1. The construction of all public improvements shall conform
to these plans and to the requirements of the City Standard
Specifications, Public Works Department, City of Fontana.
Refer to definitions and terms in City standard specifications
dated 1975.
2. Construction permits shall be obtained from Fontana Public
Works Department prior to start of any work within the City
limits.
3. Stationing refers to the centerlines of street.
4. Curb data refers to the face of the curb.
5. All exposed concrete shall conform in grade, color and finish
to all adjoining curbs and sidewalks,
6. Pavement sections shown are minimum and subject to revision
and approval of the City as required by soils test taken
after completion of rough grading.
7. All underground round work shall be completed prior to paving
of streets.
8. Existing underground utilities are asP er available records.
The contractor shall be responsible for verifying the actual
P y g
location and elevation in the field.
Contrac r
to shall call
each utility prior to any work.
9. All manhole and cleanout frames and covers shall be
constructed 6" below finished grade by sewer contractor
and shall be raised to grade by paving contractor during
paving operation. i
10. All valve frames and covers shall be constructed 6" below
finished grade by water contractor and shall be raised
to grade by paving contractor during paving operation.
11. Refer to City of Fontana, underground utility location
standard detail 129.
12. The contractor(s) shall coordinate construction with all
utilities and other improvements including, but not limited
to gas, telephone, electrical, lighting, television cable,
landscaping, landscape irrigation, domestic water, reclaimed
water, sewer, storm drainage, flood control systems, etc.
13. Record drawings shall be provided by the contractor to
the City of Fontana.
14. Type, location and width of driveway approach aprons will
be determined at the time of construction and shall conform
with the City of Fontana standard details and details hereon.
15. Contractor is instructed to refer to these plans and the
specifications, and where there is or may be a conflict
shall immediately report said conflict or possible conflict
to the owner's representative.
16. Sterilant required under all A.C. pavement.
17. No concrete shall be placed until the forms and reinforcing
steel has been placed, inspected and approved.
18. The walls and faces of all excavations greater than five
(5) feet in depth shall be effectively guarded by a shoring
system, sloping of the ground or other equivalent means.
Trenches less than five (5) feet in depth shall also be
guarded when examination indicates hazardous ground movement
i may be expected.
I
19. The contractor(s) shall obtain a permit to perform excavation
or trench work as described in note 18 above from California
State Division of Industrial Safety. See Standard
Specificiations for public works construction Section
306-1.1.6.
20. No trench backfill shall take place without prior approval
of the City's inspector.
21. Adequate stakes shall be set by the engineer to enable the
contractor to construct the work to the plan grades.
22. All utility companies shall be given 48 hours notice prior
to working around their facilities.
23. All backfill to be certified by Soils Engineer.
24. Backfill materials to have a S.E. of 30(min) and minimum
compaction of 90%.
25. Prior to construction of water sewer and/or storm drain
lines the contractor shall expose the existing water sewer
and/or storm drain lines where connections will occur and
verify their elevation and location. Approval by the City
of Fontana of a proposed connection to a City facility does
not imply approval of the correctness of the elevation and/or
location as shown on plans.
26. If during construction, ground water is encountered, a system
approved by the City Engineer shall be installed to dewater
said area at the direction of the Soils Engineer.
27. All exposed metal surfaces shall be galvanized in accordance
with the City Standard Specifications.
28. All materials and methods to be subject to the approval
of the City Engineer.
29• Contractor shall not operate any main line water valve
on existing waterlines.
30. An .encroachment permit is required from the following
agencies: The City of Fontana - Before any work may
begin in or near the City right-of-way. From Caltrans
- prior to performing any work within the State Highway
right-of-way.
revision#
31. Unless pre -approved and justified or as noted on plans,
all work within highway right-of-way shall be to State
Standards and all work within City right-of-way shall
conform to the latest City of Fontana Standard Plans
and Specifications.
32. Structural section indicated for highway is for
estimating only. Actual section will be determined
after grading and appropriate lab test. A T.I. of
10.0 should be used in the design of the highway section.
PRIVATE ENGINEER'S NOTE
The private engineer signing these plans is responsible
for assuring the accuracy and acceptability of the work
hereon. In the event of discrepancies arising during
construction, the private engineer shall be responsible
for
determining ni
ng an acceptable tabl
e s
oluti
on and revising the
plans for approval by the City.
BENCHMARK: Pin in 6" x 6" concrete Highway monument at the
South `-* ht-of-wa fent
g y e of Interstate 10, 4261 West of centerline
of Cypress.
Elevation = 1098.78 `s
i
pav�Mr�NT Not" -✓:
1. The City Public Works Inspector may require at his/her own
discretion•, that the contractor submit a soils report with
calculated OR"Ivalues and gravel equivalents for the verification
of a proper pavement thickness.
2. Pavement sections shown are minimum and subject to revision and
approval o.f the City as may be required by soils test taken after
completion of rough grading.
.3-¢'
V
y
�• ,13
-Z- V ,I- /NE ; t dflh'/ES
LAY
SECTION A '- A
TYPICAL SECTION
NOT TO SCALE
01k.
bIN
DETAIL NO. 1
DISCHARGE STRUCTURE
CONSTRUCTION NOTES: Standard drawings referred to are those of the
City
of Fontana, Public Works Department unless noted otherwise.
QTY
AV DEL I
Construct$'Is4aivaknf AC.- over 6 " AB paving. (See typical section
-
`I
Sheet 1 of 2)
104p0 SF
�
Place 2' tapered feather overlay.
44 SF'
Construct 8" curb & gutter per City of Fontana Std. Detail 101
424.10 LF
®
Place redwood header
IZO LF
OConstruct
sidewalk per this plan. (See City of Fontana std.
• c z
h
1
2
No. 105A for expansion and weaken plane joint location and
W ANS
E
u
configuration)
2020 SF
R N R -
�t
Z a oMA n T
5 A lA
Construct driveway per City of Fontana Std. Detail No. 102-C
JOB NO.
92-7-6
I
(width as shown on plan) _
960 SF
> cr S
¢ A P I
- CT
Construct discharge structure per City of Fontana std. Detail
I
' I
No. 124. nei-ai) 1
1 EA
10.
•
Paint 4" wide edge right g g line (color white)
100 LF
C 6� �...,........
VIA
�T I
Insta 11 ornamental 1 st e et lightht (Intensity shown on plan)
2E�A
13
Place variable asphalt overlay
7018 SF
14
6anStru6f di,charge s+rur,+ut-e per ri+cy of 11ontana 5+d.oefail No
124 ! 6a.
Mo
/
61 Do,+ail 2-
brown & mullins,inc.
engineering • planning •surveying
2150 north arrowhead avenue
san bernardino,california. 92405
0
(714) 886.4768
lv7. 1pCa
(01683
DETAIL NO, Z
I�-
DISCHARGE STRUCTURE
oil
k -
[SSr�
4
I
1 1
W Wln 7 bI UR
=+ TR NEY EY vii �.
I
-1 LL U
EL AGU DR
AV DEL I
CITY OF FONTANA., CALIFORNIA
-
•�:s:.
�
�k, zH PD �¢W
�
OL¢
�
f
P`A' H TR EE L
0
S fn
V v I
AL D '
- r -
3 5 r t T
°4
N
� W
I
• c z
h
1
2
w !
� .
W ANS
E
u
L T6 S. ,;._-, T
I I
R N R -
-- -J_i
W v j
C
Z a oMA n T
5 A lA
f11 g I
JOB NO.
92-7-6
I
iy
A V
Yp
FS :F '�%�
V -. IJ
> cr S
¢ A P I
- CT
Q
I
' I
Z ; y-��` �A��.: ::
9 BONITA
m
C 6� �...,........
VIA
�T I
wIS
PO
ti r IATA
i
C
/
I
roA
44 �� P
z
JU
l'-'��(:._:::<•.;::: tUPA HIl
•::;�:�::::;.,.,�L3 REGIONAL PARR;'..::�'�:`s;;.�'•'�•:`f:=:��`:;... �
, .
-
� I
v I
r
� I
r I
Mo
/
......... .:; .
\
1 PANORAMA
1 TUDOR
T
DR
WY I
-
,
I
.•. ...1 •fE 84 M
I
•Y ` `7T;.': •`:j-�',..::'..•::.•'•iC, ....�..: ,,..
KERTE LN
! 1 E TREE LN\� -.:?.;::;S;:r.;.; ;moi,:; :':�" i ORANGE BLOSBOM CIA I I ,.•/!/ D
<; " I
L.. DR
PL NCE LN.
� 7 r y : : • • 3 SPRINGAOCK IN
.: •±'� ALMA LN
S RUEZ O
ERARD
I eV.SRO rTs
'r--Y2SRIVER$IDE
I 5 COOLWATER LN
lit I . SAN ER RbINQ
_ ..
C
�9G��,
---+----�----+-----------
,---
,�--+-----+�- -N-
VICINITY MAP
NOT TO SCALEN
FIELD BOOK REF.
REV. DESCRIPTIONcrry
NO. A�
DATE PPA DATE
CITY OF FONTANA., CALIFORNIA
`1 o
DESIGNED BY
STREET IMP �EMENT PLANS
SCALE:
N
� W
JUN I P,1"E N U E
HORIZ: 1' = 40'
VERT: 1' = 4'
OZ
DRAWN BY
DATE
AUQ 1X392
L T6 S. ,;._-, T
ZC
CHECKED BYE...
!0054- Lutai r f ve
O 3
JOB NO.
92-7-6
.APPROVED
��.� 3• �• 9
DWG NO.
00 9 7
SHT NO.
o f 2
Q
rrG CITY ENGINEER, RCE -CrIZ4C
m