Loading...
HomeMy WebLinkAbout2296-1BASELINE AVE. EAST CLOSED USE FOOTHILL 6:00 A.M. TO 4:00 P.M. xx/xx/xx To XX/XX/XX OLEANDER AVE. CLOSED USE ALTERNATE ROUTE 6:00 A.M. TO 4:00 P.M. XX/XX/XX To XX/XX/XX BASELINE AVE. EAST CLOSED USE ALTERNATE ROUTE 6:00 A.M. TO 4:00 P.M. XX/XX/XX To XX/XX/XX BASELINE AVE. WEST CLOSED USE FOOTHILL BLVD 6:00 A.M. TO 4:00 P.M. XX/XX/XX To XX/XX/XX BASELINE AVE. WEST CLOSED USE ALTERNATE ROUTE 6:00 A.M. TO 4:00 P.M. XX/XX/XX To XX/XX/XX PROPOSED SIGN g EXISTING SIGN BARRICADDE — TYPE III BARRICADE — TYPE II FLASHING ARROW BOARD SIGN 0 CONE OR PORTABLE DELINEATOR SPACED AT 35' MAX. ALONG TAPER. GENERAL NOTES N „A" T -v- END DETOUR C7 *DETOUR \, sca T MAST ARM MOUNTED AND GROUND MOUNTED SPECIAL "NO LEFT TURN" SIGNS SHALL BE BAGGED OR COVERED DURING CONSTRUCTION. � t ROAD "All A„ EEm' ROAD CONSTRUCTION C D AHEAD C19 Cls DETOUR AHEAD Cl F 1 C5 (RIG JJDETOURI -yT 1. ALL TRAFFIC CONTROL WORK AND DEVICES FOR CONSTRUCTION SHALL CONFORM TO THE "MANUAL OF TRAFFIC CONTI LATEST EDITION, CALTRANS STANDARD SPECIFICATIONS AND STANDARD PLANS, LATEST EDITION. DETOUR C5 (LEFT) 2. ALL WORK AREAS SHALL BE COMPLETELY CONED AND/OR DELINEATED AND/OR BARRICADED. 3. ALL ADVANCE WARNING SIGNS SHALL BE ILLUMINATED. ALL OTHER SIGNS SHALL BE EITHER REFLECTORIZED OR ILLUMINATED. 4. CONSTRUCTION TRUCK TRAFFIC MERGING INTO TRAFFIC LANES SHALL BE BY USE OF QUALIFIED FLAGGERS AND APPROPRIATE SIGNAGE AS DIRECTED BY THE ENGINEER. 5. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATIONS SHEETS. 6. A MINIMUM 12' TRAVEL LANE AND EMERGENCY ACCESS SHALL BE MAINTAINED AT ALL TIMES. 7. IT SHALL BE THE RESPONSIBILITY OF THE PUBLIC WORKS DEPARTMENT TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL AT ALL TIMES. 8. ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS ARE TO BE REMOVED FROM THE PAVEMENT BY SANDBLASTING BY THE CONTRACTOR. 9. UPON COMPLETION OF CONSTRUCTION, THE PUBLIC WORKS DEPARTMENT SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES AND OTHER TRAFFIC CONTROL DEVICES TO THEIR ORIGINAL CONDITON OR IN ACCORD WITH THE CONSTRUCTION PLANS. 10. EXACT LOCATION OF ALL EQUIPMENT AND CONTROL DEVICES TO BE DETERMINED BY THE ENGINEER. ADDITIONAL WARNING AND/OR CONSTRUCTION SIGNS MAY BE REQUIRED BY THE ENGINEER. 11. THE PUBLIC WORKS DEPARTMENT SHALL NOTIFY THE CITY OF FONTANA TRAFFIC SECTION 48 HOURS IN ADVANCE FOR SIGNAL REPHASING. 12. ALL CONFILICTING SIGNS SHALL BE EITHER REMOVED, RELOCATED OR COVERED BY THE PUBLIC WORKS DEPARTMENT. RELOCATED SIGNS SHALL BE INSTALLED AS SPECIFIED ON THE PLANS OR AS DETERMINED IN THE FIELD BY THE ENGINEER. 13. ALL EXISTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON THE PLANS, IF OBLITERATED BY CONSTRUCTION, SHALL BE REPLACED IN CONFORMANCE WITH THE CURRENT EDITION OF THE TRAFFIC MANUAL PUBLISHED BY THE STATE OF CALIFORNIA, D.O.T. ROAD CONSTRUCTION AHEAD DETOUR T AHEAD Cis Cl - STOP DETOUR DETOUR R1 C5 (RIGHT) C5 (LEFT) STOP T R1 DETO U R C5 (LEFT) =film„c„ W ps 0-1 .'JDETOURII SC3 DETOUR C5 (RIGHT) „c„ ROAD CLOSED cz ROAD CLOSED TO [THRU TRAFFIC C3A AND C5 (LEFT) w Q g STOP R1 ROAD CLOSED AHEAD C19 ..L. » B #DETOUR SC3 w Q JDETOUR ------------ SC3 r r i f � =#DETOUR JDETOURJJ JDETOUR SC3 SC3 SC3 BASELINE AVE w Q w z � toETou MILLER AVE. FrIJDETOUR SC3 DETOUR —�T C5 (RIGHT) E FOOTHILL C C5 (LEFT) ROAD CONSTRUCTION AHEAD DETOUR AHEAD E OUR Cls CS (LEFT) Cl l � � 0 0 A6, f— DETOUR C5 (RIGHT) w Q JDETOURII SC3 „E„ END DETOUR C7 -'-'- w Q ROAD CLOSED AHEAD C19 w Q JDETOUR ------------ SC3 r r i f � =#DETOUR JDETOURJJ JDETOUR SC3 SC3 SC3 BASELINE AVE w Q w z � toETou MILLER AVE. FrIJDETOUR SC3 DETOUR —�T C5 (RIGHT) E FOOTHILL C C5 (LEFT) ROAD CONSTRUCTION AHEAD DETOUR AHEAD E OUR Cls CS (LEFT) Cl l � � 0 0 A6, f— DETOUR C5 (RIGHT) w Q JDETOURII SC3 „E„ END DETOUR C7 -'-'- w Q