf TY DWG. S1-1EE T ONEW 1 Ile C -e- CIRCUIT CONTROLLED BY TIMECLOCK. ` �� NO.- N 0. » » 8 APPROVED SECTION A���. 3/4" = 1'—O" NOT FOR CONSTRUCTION (AA) _ CITY ENGINEER R.C.E. tF` . CITY OF FONTANA WRINES, � ALLEN DIMENSIONS SHALL TAKE DIMENS ONS PRECEDENCE SHALL BEVCRI/BOCK ENGINEERING, I NC C. CLIENT SCALE VERIFIED ON ER PROJECT SCALED PROJECT NO. 92035 THE JOB SITE. ANY DISCREPANCY SHALL BE BROUGHT TO ARCHITECTURAL BARRIER REMOVAL PROJECT ELEVATOR FOR THE IMMEDIATE ATTENTION OF BOCK ENGINEERING, INC., CITY OF F C 0 N s u L T i N 0 E N 0 1 N E E R s AS SHOWN FILE NO. 9 0 5— PRIOR TO COMMENCEMENT OF ANY WORK. PERFORMING ARTS CENTER, 9460 SIERRA AVE.,FONTANA,CA.92335 2 3 04 THIS DESIGN, DRAWING, SPECIFICATION & CALCULATION IS PERFORMING ARTS CENTER STRUCTURAL • ELECTRICAL • MECHANICAL DWG. N0. REV. THE PROPERTY OF BOCK ENGINEERING, INC., & IS FOR USE 1 PLAN CHECK ELM ZM ZM 4-7-93 1 111 DWG TITLE ONLY ON THE SPECIFIC SITE INDICATED, & SHALL NOT BE 9460 SIERRA AVENUE USED ON ANY OTHER WORK OR SITE, EITHER AS A WHOLE SINGLE LINE DIAGRAM, OR IN PART. IT SHALL NOT BE ALTERED OR MODIFIED 0 FOR APPROVAL ELM MGO NA t 2-15-924650 ARROW HIGHWAY, SUITE E-2 2. EITHER AS A WHOLE OR IN PART, EXCEPT BY AUTORIZED REV DESCRIPTION DWN ENG 1CHKD DATE REV DESCRIPTION DWN ENG CHKD DATE ELECTRICAL ROOM & PANEL SCHEDULE FONTANA, CALIFORNIA 92335 EMPLOYEES OF BOCK ENGINEERING, INC.909 621-0544 MONTCLAIR, CALIFORNIA 91763 2 OF 4 DRAWINGS