Loading...
HomeMy WebLinkAbout2206-1a 1 ,' CONSTRUCTION PLANS FOR SOUTHFIDGE VILLAGE -PHASE ON-SITE WATER PLANS TITLE X PROJECT) (.N,,O a 1 43�4 6 0 2 5) GENERAL NOTES: 1. All CONSTRUCTION TO COMPLY WITH THE PROJECT SPECIFICATIONS, THE SAN GABRIEL VALLEY WATER COMPANY, "CONTRACT SPECIFICATIONS, CONDITIONS, AND STANDARD DRAWINGS", JANUARY 1, 1976, SECTION 3 MATERIALS, AND SECTION 4 — CONSTRUCTION DETAILS, AND THOSE STANDARD DRAWINGS DESCRIBED ON THESE PLANS. 2. THE CONTRACTOR SHALL CONTACT All UTILITIES A MINIMUM OF 48 HOURS BEFORE BEGINNING WORK TO LOCATE THEIR EXISTING FACILITIES IN THE FIELD. 3. WATER MAINS SHAH BE INSTALLED WITH A MINIMUM COVER AS DESCRIBED IN SECTION 4 - CONSTRIKTION DETAILS, PER SAN GABRIEL VALLEY WATER COMPANY'S "CONTRACT SPECIFICATIONS, CONDITIONS, AND STANDARD DRAWINGS", JANUARY 1, 1976, STANDARDS. 4. EXISTING UTILITIES ARE SHOWN AS DESCRIBED BY THE UTILITY COMPANY. SERVICE LATERALS ARE NOT INDICATED. CONTRACTOR SHALL PROTECT All UTILITIES INDICATED OR NOT 1140ICATED BY PLAN OR BY UTILITY COMPANY, UNTIL DISPOSITION IS DETERMINED BY THE ENGINEER. 5. EXISTING SURFACE STRUCTUIES WITHIN THE PIPE EXCAVATION ZONE SHALL BE REMOVED AND REPLACED. TEMPORARY FACILITIES SHAH BE PROVIDED BY THE CONTRACTOR AS REQUIRED BY THE ENGINEER. 6.' CONTRACTOR SHAH REPLACE ASPHALT PAVING TO MATCH EXISTING STRUCTURAL SECTION OR AS REQUIRED BY THE CITY OF FONTANA. 7. All F:TTINGS SHAH BE RESTRAINED FROM MOVEMENT BY USE OF THE RODS AND/OR ANCHOR BLOCKS AS DESCRIBED IN SECTION 4 - CONSTRUCTION DETAILS, PER SAN GABRIEL VALLEY WATER COMPANY "CONTRACT SPECIFICATIONS, CONDITIONS, AND STANDARD DRAWINGS", JANUARY 1, 1976, STANDARDS. 1f 8. All PIPING SHAH BE PRESSURE TESTED AS DESCRIBED IN SECTION 4 - CONSTRUCTION DETAILS, PER SAN GABRIEL VALLEY WATER COMPANY "CONTRACT SPECIFICATIONS, CONDITIONS, AND STANDARD DRAWINGS", JANUARY 1, 1976, STANDARDS. THE CONTRACTOR SHAH INSTALL SUCH TAPS, DRAINS, ETC., REQUIRED TO ADEQUATELY CONDUCT THE PRESSURE TESTS. 9. All PIPES, VALVES, SERVICE LATERALS, AND APPURTENANCES SHAH BE . ADEQUATELY AND THOROUGHLY DISINFECTED AS DESCRIBED IN SECTION 4 - \ CONSTRUCTION DETAILS, PER SAN GABRIEL VALLEY NATER COMPANY "CONTRACT SPECIFICATIONS, CONDITIONS, AND STANDARD DRAWINGS", JANUARY 1, 1976, STANDARDS. 10. FIRE HYDRANTS, WATER METER SERVICE LATERALS, AND WATER MAIN/ LATERALS LOCATION ARE SUBJECT i0 REVISION BY THE ENGINEER AS DETERMINED BY FIELD CONDITIONS AT NO ADDITIONAL COST. 1 Ty. ING E M. 0. E. //543 E3CTION OATS NO, REVISIONS . 1 � INDEX MAP � EXP. /2— 31-92 PW4,2206