HomeMy WebLinkAbout2302-3CONDUCTOR SCHEDULE
AWG
CIRCUIT
CONDUIT RUN
jzi�JA
SIGNAL MOUNTING
Q
Q
5 0
Al
QQ
8 �
#14
01
3
3
3
3
3
6
H.P.S.V.
MAST
02
3
1 3
3
B
3
03
3
3
3
04 a 07
6
6
6
35'
50'
6
250W
B
05
W/N
1 3
3
SP-2—CS
1
3
9'
06
30'
45'
3
3
3
6
N
--
02P
2
2
2
9'
0
2
30'
55'
04 P (FUTURE)
2
1 2
2
—
1 2
4
SP-1—CS
HEALTHCARE
PKWY.
06P
3.5'
0
2
2
2
4
250W
B
08 P
S
2
2
—
—
2
3'
02 PPB
1
2
2
—
B
2
S
—
04 PPB(FUTURE)
1
1
1
1
1
2
10'
—
06 PPB
—
B
08
W
1
2
SP-1—CS
—
08 PPB
3'
1
2
2
SPARES
3
3
3
3
3
6
PPB COMMON
1
1
1
1
1
2
TOTAL
19
26
32
17
19
52
#10
SIG. COMMON
1
1
1
1
1
2
LUMINAIRE
2
2
2
2
2
TOTAL
3
3
3
3
3
2
#12
AUTOSCOPE
2
2
2
2
1 2
4
**
AUTOSCOPE CABLE
1
2
2
1
2
4
*
OPTICOM CABLE
1
2
2
1
1
3
SERVICE
CONDUIT - SIZE
cv
V)
M
►7
N
N
* - OPTICOM CABLE EMERGENCY VEHICLE PREEMPTION
** - AUTOSCOPE CAMERA COAXIAL CABLE
12" RED
12" YELLOW
12" GREEN
12" GREEN
DETAIL "A"
6
EXIST. CURB & GUTTER
PROPOSED SIGNAL PHASE DIAGRAM
VALLEY
1 1/2" INTERCONNECT CONDUIT, 1 SIC ----
TO VALLEY & VINEYARD VALLEY/KAISER DWY
SEE INTERCONNECT DETAIL ON SHEET 7 OF 7
PER APPROVED SIGNAL INSTALLATION PLAN
DRAWING NO.: 2194
EXIST. CURB & GUTTER
SCALE: 1 " = 20'
PROPOSED TRAFFIC SIGNAL
CONSTRUCTION &
MAINTENANCE EASEMENT
PROPOSED SIDEWALK EASEMENT
1 1/2"C' 1 sic
1140 1 HLL
(2)R96 & R966
-I-
0 0
a
c�
z
O
1
W
CL
U
W
M
IL'
POLE LOCATION DETAIL
(No Scale)
HEALTHCARE
PARKWAY
1 1 /2"C, 1 SIC
ISSUE FOR BID
EV. REVISION DESCRIPTION
LRi N
POLE S
POLE
ARMS
LUMINAIRE
PED PUSH
SIGNAL MOUNTING
S.N.S.
PLACEMENT
5
6�/
X
8 �
-i
a
VALLEY
1 1/2" INTERCONNECT CONDUIT, 1 SIC ----
TO VALLEY & VINEYARD VALLEY/KAISER DWY
SEE INTERCONNECT DETAIL ON SHEET 7 OF 7
PER APPROVED SIGNAL INSTALLATION PLAN
DRAWING NO.: 2194
EXIST. CURB & GUTTER
SCALE: 1 " = 20'
PROPOSED TRAFFIC SIGNAL
CONSTRUCTION &
MAINTENANCE EASEMENT
PROPOSED SIDEWALK EASEMENT
1 1/2"C' 1 sic
1140 1 HLL
(2)R96 & R966
-I-
0 0
a
c�
z
O
1
W
CL
U
W
M
IL'
POLE LOCATION DETAIL
(No Scale)
HEALTHCARE
PARKWAY
1 1 /2"C, 1 SIC
ISSUE FOR BID
EV. REVISION DESCRIPTION
LRi N
POLE S
POLE
ARMS
LUMINAIRE
PED PUSH
SIGNAL MOUNTING
S.N.S.
PLACEMENT
BUTTON
N0.
1 TYPE
JHT.
SIG.
I LUM,
H.P.S.V.
MAST
POLE
PED.
LEGEND
A
B
�
O129A-5-80
35'
50'
15'
250W
B
02 08
W/N
3—MAS
SV-2—TA
SP-2—CS
HEALTHCARE
PKWY.
SEE
PLAN
9'
26A-4-80
30'
45'
15'
250W
B
02
N
--
TV -3—T
SP-1—CS
VALLEY BLVD.
PAN
9'
0
29A-5-80
30'
55'
15'
250W
—
-
—
3—MAS
SV-2—TB
SP-1—CS
HEALTHCARE
PKWY.
10'
3.5'
0
22
35'
—
15'
250W
B
06
S
—
SV -1—T
—
—
15'
3'
1—A
10'
—
—
—
B
06
S
—
TV -1—T
SP-1—CS
—
15'
3'
1—A
10'
—
--
—
B
08
W
—
TV -2—T
SP-1—CS
—
15'
3'
CONSTRUCTION NOTES
1❑ INSTALL AN 8 PHASE TYPE 90 CONTROLLER, ECONOLITE ASC -8000 WITH
SYSTEM TELEMETRY EQUIPMENT AND APPURTENANCES IN A TYPE "P"
ALUMINUM CABINET PER CITY OF FONTANA STANDARDS. FOUNDATION TO
EXTEND 18" ABOVE GRADE. CIN TO PROVIDE CABINET AND CONTROLLER
ALL ADDITIONAL EQUIPMENT REQUIRED FOR THE CITY OF FONTANA
STANDARD CONTROLLER ASSEMBLY TO PERFORM THE OPERATION SHOWN
ON THIS PLAN SHALL BE PROVIDED BY THE CONTRACTOR. SEE THE
SPECIAL PROVISI(7NS FOR STANDARD EQUIPMENT LIST.
2� FURNISH AND INSTALL A TYPE III -BF SERVICE EQUIPMENT
ENCLOSURE INCLUDING 50 AMP BREAKER (SIGNAL),
30 AMP BREAKER (LUMINAIRES), AND 15 AMP BREAKER (AUTOSCOPE).
3� INSTALL UNI -DIRECTIONAL, SINGLE CHANNEL OPTICAL DETECTOR
(OPTICOM MODEL M511 OR EQUAL).
4❑ INSTALL CITY FURNISHED AUTOSCOPE DETECTOR CAMERA APPURTENANCES
AS DIRECTED BY THE ENGINEER.
.ALL CONDUIT HAS 30"OF COVER UNLESS OTHERWISE NOTED.
9-20-91
DATE ENGR. I CITY I DATE
PULLBOX AND 3" CONDUIT
WITH PULL ROPE FOR FUTURE
SERVICE POINT.
BLVD.
LINSCOTT, LAW & GREENSPAN, ENGINEERS
TRANSPORTATION PLANNING — TRAFFIC ENGINEERING — PARKING
13 1580 CORPORATE DRIVE, SUITE 122, COSTA MESA, CA 92626 (714)841-1887
A 106 SOUTH MENTOR AVENUE, SUITE 100, PASADENA, CA 91106 (818)796-2322
O 8989 0 SAN DIEGO DR VE, SUITE 135, SAN DIEGO, CA 92108 (619)299-3090
4910- V;-5/94
7 11 RCE NO. DATE
NOTES
1. Traffic Signal and Highway Safety Lighting Systems
shall conform to and be installed per Caltrans
Standard Plans and Standard S ecificgtions
Latest Edition, as shown hereon and in the Special
provisions.
INSTALL
1 1/2" CONDUIT
1 sic
DRAWN BY:
TP
DESIGNED BY:
VS
CHECKED BY:
ill
2. Locate all substructures prior to construction, Phone
Underground Service Alert at (800) 422-4133, 2 working
days prior to construction.
3. All materials and equipment shall be furnished and installed
by the Contractor except Type 90 Controller Assembly.
Type 90 Controller and it's appurtenances, including the
Type "P" cabinet will be furnished (not installed)
by the City at cost plus processing/handling fee.
4. All wiring shall be marked (tagged) within the
controller cabinet for phase identification.
5. All signal equipment shall be wired in
accordance with the proposed signal phase diagram.
6. New pedestrian heads (6) shall be
Type A with International Symbols.
Pedestrian heads shall be the metal type.
7. All International Symbol pedestrian signal
heads shall have the pedestrian pushbutton
signs for International Symbol signals.
8. For electrical service connection, call SOLIthern
California Edison Company Mr. Hal Stuart
at (909) 357-6191. Applicable service
connection, riser costs and construction tax
shall be paid by the Contractor.
9. See approved signing and striping plans
for signing, striping and povment markings.
10. All vehicle indications shall be 12" metal, glass lenses, and
have visors and backplates. Backplates shall be one piece
metallic and louvered. All new red indications shall be L.E.D.
Per The Special Provisions.
11. Electrical service shall be 120/240 volt. Provide circuit
breakers for signal (one 50—amp), safety lighting (one 30—amp),
autoscope(one 15—amp) S.C.E. billing shall be flat rate for highway
safty lighting and metered for signals.
12. Existing signal and lighting shall remain in operation at all
times except for shut—down periods as approved by the
engineer. Temporary wiring may be required at the
contractors expense to maintain existing signal and
lighting system during construction.
,45BU/L T r�//9-/�4.
REFERENCE:
PARCEL MAP 12433, SHEET 4 OF 7
WAGNER PACIFIC, DATED 4/11/91
CITY OF FONTANA, APPROVED SIGNAL
PLAN DRAWING NO.: 2194.
CITY OF FONTANA, CALIFORNIA
ENGINEERING DIVISION
SIGNAL INSTALLATION PLAN SCALE: 1" = 20'
VALLEY BLVD. DATE:
AT HEALTH CARE PKWY. INTERIM IMPROVEMENT 01-24-94
APP VE BY: DRAWING NO.: 3
21C.fy
COVE E. SWEET, JR. VRCE 26690 DATE