HomeMy WebLinkAbout2296-1BASELINE AVE. EAST
CLOSED
USE FOOTHILL
6:00 A.M. TO 4:00 P.M.
xx/xx/xx To XX/XX/XX
OLEANDER AVE.
CLOSED
USE ALTERNATE ROUTE
6:00 A.M. TO 4:00 P.M.
XX/XX/XX To XX/XX/XX
BASELINE AVE. EAST
CLOSED
USE ALTERNATE ROUTE
6:00 A.M. TO 4:00 P.M.
XX/XX/XX To XX/XX/XX
BASELINE AVE. WEST
CLOSED
USE FOOTHILL BLVD
6:00 A.M. TO 4:00 P.M.
XX/XX/XX To XX/XX/XX
BASELINE AVE. WEST
CLOSED
USE ALTERNATE ROUTE
6:00 A.M. TO 4:00 P.M.
XX/XX/XX To XX/XX/XX
PROPOSED SIGN
g EXISTING SIGN
BARRICADDE — TYPE III
BARRICADE — TYPE II
FLASHING ARROW BOARD SIGN
0 CONE OR PORTABLE DELINEATOR SPACED
AT 35' MAX. ALONG TAPER.
GENERAL NOTES
N
„A" T
-v-
END
DETOUR
C7
*DETOUR \,
sca T
MAST ARM MOUNTED AND GROUND MOUNTED SPECIAL "NO LEFT TURN"
SIGNS SHALL BE BAGGED OR COVERED DURING CONSTRUCTION.
�
t
ROAD
"All A„
EEm' ROAD
CONSTRUCTION
C
D
AHEAD
C19
Cls
DETOUR
AHEAD
Cl
F
1
C5 (RIG
JJDETOURI -yT
1. ALL TRAFFIC CONTROL WORK AND DEVICES FOR CONSTRUCTION SHALL CONFORM TO THE "MANUAL OF TRAFFIC CONTI
LATEST EDITION, CALTRANS STANDARD SPECIFICATIONS AND STANDARD PLANS, LATEST EDITION.
DETOUR
C5 (LEFT)
2. ALL WORK AREAS SHALL BE COMPLETELY CONED AND/OR DELINEATED AND/OR BARRICADED.
3. ALL ADVANCE WARNING SIGNS SHALL BE ILLUMINATED. ALL OTHER SIGNS SHALL BE EITHER REFLECTORIZED OR ILLUMINATED.
4. CONSTRUCTION TRUCK TRAFFIC MERGING INTO TRAFFIC LANES SHALL BE BY USE OF QUALIFIED FLAGGERS AND APPROPRIATE
SIGNAGE AS DIRECTED BY THE ENGINEER.
5. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATIONS SHEETS.
6. A MINIMUM 12' TRAVEL LANE AND EMERGENCY ACCESS SHALL BE MAINTAINED AT ALL TIMES.
7. IT SHALL BE THE RESPONSIBILITY OF THE PUBLIC WORKS DEPARTMENT TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL
AT ALL TIMES.
8. ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS ARE TO BE REMOVED FROM THE PAVEMENT BY SANDBLASTING BY THE
CONTRACTOR.
9. UPON COMPLETION OF CONSTRUCTION, THE PUBLIC WORKS DEPARTMENT SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES AND OTHER TRAFFIC
CONTROL DEVICES TO THEIR ORIGINAL CONDITON OR IN ACCORD WITH THE CONSTRUCTION PLANS.
10. EXACT LOCATION OF ALL EQUIPMENT AND CONTROL DEVICES TO BE DETERMINED BY THE ENGINEER. ADDITIONAL WARNING AND/OR
CONSTRUCTION SIGNS MAY BE REQUIRED BY THE ENGINEER.
11. THE PUBLIC WORKS DEPARTMENT SHALL NOTIFY THE CITY OF FONTANA TRAFFIC SECTION 48 HOURS IN ADVANCE FOR SIGNAL REPHASING.
12. ALL CONFILICTING SIGNS SHALL BE EITHER REMOVED, RELOCATED OR COVERED BY THE PUBLIC WORKS DEPARTMENT. RELOCATED SIGNS SHALL
BE INSTALLED AS SPECIFIED ON THE PLANS OR AS DETERMINED IN THE FIELD BY THE ENGINEER.
13. ALL EXISTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON THE PLANS, IF OBLITERATED BY CONSTRUCTION, SHALL BE REPLACED
IN CONFORMANCE WITH THE CURRENT EDITION OF THE TRAFFIC MANUAL PUBLISHED BY THE STATE OF CALIFORNIA, D.O.T.
ROAD
CONSTRUCTION
AHEAD
DETOUR T
AHEAD
Cis
Cl -
STOP DETOUR
DETOUR
R1 C5 (RIGHT)
C5 (LEFT) STOP T
R1
DETO U R
C5 (LEFT)
=film„c„
W
ps
0-1
.'JDETOURII
SC3
DETOUR
C5 (RIGHT)
„c„
ROAD
CLOSED
cz
ROAD CLOSED
TO
[THRU TRAFFIC
C3A AND C5 (LEFT)
w
Q
g STOP
R1
ROAD
CLOSED
AHEAD
C19
..L. » B
#DETOUR
SC3
w
Q
JDETOUR
------------
SC3
r r
i f �
=#DETOUR JDETOURJJ JDETOUR
SC3 SC3 SC3
BASELINE AVE
w
Q
w
z
� toETou
MILLER AVE.
FrIJDETOUR
SC3
DETOUR
—�T
C5 (RIGHT)
E
FOOTHILL C
C5 (LEFT)
ROAD
CONSTRUCTION
AHEAD
DETOUR
AHEAD
E OUR Cls
CS (LEFT) Cl
l � �
0
0
A6, f— DETOUR
C5 (RIGHT)
w
Q
JDETOURII
SC3
„E„
END
DETOUR
C7
-'-'-
w
Q
ROAD
CLOSED
AHEAD
C19
w
Q
JDETOUR
------------
SC3
r r
i f �
=#DETOUR JDETOURJJ JDETOUR
SC3 SC3 SC3
BASELINE AVE
w
Q
w
z
� toETou
MILLER AVE.
FrIJDETOUR
SC3
DETOUR
—�T
C5 (RIGHT)
E
FOOTHILL C
C5 (LEFT)
ROAD
CONSTRUCTION
AHEAD
DETOUR
AHEAD
E OUR Cls
CS (LEFT) Cl
l � �
0
0
A6, f— DETOUR
C5 (RIGHT)
w
Q
JDETOURII
SC3
„E„
END
DETOUR
C7
-'-'-
w
Q