HomeMy WebLinkAbout2206-1a
1
,'
CONSTRUCTION PLANS FOR
SOUTHFIDGE VILLAGE -PHASE
ON-SITE WATER PLANS
TITLE X PROJECT)
(.N,,O a 1 43�4 6 0 2 5)
GENERAL NOTES:
1. All CONSTRUCTION TO COMPLY WITH THE PROJECT SPECIFICATIONS, THE
SAN GABRIEL VALLEY WATER COMPANY, "CONTRACT SPECIFICATIONS,
CONDITIONS, AND STANDARD DRAWINGS", JANUARY 1, 1976, SECTION 3
MATERIALS, AND SECTION 4 — CONSTRUCTION DETAILS, AND THOSE
STANDARD DRAWINGS DESCRIBED ON THESE PLANS.
2. THE CONTRACTOR SHALL CONTACT All UTILITIES A MINIMUM OF 48 HOURS
BEFORE BEGINNING WORK TO LOCATE THEIR EXISTING FACILITIES IN THE
FIELD.
3. WATER MAINS SHAH BE INSTALLED WITH A MINIMUM COVER AS DESCRIBED
IN SECTION 4 - CONSTRIKTION DETAILS, PER SAN GABRIEL VALLEY WATER
COMPANY'S "CONTRACT SPECIFICATIONS, CONDITIONS, AND STANDARD
DRAWINGS", JANUARY 1, 1976, STANDARDS.
4. EXISTING UTILITIES ARE SHOWN AS DESCRIBED BY THE UTILITY COMPANY.
SERVICE LATERALS ARE NOT INDICATED. CONTRACTOR SHALL PROTECT All
UTILITIES INDICATED OR NOT 1140ICATED BY PLAN OR BY UTILITY
COMPANY, UNTIL DISPOSITION IS DETERMINED BY THE ENGINEER.
5. EXISTING SURFACE STRUCTUIES WITHIN THE PIPE EXCAVATION ZONE SHALL
BE REMOVED AND REPLACED. TEMPORARY FACILITIES SHAH BE PROVIDED
BY THE CONTRACTOR AS REQUIRED BY THE ENGINEER.
6.' CONTRACTOR SHAH REPLACE ASPHALT PAVING TO MATCH EXISTING
STRUCTURAL SECTION OR AS REQUIRED BY THE CITY OF FONTANA.
7. All F:TTINGS SHAH BE RESTRAINED FROM MOVEMENT BY USE OF THE RODS
AND/OR ANCHOR BLOCKS AS DESCRIBED IN SECTION 4 - CONSTRUCTION
DETAILS, PER SAN GABRIEL VALLEY WATER COMPANY "CONTRACT
SPECIFICATIONS, CONDITIONS, AND STANDARD DRAWINGS", JANUARY 1,
1976, STANDARDS. 1f
8. All PIPING SHAH BE PRESSURE TESTED AS DESCRIBED IN SECTION 4 -
CONSTRUCTION DETAILS, PER SAN GABRIEL VALLEY WATER COMPANY
"CONTRACT SPECIFICATIONS, CONDITIONS, AND STANDARD DRAWINGS",
JANUARY 1, 1976, STANDARDS. THE CONTRACTOR SHAH INSTALL SUCH
TAPS, DRAINS, ETC., REQUIRED TO ADEQUATELY CONDUCT THE PRESSURE
TESTS.
9. All PIPES, VALVES, SERVICE LATERALS, AND APPURTENANCES SHAH BE .
ADEQUATELY AND THOROUGHLY DISINFECTED AS DESCRIBED IN SECTION 4 - \
CONSTRUCTION DETAILS, PER SAN GABRIEL VALLEY NATER COMPANY
"CONTRACT SPECIFICATIONS, CONDITIONS, AND STANDARD DRAWINGS",
JANUARY 1, 1976, STANDARDS.
10. FIRE HYDRANTS, WATER METER SERVICE LATERALS, AND WATER MAIN/
LATERALS LOCATION ARE SUBJECT i0 REVISION BY THE ENGINEER AS
DETERMINED BY FIELD CONDITIONS AT NO ADDITIONAL COST.
1
Ty. ING
E
M. 0. E. //543
E3CTION OATS NO,
REVISIONS
. 1 �
INDEX MAP �
EXP. /2— 31-92
PW4,2206