HomeMy WebLinkAbout2208Ir
f
Y
JUNE 20'f 19-89-
,CITY
OF FONTANAV
'LANDSCAPE MAINTENANCE DISTYtIC
T PLANS
,,
DESIGN REVIEW NO. 88.-71
DEVELOPED BY:
UNION PACIFIC iLAND RESOURCES CORPORATION
2143 EAST "D" STREET SUITE 220
ONTARIO, CALIFORNIA 91764
(714) 986-4648
TRACT NO. 13974
LANDSCAPE MAINTENANCE DISTRICT AREA 103,.650 SeFo,"�.
VICINITY MAP' "RECORD DRAWING" SHEET T
-10
_M ASLAlu
� -.AN BERN ARDIN
FWY, .
ir
W
a
24 25 26
JURUPA >.
AVE.
yLj
a
oC
W
In
j
6 �_ __
LL0
RANCHO
MARLAY
AVE.
t-
! 8 CNdTEA -�
DRIVE
' -
- 3 22
-----,L.M.D. NO. 1 ANNEXATION NO. 37
LO
a
3
:
' ':E........
I
fJ
PHIL DE'
.'..............
. .w
HIAAVE.
AVE .
w
60
PpMON A
21
>
F VVY
NOT TO SCALE
MAINTENANCE AREA RESPONSIBILITY MAP
i
f
NOT TO SCALE
I
I42
L-1 — L=,km2
L__03
NDEX-
IRRIGATION
PLANS,
PLANTING PLANS
LANDSCAPE DETAILS
r.)
LANDSCAPE AR -C !T'E-CTO
KAAMYER & ASSOCIATES W .-)P'
A CALIFORNIA CORPORATION
ENVIRONMENTAL DESIGN • PLANNING • LANDSCAPE ARCHITECTURE
THE RANCH • 2837 KELLOGG AVE. • CORONA, CA 91720 • (714) 371.2441 KIL
APPROVED BY:
CITY OF FONTANA
o`WA D S CAAe
W O n
CC �
Si n lure
U
Date
J►�'4T 225 ��`Q•
F OF C ALV4
THE ARCHITECT IS RESPONSIBLE FOR
PERFORMING -THE FOLLOWING
INSPECTION REQUIREMENTS:
IDATE INSPECTION
1. Irrigation construction prior to
backfill
2. Plant material prior to installation
3. Finish grade prior to seeding
4. Irrigation coverage test
5. Compliance with approved plans
The City of Fontana Landscape Technician will conduct t h e
final, landscape inspection. A 48--h6ur notification is
required."
-DWS. 2 2,08
_M ASLAlu
AVENUE
[j
_
24 25 26
4 Z
5
6 �_ __
U
RANCHO
t-
! 8 CNdTEA -�
DRIVE
' -
- 3 22
-----,L.M.D. NO. 1 ANNEXATION NO. 37
o
<i
fJ
9 O
W
w
21
>
11 10
i
3
COL U ARD
20
1
i
=
EL CENTRO
C
RT -- - -- ---
12
13
,
--- 19 -
a
14 cc 18 -
CHERRY
---- -
W
—
W — - --
AVENUE
fJ
1
2
15
16 17
-+—d_.
i 'HILAD[LPNIA IMENUE
di
NOT TO SCALE
I
I42
L-1 — L=,km2
L__03
NDEX-
IRRIGATION
PLANS,
PLANTING PLANS
LANDSCAPE DETAILS
r.)
LANDSCAPE AR -C !T'E-CTO
KAAMYER & ASSOCIATES W .-)P'
A CALIFORNIA CORPORATION
ENVIRONMENTAL DESIGN • PLANNING • LANDSCAPE ARCHITECTURE
THE RANCH • 2837 KELLOGG AVE. • CORONA, CA 91720 • (714) 371.2441 KIL
APPROVED BY:
CITY OF FONTANA
o`WA D S CAAe
W O n
CC �
Si n lure
U
Date
J►�'4T 225 ��`Q•
F OF C ALV4
THE ARCHITECT IS RESPONSIBLE FOR
PERFORMING -THE FOLLOWING
INSPECTION REQUIREMENTS:
IDATE INSPECTION
1. Irrigation construction prior to
backfill
2. Plant material prior to installation
3. Finish grade prior to seeding
4. Irrigation coverage test
5. Compliance with approved plans
The City of Fontana Landscape Technician will conduct t h e
final, landscape inspection. A 48--h6ur notification is
required."
-DWS. 2 2,08
r