HomeMy WebLinkAbout2211-1GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS AND THE
CITY OF FONTANA PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS
DATED 1975, AND ANY REVISION THEREAFTER.
2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA
PUBLIC WORKS DEPARTMENT PRIOR TO THE START OF ANY WORK WITHIN
THE CITY LIMITS.
3. STATIONING REFERS TO THE CENTERLINES OF STREET EXCEPT WHERE
OTHERWISE NOTED.
4. CURVE DATA REFERS TO THE FACE OF THE CURB.
5. ALL EXPOSED CONCRETE SHALL CONFORM IN GRADE, COLOR AND FINISH TO
ALL ADJOINING CURBS AND SIDEWALKS.
6. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL
FOR STRUCTURAL STREET SECTION SHALL BE RECOMMENDED BY A
GEOTECHNICAL ENGINEERING REPORT AND SUBMITTED TO THE CITY OF
FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
7. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO
REVISION AND APPROVAL OF THE CITY AS REQUIRED BY SOILS TESTS
TAKEN AFTER COMPLETION OF ROUGH GRADING.
8. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES AND SWALES FROM
UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE,
THE CITY ENGINEER MAY REQUIRE TEMPORARY GUNITE SWALES, ENTERING
OR LEAVING IMPROVEMENTS.
9. ALL UNDERGROUND WORK SHALL BE COMPLETED PRIOR TO PAVING OF THE
STREETS.
10. ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE
CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. ALL
GRADES LESS THAN 0.5% SHALL BE STAKED 12.5' ON CENTER.
11. ALL PIPES OR SUBSTRUCTURES OF ANY KIND AND ALL TELEPHONE OR
POWER POLES, WATER METERS, VALVES, HYDRANTS, IRRIGATION
STRUCTURES, ETC., SHOWN OR NOT SHOWN ON THIS PLAN LOCATED WITHIN
AREAS TO BE IMPROVED AND INTERFERING WITH CONSTRUCTION, SHALL BE
RELOCATED BY OTHERS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILTY
TO NOTIFY ALL OF THE AGENCIES CONCERNED BEFORE CONSTRUCTION BEGINS.
12. ALL MANHOLE AND CLEANOUT FRAMES AND COVERS SHALL BE CONSTRUCTED
6" BELOW FINISHED GRADE BY SEWER CONTRACTOR AND SHALL BE RAISED
TO GRADE BY PAVING CONTRACTOR AFTER COMPLETION OF PAVING.
13. ALL VALVE CANS AND COVERS SHALL BE CONSTRUCTED 6" BELOW FINISHED
GRADE BY WATER CONTRACTOR AND SHALL BE RAISED TO GRADE BY PAVING
CONTRACTOR AFTER COMPLETION OF PAVING.
14. REFER TO CITY OF FONTANA, UNDERGROUND UTILITY LOCATION STANDARD
DETAIL 129.
15. THE CONTRACTOR(S) SHALL COORDINATE CONSTRUCTION WITH ALL UTILITIES
AND OTHER IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, GAS,
TELEPHONE, ELECTRICAL, LIGHTING, TELEVISION CABLE, LANDSCAPING,
LANDSCAPING IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER,
STORM DRAINAGE, FLOOD CONTROL SYSTEMS, ETC.
16. AS BUILT DRAWINGS SHALL BE PROVIDED BY THE ENGINEER TO THE CITY
OF FONTANA.
17. TYPE, LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS WILL BE
DETERMINED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM WITH
THE CITY OF FONTANA STANDARD DETAILS.
18. CONTRACTOR IS INSTRUCTED TO REFER TO THESE PLANS AND THE
SPECIFICATIONS, AND WHERE THERE IS OR MAY BE A CONFLICT SHALL
IMMEDIATELY REPORT SAID CONFLICT OR POSSIBLE CONFLICT TO THE
OWNER'S REPRESENTATIVE.
19. STERILANT REQUIRED UNDER ALL A.C. PAVEMENT.
20. NO CONCRETE SHALL BE PLACED UN11L FORMS AND REINFORCING STEEL
HAVE BEEN PLACED, INSPECTED AND APPROVED.
21. ALL UTILITY COMPANIES SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO
WORK AROUND THEIR FACILITIES.
22. ALL BACKFILL COMPACTION TO BE CERTIFIED BY SOILS ENGINEER.
23. ALL MATERIALS AND METHODS TO BE SUBJECT TO THE APPROVAL OF THE
CITY ENGINEER.
24. BACKFILL MATERIALS SHALL BE VERIFIED BY CONTRACTOR AND APPROVED
BY PUBLIC WORKS INSPECTOR PRIOR TO THE PLACING OF ANY PERMANENT
PAVEMENT.
25. CONTRACTOR TO INSTALL PAVEMENT MARKINGS AND STRIPING AS REQUIRED
BY THE CITY ENGINEER.
26. CONTRACTOR SHALL NOT OPERATE ANY MAIN LINE WATER VALVE.
27. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE
PROPOSED IMPROVEMENTS, WORK SHALL STOP AND THE ENGINEER NOTIFIED
IMMEDIATELY.
28. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE
ENGINEER AFTER THE BASE COURSE HAS BEEN CONSTRUCTED AND BEFORE
THE PAVING HAS BEEN INSTALLED SO THAT THE ENGINEER MAY INSTALL
THE STREET CENTERLINE MONUMENTS AS REQUIRED BY THE CITY CODE OF
THE CITY OF FONTANA.
29. THE CONTRACTOR SHALL PROVIDE TO THE CITY OF FONTANA TRAFFIC
ENGINEERING DIVISION, PHONE (714) 350-7610, A DETAILED TRAFFIC
CONTROL PLAN IN ACCORDANCE WITH CALTRANS TRAFFIC MANUAL, CHAPTER
5, MANUAL OF TRAFFIC CONTROLS, FOR CONSTRUCTION AND MAINTENANCE
WORK ZONES, LATEST EDITION. REVIEWED AND ACCEPTED BY THE CITY
OF FONTANA, PRIOR TO THE ISSUANCE OF THE CONSTRUCTION PERMIT.
RANDALL AVENUE
STREET IMPROVEMENT PLANS
IN THE CITY OF FONTANA, CA.
NOTICE TO CONTRACTOR
THE EXISTANCE AND APPROXIMATE LOCATION OF UNDERGROUND
UTILITIES OR STRUCTURES SHOWN ON THESE PLANS WERE
DETERMINED BY A SEARCH OF THE AVAILABLE PUBLIC RECORDS.
TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING
UNDERGROUND UTILITIES OR STRUCTURES EXCEPT AS SHOWN ON
THIS MAP.
THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT THE UTILITIES OR STRUCTURES SHOWN
AND ANY OTHER UTILITIES OR STRUCTURES AT THE SITE. IT
SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE
OWNERS OF THE UTILITIES OR STRUCTURES CONCERNED BEFOR
STARTING WORK.
THE FOLLOWING COMPANIES HAVE AN INTEREST IN THE EXISTING
FACILITIES WITHIN THE LIMITS OF THE PROJECT:
CITY OF FONTANA PACIFIC BELL
ENGINEERING SERVICE DEPT. 307 ADAMS STREET
8353 SIERRA AVENUE RIVERSIDE, CA 92504
FONTANA, CA 92335 (714) 811-2130
(714) 350- 7610
SOUTHERN CALIFORNIA EDISON SOUTHERN CALIFORNIA GAS CO.
7951 REDWOOD 2981 W. LUGONIA
FONTANA, CA 92336 P.O. BOX 3003
(714) 357-6231 REDLANDS, CA 92373
FONTANA WATER CO.
8440 NUEVO AVENUE
FONTANA, CA 92335
(714) 822-2201
FONTANA UNION WATER CO.
16779 SPRING STREET
FONTANA, CA 92335
(714) 822-9199
(714) 335-7750
COMCAST
8561 NUEVO AVENUE
FONTANA, CA 92335
(714) 350-2344
MARYGOLD MUTUAL WATER COMPANY
9715 ALDER AVENUE
BLOOMINGTON, CA 92316
(714) 877-0516
UNDERGROUND ALERT 1-800-422-4133
t
44'
46'
30.5'
EXIST. PAVEMENT TO REMAIN
w
Z
I
3
� 7
L_1
RANDALL AVENUE
FROM STA. 5+05.08 TO STA. 10+00.00
UNDERGROUND SERVICE ALERT
call: TOLL FREE
1-800-422-4133
TWO WORKING DAYS BEFORE YOU DIG
REMOVE A.C.
WHERE SHOWN
VICINITY MAP
NTS
LEGEND
CONSTRUCTION NOTES QUANTITIES
MERRILL
NEW PAVEMENT
ui
w
w
CONSTRUCT A.C. OVER A.B. (SEE GENERAL NOTE N0. 6)
Q
0
a'
CL
ui >
REMOVE &REPLACE EXISTING PAVEMENT
z
U
7)
0
w
(n
Q
:2
CONSTRUCT CONCRETE SIDEWALK PER CITY OF FONTANA STD.
4,415 S. F.
c%ftw;ITE
DETAIL 105-A.
HORIZONTAL CURB DATA
02
Q4
CONSTRUCT CONCRETE DRIVEWAY PER CIN OF FONTANA STD.
RANDALL
F-
DETAIL 102-C.
FLOW LINE
R. OR F.L.
O
w
1 EA
GUTTER LIP
G.L.
DETAIL 104-A.
z F NTLEE
60
REMOVE EXISTING CURB ONLY OR CURB &GUTTER.
480 L.F.
TOP OF CURB
T.C.
7O
MATCH EXISTING PAVEMENT PER TYPICAL SECTION.
FINISHED SURFACE
m
O8
CONSTRUCT DISCHARGE STRUCTURE PER CITY OF FONTANA
2 EA
STD. DETAIL 124.
FILBERT
G.B.
O9
HAWTHORN
300 S.F.
10
SAWCUT EXISTING A.C. PAVEMENT TO A STRAIGHT, NEAT LINE..
80 L.F.
ASPHALT CONCRETE
A.C.
HOLLY
11
INSTALL STREET LIGHT POLE WITH A 6 FT. MAST ARM (22,000
SAN BER
CONCRETE PAVEMENT
LUMENS), HIGH PRESSURE SODIUM (HPS) COBRA HEAD CUT OFF LENSE.
VARDINO
46'
30.5'
EXIST. PAVEMENT TO REMAIN
w
Z
I
3
� 7
L_1
RANDALL AVENUE
FROM STA. 5+05.08 TO STA. 10+00.00
UNDERGROUND SERVICE ALERT
call: TOLL FREE
1-800-422-4133
TWO WORKING DAYS BEFORE YOU DIG
REMOVE A.C.
WHERE SHOWN
VICINITY MAP
NTS
LEGEND
CONSTRUCTION NOTES QUANTITIES
NEW PAVEMENT
�
tO
CONSTRUCT A.C. OVER A.B. (SEE GENERAL NOTE N0. 6)
45 TONS
-
Q2
CONSTRUCT 8" CONCRETE CURB &GUTTER PER CITY OF FONTANA
464 L.F.
REMOVE &REPLACE EXISTING PAVEMENT
STD. DETAIL 101.
CONSTRUCTION NOTES2O
Q3
CONSTRUCT CONCRETE SIDEWALK PER CITY OF FONTANA STD.
4,415 S. F.
DETAIL 105-A.
HORIZONTAL CURB DATA
02
Q4
CONSTRUCT CONCRETE DRIVEWAY PER CIN OF FONTANA STD.
1 EA
DETAIL 102-C.
FLOW LINE
R. OR F.L.
O
CONSTRUCT HANDICAPPED RAMP PER CIN OF FONTANA STD.
1 EA
GUTTER LIP
G.L.
DETAIL 104-A.
60
REMOVE EXISTING CURB ONLY OR CURB &GUTTER.
480 L.F.
TOP OF CURB
T.C.
7O
MATCH EXISTING PAVEMENT PER TYPICAL SECTION.
FINISHED SURFACE
F.S.
O8
CONSTRUCT DISCHARGE STRUCTURE PER CITY OF FONTANA
2 EA
STD. DETAIL 124.
GRADE BREAK
G.B.
O9
REMOVE EXISTING A.C. PAVEMENT.
300 S.F.
10
SAWCUT EXISTING A.C. PAVEMENT TO A STRAIGHT, NEAT LINE..
80 L.F.
ASPHALT CONCRETE
A.C.
11
INSTALL STREET LIGHT POLE WITH A 6 FT. MAST ARM (22,000
CONCRETE PAVEMENT
LUMENS), HIGH PRESSURE SODIUM (HPS) COBRA HEAD CUT OFF LENSE.
VARDINO
12
INSTALL 4" VCP SEWER LATERAL PER CITY STD. DETAIL N0. 125.
46 L.F.
PLANTER BOX
❑
SEWER MAIN
WATER MAIN
0
4"W