HomeMy WebLinkAbout2182-5D. LANDSCAPE OBSERVATION SCHEDULE THE FOLLOWING OBSERVATION VISITS SHALL BE INITIATED BY THE CONTRACTOR AND COORDI- NATED THROUGH THE OWNER (JOB SUPERINTENDENT). THE CONTRACTOR SHALL NOTIFY OWNER (JOB SUPERINTENDENT) NOT LESS THAN FORTY EIGHT (48) HOURS IN ADVANCE OF ANY SUCH OBSERVATION VISIT. CONTINUED WORK WITHOUT NOTIFICATION OR OBSERVATION VISIT AT THESE PHASES OF THE WORK IS AT CONTRACTORS RISK, WITH ANY REQUIRED CHANGE OR MODIFICATION AT CONTRACTORS EXPENSE. OWNER (JOB SUPERINTENDENT) SHALL BE INFORMED BY LANDSCAPE ARCHITECT AS TO TIMING AND PURPOSE OF OBSERVATION VISITS. 1. CONTRACTOR ORIENTATION/PRECONSTRUCTION MEETING: THIS MEETING SHALL BE CONDUCTED TO DISCUSS THE PLANS AND SPECIFICATIONS, POS- SIBLE DISCREPANCIES, SITE CONDITIONS AND OTHER ASPECTS OF THE PROJECT IRRI- GATION WORK SUCH AS SCHEDULE AND REQUIREMENTS FOR STARTING WORK. PRIOR TO THE MEETING, CONTRACTOR SHALL THOROUGHLY ACQUAINT HIMSELF WITH SITE CONDITIONS AND THE PLANS AND SPECIFICATIONS. 2. IRRIGATION MAINLINE AND FOUIP.4ENT LAYOUT: THIS OBSERVATION VISIT SHALL BE PERFORMED FOLLOWING STAKING OF ALL PRESSURE MAIN LINE AND CONTROL EQUIPMENT, BUT PRIOR TO ANY TRENCHING. 3. IRRIGATION MAIFLINE REVIEW AND PRESSURE TEST: THIS_OBSERVATION VISIT IS FOR THE PURPOSE OF CHECKING ALL MAINLINE FOR CONFORMANCE OF SPECIFICATIONS AND PROVING PRESSURE SYSTEM WATER TIGHT PRIOR TO BACKFILLING TRENCHES. PRESSURE TESTS MUST CONFORM TO MANUFACTURER'S SPECIFICATIONS. ALL PRESSURE LINES SHALL BE TESTED UNDER A SUSTAINED HYDROSTATIC PRESSURE OF 150 POUNDS PER SQUARE INCH FOR A PERIOD OF NOT LESS THAN TWO (2) HOURS. THIS TEST SHALL BE PERFORMED IN THE PRESENCE OF THE OWNER (JOB SUPERINTENDENT) TO MANUFAC- TURER'S ACCEPTED TESTING PROCEDURE AND APPROVED IN WRITING BY THE CONTRACTOR, PRIOR TO BACKFILLING ANY TRENCHES. CONTRACTOR SHALL FURNISH NECESSARY FORCE - PUMP AND ALL OTHER NECESSARY TESTING EQUIPMENT. a► 4. PROGRESS OBSERVATION VISITS: PERIODIC OBSERVATION VISITS SHALL BE PERFORMED BY OWNER (JOB SUPERINTENDENT) DURING THE LAYOUT OF ALL LATERAL LINE SYSTEMS, WITH TFENCHES OPEN TO VERIFY CONFORMANCE TO DETAILS, DEPTH OF PIPE AND ASSEMBLIES. 5. IRRIGATION COMPLETION/COVERAGE TEST REVIEW: THIS OBSERVATION VISIT IS TO ENSURE CONFORMANCE OF ALL IRRIGATION EQUIPMENT WITH IRRIGATION CONTRACT DOCUMENTS AND WILL CONSIST OF OPERATION OF EACH SYSTEM TO ENSURE INTENDED COVERAGE. THE CONTRACTOR SHALL FLUSH AND ADJUST ALL HEADS FOR OPTIMUM PERFORMANCE AND TO PREVENT OVERSPRAY ONTO WALKS, ROADWAYS AND BUILDINGS, ETC. THIS MAY INCLUDE CHANGES IN NOZZLE SIZES AND DEGREE OF ARC TO OPTIMIZE OPERATION. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AT HIS COST FOR THE COMPLETION, MODIFICATION OR REVISION OF THE SYSTEMS TO MEET INTENT OF THE DESIGN AND CONTRACT DOCUMENTS. ANY DISCF.EPANCY (COVERAGE) IN THE SYSTEM SHALL BE REPORTED DURING STAKING AND LAYOUT. ALL WORK SHALL CEASE UNTIL DISCREPANCIES ARE SATISFIED. E. SCOPE OF IRRIGATION WORK TOE CONTRACT SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMFNT, PROPERTY AND TRANSPORTATION TO INSTALL IRRIGATION SYSTEM AS SHOWN ON THE DRAWINGS AND DESCRIBED HEREIN. 1. BASE SHEETS WERE DERIVED FROM PLANS: PREPARED BY: Z '41, DATED: ENTITLED: 2. ALL EOUIPMENT SHALL BE AS LISTED IN THE LEGEND AND INSTALLED AS PER DETAILS, SPtCI- FICATIONS, OR MAN'UFACTURFR'S RECOMMENDATION. ANY SUBSTITUTIONS SHALL BE APPROVED IN WRITING BY OWNER (JOB SUPERINTEN'DENT). ANY UNAPPROVED EQUIPMENT SHALL BE REPLACED AT CONTRATOR'S EXPENSE. 3. WATER INFORMATION WAS OBTAINED FROM: Mf./Ms.: + OF: 4. APPROVAL OF ANY ITEM OR ALTERNATE ITEM INDICATES ONLY THAT IT APPARENTLY MEETS THE REOUIREMENTS OF THE DRAWINGS ON THE BASIS OF THE INFORMATION SUBMITTED, AND DOES NOT RELIEVE CONTRACTOR OF ANY RESPONSIBILITY. 5. MANUFACTURER'S WARRANTIES SHALL NOT RELIEVE THE CONTRACTOR OF HIS LIABILITY UNDER. THE GUARANTEE. SUCH WARRANTIES WTLL ONLY SUPPLEMIEN''T THE GUARANTEE. 6. PRESSURE MAIN LINE PIPING SIZED TWO INCHES (2") AND LARGER SHALL BE PVC CLASS 315. PRESSURE MAIN LINE PIPING FOR SIZED 1-" AND SMALLER SHALL BE PVC SCHEDULE 40. BOTH SHALL BE BURIED A MINIMUM OF 18" AND HAVE SOLVENT WELDED JOISTS MADE FROM NSF APPROVED TYPE I, GRADE I PVC COMPOUND CONFORMING TO ASTM RESIN SPECIFICATION 1785. 7. PVC SOLVENT WELD FITTINGS SHALL BE SCHEDULE 40 1-29 II -K NSF APPROVED CONFORMING TO ASTM TEST PROCEDURE D2466. 8. NON -PRESSURE FURRIED LATERAL LINE PIPING SHALL BE PVC CLASS 200, BURIED A MINIMIN OF 12" WITH SOLVENT VELD JOINTS MADE FROM NSF APPROVED, TYPE I, GRADE II PVC COMPOUND CON- FORMING TO ASTM RESIN SPECIFICATION D1784. 9. GALVANIZED STEEL PIPE SHALL BE ASA SCHEDULE_ 40 MILD STEEL SCREWED PIPE WITH MEDIUM GALVANIZED SCREWED BEADED MALLEABLE IRON FITTINGS. 10. ALL GALVANIZED PIPE AND FITTINGS INSTALLED BELOW GRADE SHALL BE POINTED WITH TWO (2) COATS OF KOPPERS #50 BITUMASTIC. 11. CONNECTIONS BETWEEN THE AUTOMATIC CONTROLLERS AND THE ELECTRIC CONTROL VALVES SHALL BE MADE WITH DIRECT BURIAL COPPER WIRE AWG-U.F. 600 VOLT. MINIMUM WIRE SIZE IS #14 BURRIED 18" BELOW GRADE. USE DIFFERENT COLOR PILOT WIRE FOR EACH CONTROLLER, CON!(1!1 WIRES SPALL BE U141TE WITH A DIFFERENT COLOR STRIPE FOR EACH AUTOMATIC CONTROLLER. 12. WIRING SHALL OCCUPY THE SAME TRENCH AND SHALL BE INSTALLED ALONG THE SAME ROUTE AS PRESSURE SUPPLY OR LATERIAL LINES WHEREVER POSSIBLE. WHERE MORE THAN ONE (1) WIRE IS PLACED IN A TRENCH, THE WIRING SHALL BE TAPED TOGETHER AT INTERVALS NOT EXCEEDING TEN (10) FEET. 13. AN EXPANSION CURL SHOULD BE PROVIDED WITHIN THREE (3) FEET OF EACH WIRE CONNTECTION AND AT LEAST EVERY ONE HUNDRED (100) FEET OF WIRE LENGTH. 14. ALL SPLICES SHALL BE MADE WITH SCOTCH-LOK #3577 CONNECTOR SEALING PACKS, PEN-TITE EIRE CONNECTOR, OR APPROVED EQUAL. USE ONE SPLICE PER CONNECTOR SEALING PACK. 15. DIG TRENCHES STRAIGHT AND SUPPORT PIPE CONTINUOUSLY ON BOTTOM TRENCH. LAY PIPE TO AN EVEN GRADE. 16. THE TRENCHES SHALL NOT BE BACKFILLED UNTIL ALL REQUIRED TESTS ARE PERFORMED. TRENCHES C. IRRIGATION OBSERVATION SCHEDULESHALL A. CONTRACTORS WORK RESPONSIBILITIES BE CAREFULLY BACKFILLED WITH APPROVED MATERIALS, FREE FROM TWO INCHES (2") OR 1. THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, TRANSPORTATION AND SERVICES NECESSARY TO PLANT AND IRRIGATE ALL AREAS AND INSTALL ALL ELEMENTS zwj AS SHOWN ON THE DRAWINGS AND DESCRIBED HEREIN. DENSITY EQUAL TO ADJACENT UNDISTURBED SOIL AND WILL CONFORM TO ADJACENT GRADES 2. ALL WORK SHALL CONFORM TO APPLICABLE LOCAL, COUNTY OR STATE CODES AND REG- m ULATIONS. THROUGP THE OWNER (JOB SUPERINTF?.'DFNT) . CONTRACTOR SPALL NOTIFY OVNER (JOB SUPER- 3. ALL WORK SHALL BE PERFORMED BY A LICENSED LANDSCAPE CONTRACTOR. � 4. THE CONTRACTOR SHALL OBTAIN, COORDINATE AND PAY FOR ANY AND ALL PERMITS, FEES 17. AND INSPECTIONS AS REQUIRED. VORK WITHOUT t:OTIFICATION OR INSPECTION OF THESE PFASFS OF THE t,ORK IS AT CON:- 5. THE CONTRACTOR SHALL CARRY ALL WORKMSN'S COMPENSATION, PUBLIC LIABILITY AND WIRING AND PIPING UNDER PAVING SHALL BE ENCASED IN PVC CLASS 315, BURIED AT A MINIMUM PROPERTY DAMAGE INSURANCE AS REOUIPED BY ALL APPLICABLE CODES, REGULATIONS AND OWNER 1. CONTRACTOR ORIFNTATION/PRECONSTRUCTION MEETING: THIS MEETING SPALL BE CON- 6. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS SHOWN ON PLANS WHERE ANY CUTTING OR BREAKING OF SIDEWALKS AND/OR CONCRETE IS NECESSARY, IT SHALL BE AT THE SITE PRIOR TO COMMENCEMENT OF ANY WORK. ALL DISCREPANCIES SHALL BF C/)U REPORTED TO OWNER (JOB SUPERINTENDENT) FOR DIRECTION IMMEDIATELY. ANY SITE CONDITIONS AND OTHFR ASPECTS OF THF PROJECT PLANTING WORK, SCHEDULE, AND CONTINUATION OF WORK IS AT CONTRACTOR'S RISK AND FXPENSE. p� • 7. IRRIGATION PIPING LAYOUT IS SCHEMATIC. CONTRACTOR CAN MAKE MINOR ADJUSTMENTS TO THE 19. SYSTEM AS REQUIRED TO AVOID PHYSICAL ELEMENTS OR CONFORM TO OTHER SITE CONDITIONS. SELF WITH SITF CONDITIONS, DRAWINGS AN'D SPECIFICATIONS PRIOR TO MEETING. IN ALL CASES THERE SHOULD BE NO CONFLICTS BETWEEN IRRIGATION SYSTEM, PLANTING, AND CONCRETE PAVING SHALL BE TWENTY FOUR INCHES (24") BELOW ROAD BED. STRUCTURAL ELEMENNTS. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING 1007 DOUBLE COVER- 20. AGE, PRIOR APPROVAL OF ANY SUCH ADJUSTMENT FROM THE OWNER (JOB SUPERINTENDENT) AND FOR SHALL BE PEPFOPMFD AFTER PLACFMFNT IN THE FIELD OF ALL PLANT MATERIALS PER RECORDING OF ANY SUCH CHANGE. LINES SHALL NOT BE INSTALLED DIRECTLY OVER ONE ANOTHER. 8. PRIOR TO INSTALLATION, CONTRACTOR SHALL INDICATE FINAL LOCATION BY STAKES OR OTHER a MEANS OF ALL PRESSURE SUPPLY LINES, HEADS AND CONTROL EOUIPMENT FOR APPROVAL BY OF ALI. PLANT MATERIAL, BACKFILL MIX ArD FINF GRADE PRIOR TO ANY PLANTING WORK. OWNER (JOP SUPERINTENDENT). CONTRACTOR SHALL ALLOW FOR POSSIBLE MINOR ADJUSTMENT DUE INSTALL EACH CONTROL VALVE IN A SEPARATE VALVE BOX WITH A MINIMUM OF TWELVE INCHES TO ACTUAL SITE CONDITIONS. Q 9. THE CONTRACTOR SHALL VERIFY THE STATIC PRESSURE, METER SIZE SIZE OF SERVICE TO METER, TO LOCATION'. AT EACH POINT OF CONNECTION AND TO MAKE FINAL CONNECTIONS ALLOWING FOR POSSIBLE MINOR DEVIATIONS•FROM LOCATION SHOWN ON PLANS DUE TO SITE CONDITIONS. ANY DEVIATION FROM DESIGN CRITERIA SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER (JOB SUPERINTENDENT). 3. PROGRESS/INSTALLATION INSPECTION'S: PERIODIC INSPECTIONF SHALL RE PERFORMED22. CONTINUATION OF WORK SHALL BE AT CONTRACTOR'S RISK AND EXPENSE. ACCOMPLISHED TO THE COMPLETE SATISFACTION OF THE OWNER (JOB SUPERINTENDENT). 10. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY LOSS TO HIS EQUIPMENT, PARTS AND MATERIALS ON THIS PROJECT UNTIL COMPLETION AND ACCEPTANCE OF THE JOB IF WRITING FORMANCE TO PLANS AND SPECIFICATIONS. • FROM THE OWNER (JOB SUPERINTENDENT). SPACING OF HEADS SHALL NOT EXCEED THE MAXIMUM INDICATED ON THE DRAWINGS. IN NO CASE 11. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY AND ALL DAMAGE DUE TO OPERA- TIONS OR NEGLECT TO UTILITIES, WORK OF OTHER CONTRACTORS, EXISTING AND NEW PLANT 4. PLANT MATFRIAL COMPLETION:/PPF-MAINTENANCE IASPECTION:: THIS INSPECTION SHALL MATERIALS OR ANY OTHER PHYSICAL ELEMENT EITHER MARKED OR UNMARKED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ACTIVITIES WITH ALL OTHER TRADES. 24. 13. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANTY ENCROACHMENT INTO ADJACENT PRIOR TO STARTING PRESCRIBED MAINTENANCE PERIOD. PROPERTY, RIGHT-OF-WAYS, EASEMENTS, SET -BACKS OR ANY OTHER LEGAL PROPERTY RESTRIC- TIOFS EITHER MARKED OR UNMARKED. 14. THE CONTRACTOR SHALL PROVIDE AND KEEP UP TO DATE A COMPLETE "AS -BUILT" RECORD SET 5. NIAIN:TFNANCE INSPFCTIORS: THESE INSPECTIOFF SPALL BE 0FRFORMME!J AT THE FN') OF OF PRINTS WHICH SHALL BE CORRECTED DAILY AND SHOW EVERY CHANGE FROM THE ORIGINAL ALL SPRINKLER HEADS SHALL BE SET PERPENDICULAR TO FINISHED GRADES UNLESS OTHERWISE DRAWINGS. BEFORE THE TIME OF THE FINAL INSPECTION, THE CONTRACTOR SHALL TRANSFER ALL INFORMATION FROM THE "AS BUILT" SET TO A REPRODUCIBLE OZALID SEPIA, PROCURED FROM WITH. THE MAINTENAN:CF SPECIFICATIONS. THE OWNER (JOB SUPERINTENDENT) ALL WORK SHALL BE NEAT AND LEGIBLE. CONTRACTOR SHALL CERTIFY REPRODUCIBLES AS TO ACCURACY AND COMPLETENESS. CONTRACTOR IS RESPONSIBLE 26. FOR UPDATIN.TG REPRODUCIBLES AS REQUIRED. 6. FINAL INSPECTION/PROJECT CFP.TIFICATION: THIS INSPECTION FILL BE PERFORMED TO 15. ALL IRRIGATION AND PLANTING WORK SHALL BE GUARANTEED BY THE CONTRACTOR AS TO MATERIAL PERIOD OF SEVEN (7) DAYS PRIOR TO ANY PLANTIr'G. AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FOLLOWING THE DATE OF FINAL ACCEPTANCE OF THE PROJECT. THE CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE ON HIS LETTERHEAD AT THF OWNER. THE TIME OF THE FINAL INSPECTION/PROJECT CERTIFICATION. 16. THE CONTRACTOR SHALL PROVIDE A WRITTEN CERTIFICATION THAT THE SPRINKLER SYSTEM AND PLANT MATERIAL ARE INSTALLED FREE FROM DEFECTS IN MATERIALS AND WORKMANSHIP AND a�w. +aim a©.•a= IN FULL COMPLIANCE WITH THE DRAWINGS AND SPECIFICATIONS. THIS SHALL BE ON THE CON- TRACTORS LETTERHEAD WITH HIS IRRIGATION AND CALIFORNIA CONTRACTORS LICENSE NUMBER. 17. THE CONTRACTOR SHALL SUPPLY TO THE OWNER (JOB SUPERINTENDENT) AS A PART OF THIS CONTRACT THE FOLLOWING ITEMS AT THE TIME OF THE FINAL INSPECTION: 1. A REPRODUCIBLE SET OF "AS -BUILT" DRAWINGS AS PER ITEM 14. 2. TWO (2) SETS OF SPECIAL TOOLS REQUIRED FOR REMOVING, DISASSEINBLING AND ADJUST- ING EACH TYPE OF SPRINKLER AND VALVE SUPPLIED ON THIS PROJECT. 3. TWO (2) KEYS FOR EACH AUTOMATIC CONTROLLER. 4. TWO (2) OUICK COUPLER KEYS AND MATCHING.HOSE SWIVELS._ 5. TWO (2) KEYS FOR VALVE BOXES. 6. THE ORIGINAL OF THE GUARANTEE LETTER. 7. THE ORIGINAL OF THE CERRIFICATION LETTER. Be OWNtOS WORK RESPONSIBILITIES 1. THE OWNER (JOB SUPERINTENDENIT) WILL BE DIRECTLY RESPONSIBLE FnR ALL ASPECTS OF CONSTRUCTION INCLUDING LANDSCAPE CONSTRUCTION INSPECTIONS. ALL INSPECTIONS SHALL BE INITIATED BY THE CONTRACTOR, AND COORDINATED THROUGH THE OWNER (JOB SUPERINTEN- DENT). THE LANDSCAPE ARCHITECT SHALL BE IN A SUPPORT OBSERVATION ROLE TO THE OWNER (JOB SUPERINTENDENT) PROVIDING INTERPRETATIVE ADVICE ONLY. 2. OWNER (JOB SUPERINTENDENT) SHALL RE RESPONSIBLE FOR DETERMINING PROPERTY LINES, RIGHT-OF-WAYS, TRACT BOUNDARIES, GRADES, EASEMENTS, UTILITY LOCATIONS ABOVE AND BELOW GRADE AND ANY OTHER LEGAL OR PHYSICAL ELEMENTS AS REQUIRED FOR THE SUCCESS- FUL COMPLETION OF THE WORK. CONTRACTOR SHALL NOT PROCEED WITH ANY WORK WITHOUT DETERMINATION OF THE ABOVE FACTS. 3. ALL QUESTIONS RELATING TO INTERPRETATION OF THE DRAWINGS AND SPECIFICATIONS, QUALITY OF WORK AND ACCEPTABLE FULFILLMENT OF INTENT OF THE DESIGN SHALL BE DECIDED BY THE OWNER (JOB SUPERINTENDENT). . 4. ALL DISCREPANCIES IN SITE CONDITIONS, DRAWINGS OR SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER (JOB SUPERINTENDENT) IMMEDIATELY. IT IS THE OV'NF.R'S (JOB SUPERINTENDENT'S) RESPONSIBILITY TO CONSULT THE LANDSCAPE ARCHITECT PRIOR TO ANY FURTHER WORK IN THAT AREA. ANY UNREPORTED DISCREPANCY AND CONTINUED WORK SHALL BE AT THE CONTRACTOR'S RISK AND EXPENSE. D. LANDSCAPE OBSERVATION SCHEDULE THE FOLLOWING OBSERVATION VISITS SHALL BE INITIATED BY THE CONTRACTOR AND COORDI- NATED THROUGH THE OWNER (JOB SUPERINTENDENT). THE CONTRACTOR SHALL NOTIFY OWNER (JOB SUPERINTENDENT) NOT LESS THAN FORTY EIGHT (48) HOURS IN ADVANCE OF ANY SUCH OBSERVATION VISIT. CONTINUED WORK WITHOUT NOTIFICATION OR OBSERVATION VISIT AT THESE PHASES OF THE WORK IS AT CONTRACTORS RISK, WITH ANY REQUIRED CHANGE OR MODIFICATION AT CONTRACTORS EXPENSE. OWNER (JOB SUPERINTENDENT) SHALL BE INFORMED BY LANDSCAPE ARCHITECT AS TO TIMING AND PURPOSE OF OBSERVATION VISITS. 1. CONTRACTOR ORIENTATION/PRECONSTRUCTION MEETING: THIS MEETING SHALL BE CONDUCTED TO DISCUSS THE PLANS AND SPECIFICATIONS, POS- SIBLE DISCREPANCIES, SITE CONDITIONS AND OTHER ASPECTS OF THE PROJECT IRRI- GATION WORK SUCH AS SCHEDULE AND REQUIREMENTS FOR STARTING WORK. PRIOR TO THE MEETING, CONTRACTOR SHALL THOROUGHLY ACQUAINT HIMSELF WITH SITE CONDITIONS AND THE PLANS AND SPECIFICATIONS. 2. IRRIGATION MAINLINE AND FOUIP.4ENT LAYOUT: THIS OBSERVATION VISIT SHALL BE PERFORMED FOLLOWING STAKING OF ALL PRESSURE MAIN LINE AND CONTROL EQUIPMENT, BUT PRIOR TO ANY TRENCHING. 3. IRRIGATION MAIFLINE REVIEW AND PRESSURE TEST: THIS_OBSERVATION VISIT IS FOR THE PURPOSE OF CHECKING ALL MAINLINE FOR CONFORMANCE OF SPECIFICATIONS AND PROVING PRESSURE SYSTEM WATER TIGHT PRIOR TO BACKFILLING TRENCHES. PRESSURE TESTS MUST CONFORM TO MANUFACTURER'S SPECIFICATIONS. ALL PRESSURE LINES SHALL BE TESTED UNDER A SUSTAINED HYDROSTATIC PRESSURE OF 150 POUNDS PER SQUARE INCH FOR A PERIOD OF NOT LESS THAN TWO (2) HOURS. THIS TEST SHALL BE PERFORMED IN THE PRESENCE OF THE OWNER (JOB SUPERINTENDENT) TO MANUFAC- TURER'S ACCEPTED TESTING PROCEDURE AND APPROVED IN WRITING BY THE CONTRACTOR, PRIOR TO BACKFILLING ANY TRENCHES. CONTRACTOR SHALL FURNISH NECESSARY FORCE - PUMP AND ALL OTHER NECESSARY TESTING EQUIPMENT. a► 4. PROGRESS OBSERVATION VISITS: PERIODIC OBSERVATION VISITS SHALL BE PERFORMED BY OWNER (JOB SUPERINTENDENT) DURING THE LAYOUT OF ALL LATERAL LINE SYSTEMS, WITH TFENCHES OPEN TO VERIFY CONFORMANCE TO DETAILS, DEPTH OF PIPE AND ASSEMBLIES. 5. IRRIGATION COMPLETION/COVERAGE TEST REVIEW: THIS OBSERVATION VISIT IS TO ENSURE CONFORMANCE OF ALL IRRIGATION EQUIPMENT WITH IRRIGATION CONTRACT DOCUMENTS AND WILL CONSIST OF OPERATION OF EACH SYSTEM TO ENSURE INTENDED COVERAGE. THE CONTRACTOR SHALL FLUSH AND ADJUST ALL HEADS FOR OPTIMUM PERFORMANCE AND TO PREVENT OVERSPRAY ONTO WALKS, ROADWAYS AND BUILDINGS, ETC. THIS MAY INCLUDE CHANGES IN NOZZLE SIZES AND DEGREE OF ARC TO OPTIMIZE OPERATION. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AT HIS COST FOR THE COMPLETION, MODIFICATION OR REVISION OF THE SYSTEMS TO MEET INTENT OF THE DESIGN AND CONTRACT DOCUMENTS. ANY DISCF.EPANCY (COVERAGE) IN THE SYSTEM SHALL BE REPORTED DURING STAKING AND LAYOUT. ALL WORK SHALL CEASE UNTIL DISCREPANCIES ARE SATISFIED. E. SCOPE OF IRRIGATION WORK TOE CONTRACT SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMFNT, PROPERTY AND TRANSPORTATION TO INSTALL IRRIGATION SYSTEM AS SHOWN ON THE DRAWINGS AND DESCRIBED HEREIN. 1. BASE SHEETS WERE DERIVED FROM PLANS: PREPARED BY: Z '41, DATED: ENTITLED: 2. ALL EOUIPMENT SHALL BE AS LISTED IN THE LEGEND AND INSTALLED AS PER DETAILS, SPtCI- FICATIONS, OR MAN'UFACTURFR'S RECOMMENDATION. ANY SUBSTITUTIONS SHALL BE APPROVED IN WRITING BY OWNER (JOB SUPERINTEN'DENT). ANY UNAPPROVED EQUIPMENT SHALL BE REPLACED AT CONTRATOR'S EXPENSE. 3. WATER INFORMATION WAS OBTAINED FROM: Mf./Ms.: + OF: 4. APPROVAL OF ANY ITEM OR ALTERNATE ITEM INDICATES ONLY THAT IT APPARENTLY MEETS THE REOUIREMENTS OF THE DRAWINGS ON THE BASIS OF THE INFORMATION SUBMITTED, AND DOES NOT RELIEVE CONTRACTOR OF ANY RESPONSIBILITY. 5. MANUFACTURER'S WARRANTIES SHALL NOT RELIEVE THE CONTRACTOR OF HIS LIABILITY UNDER. THE GUARANTEE. SUCH WARRANTIES WTLL ONLY SUPPLEMIEN''T THE GUARANTEE. 6. PRESSURE MAIN LINE PIPING SIZED TWO INCHES (2") AND LARGER SHALL BE PVC CLASS 315. PRESSURE MAIN LINE PIPING FOR SIZED 1-" AND SMALLER SHALL BE PVC SCHEDULE 40. BOTH SHALL BE BURIED A MINIMUM OF 18" AND HAVE SOLVENT WELDED JOISTS MADE FROM NSF APPROVED TYPE I, GRADE I PVC COMPOUND CONFORMING TO ASTM RESIN SPECIFICATION 1785. 7. PVC SOLVENT WELD FITTINGS SHALL BE SCHEDULE 40 1-29 II -K NSF APPROVED CONFORMING TO ASTM TEST PROCEDURE D2466. 8. NON -PRESSURE FURRIED LATERAL LINE PIPING SHALL BE PVC CLASS 200, BURIED A MINIMIN OF 12" WITH SOLVENT VELD JOINTS MADE FROM NSF APPROVED, TYPE I, GRADE II PVC COMPOUND CON- FORMING TO ASTM RESIN SPECIFICATION D1784. 9. GALVANIZED STEEL PIPE SHALL BE ASA SCHEDULE_ 40 MILD STEEL SCREWED PIPE WITH MEDIUM GALVANIZED SCREWED BEADED MALLEABLE IRON FITTINGS. 10. ALL GALVANIZED PIPE AND FITTINGS INSTALLED BELOW GRADE SHALL BE POINTED WITH TWO (2) COATS OF KOPPERS #50 BITUMASTIC. 11. CONNECTIONS BETWEEN THE AUTOMATIC CONTROLLERS AND THE ELECTRIC CONTROL VALVES SHALL BE MADE WITH DIRECT BURIAL COPPER WIRE AWG-U.F. 600 VOLT. MINIMUM WIRE SIZE IS #14 BURRIED 18" BELOW GRADE. USE DIFFERENT COLOR PILOT WIRE FOR EACH CONTROLLER, CON!(1!1 WIRES SPALL BE U141TE WITH A DIFFERENT COLOR STRIPE FOR EACH AUTOMATIC CONTROLLER. 12. WIRING SHALL OCCUPY THE SAME TRENCH AND SHALL BE INSTALLED ALONG THE SAME ROUTE AS PRESSURE SUPPLY OR LATERIAL LINES WHEREVER POSSIBLE. WHERE MORE THAN ONE (1) WIRE IS PLACED IN A TRENCH, THE WIRING SHALL BE TAPED TOGETHER AT INTERVALS NOT EXCEEDING TEN (10) FEET. 13. AN EXPANSION CURL SHOULD BE PROVIDED WITHIN THREE (3) FEET OF EACH WIRE CONNTECTION AND AT LEAST EVERY ONE HUNDRED (100) FEET OF WIRE LENGTH. 14. ALL SPLICES SHALL BE MADE WITH SCOTCH-LOK #3577 CONNECTOR SEALING PACKS, PEN-TITE EIRE CONNECTOR, OR APPROVED EQUAL. USE ONE SPLICE PER CONNECTOR SEALING PACK. 15. DIG TRENCHES STRAIGHT AND SUPPORT PIPE CONTINUOUSLY ON BOTTOM TRENCH. LAY PIPE TO AN EVEN GRADE. 16. THE TRENCHES SHALL NOT BE BACKFILLED UNTIL ALL REQUIRED TESTS ARE PERFORMED. TRENCHES C. IRRIGATION OBSERVATION SCHEDULESHALL BE CAREFULLY BACKFILLED WITH APPROVED MATERIALS, FREE FROM TWO INCHES (2") OR LARGER CLODS OF EARTH OR STONES. BACKFILL SHALL BE MECHANICALLY COMPACTED TO A DRY zwj ti DENSITY EQUAL TO ADJACENT UNDISTURBED SOIL AND WILL CONFORM TO ADJACENT GRADES THE FOLLOWING INSPECTION'S SHALL RF INITIATFD BY TNF CONTRACTOR AND COORDINATED m SURFACE WITHOUT IRREGULARITIES. THROUGP THE OWNER (JOB SUPERINTF?.'DFNT) . CONTRACTOR SPALL NOTIFY OVNER (JOB SUPER- z � IN'TFN'DENT) NOT LESS TYAN 48 NOUQS It' PDVANCE OF ANY SUCH INSPFCTIOR. CONTINUED 17. TRENCHES LOCATED UNDER PAVING, SHALL BE BACKFILLED WITH SAND TO 95% COMPACTION. ALL VORK WITHOUT t:OTIFICATION OR INSPECTION OF THESE PFASFS OF THE t,ORK IS AT CON:- V WIRING AND PIPING UNDER PAVING SHALL BE ENCASED IN PVC CLASS 315, BURIED AT A MINIMUM TRACTOR'S RISK WITH ANY CHANGE OR MODIFICATION AT CONTRACTOR'S EXPENSE. OF TWENTY FOUR INCHES (24"). 1. CONTRACTOR ORIFNTATION/PRECONSTRUCTION MEETING: THIS MEETING SPALL BE CON- 18. WHERE ANY CUTTING OR BREAKING OF SIDEWALKS AND/OR CONCRETE IS NECESSARY, IT SHALL BE DUCTED TO DISCUSS THE PLANS AND SPECIFICATIONS, POSSIBLE DISCREPANCIES AND C/)U DONE AND REPLACED BY THE CONTRACTOR AS PART OF THE CONTRACT COST. SITE CONDITIONS AND OTHFR ASPECTS OF THF PROJECT PLANTING WORK, SCHEDULE, AND Q p� REOUIREMENTS PRIOR TO STARTTNr VORK. CONTRACTOR SHALL THOROUGHLY ACOC'AINT HIM- 19. MINIMUM COVER FOR ALL PRESSURE AND NON -PRESSURE PIPING INSTALLED UNDER ASPHALTIC SELF WITH SITF CONDITIONS, DRAWINGS AN'D SPECIFICATIONS PRIOR TO MEETING. W CONCRETE PAVING SHALL BE TWENTY FOUR INCHES (24") BELOW ROAD BED. 2. PLANT MATFRIAL APPROVAL, LAYOUT ANM FINE GRADE INSPECTION: THIS INSPECTION 20. ALL LINES SHALL HAVE A MINIMUM CLEARANCE OF SIX INCHES (6") FROM EACH OTHER. PARALLEL SHALL BE PEPFOPMFD AFTER PLACFMFNT IN THE FIELD OF ALL PLANT MATERIALS PER LINES SHALL NOT BE INSTALLED DIRECTLY OVER ONE ANOTHER. THF PLANS. OWNFP (JOB SUPFRIN'TENDFFT) SHALL APPROVE PLANT MATFRIAL, LOCATIONS a OF ALI. PLANT MATERIAL, BACKFILL MIX ArD FINF GRADE PRIOR TO ANY PLANTING WORK. 21. INSTALL EACH CONTROL VALVE IN A SEPARATE VALVE BOX WITH A MINIMUM OF TWELVE INCHES CONTAINER PLANTS SHALL RE PI.ACFD ON SITF, BOXED SPECI"`ENS SHALL BE STAKED AS Q (12 ) BETWEEN VALVES, AND A MINIMUM OF SIX INCHES (6" ) FROM ANY WALK OR STRUCTURE. TO LOCATION'. SPRINKLER HEADS SHALL BE INSTALLED ONLY AFTER FLUSHING OF THE SYSTEM HAS BEEN 3. PROGRESS/INSTALLATION INSPECTION'S: PERIODIC INSPECTIONF SHALL RE PERFORMED22. ACCOMPLISHED TO THE COMPLETE SATISFACTION OF THE OWNER (JOB SUPERINTENDENT). BY THE OWYER (JOB St'PERINTFN'DENT) DURING PLANTING OPERATIONS TO INSURE COY- COcr. FORMANCE TO PLANS AND SPECIFICATIONS. • 23. SPACING OF HEADS SHALL NOT EXCEED THE MAXIMUM INDICATED ON THE DRAWINGS. IN NO CASE SHALL THE SPACING EXCEED THE MAXIMUM RECOMMENDED BY THE MANUFACTURER. 4. PLANT MATFRIAL COMPLETION:/PPF-MAINTENANCE IASPECTION:: THIS INSPECTION SHALL RFVIE6' ALL WOPK PFPPOPvv-n- UNDER THE CONTRACT FOR COMPLETENESS OF INSTALLATION 24. THE CONTRACTOR SHALL USE ALL POSSIBLE CARE TO AVOID INJURY TO EXISTING TREES AND TREE PRIOR TO STARTING PRESCRIBED MAINTENANCE PERIOD. ROOTS. 5. NIAIN:TFNANCE INSPFCTIORS: THESE INSPECTIOFF SPALL BE 0FRFORMME!J AT THE FN') OF 25. ALL SPRINKLER HEADS SHALL BE SET PERPENDICULAR TO FINISHED GRADES UNLESS OTHERWISE EACH THIRTY (30) DAY INTERVAL OF THE MAINTENANCE PERIOD TO INSURE CONFORMANCE DESIGNATED ON THE PLANS. WITH. THE MAINTENAN:CF SPECIFICATIONS. 26. THE ENTIRE SPRINKLER IRRIGATION SYSTEM SHALL BE UNDER FULL AUTOMATIC OPERATION FOR A 6. FINAL INSPECTION/PROJECT CFP.TIFICATION: THIS INSPECTION FILL BE PERFORMED TO PERIOD OF SEVEN (7) DAYS PRIOR TO ANY PLANTIr'G. REVIEW ALL ASPFCTS OF THE CONTRACTED WORK PRIOR TO RELEASING TNF PPOJFCT TO THF OWNER. a�w. +aim a©.•a= F. SCOPE OF LANDSCAPE WORK THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, PROPERTY AND TRANSPORTATION TO PLANT ALL AREAS AND PROVIDE ALL ELEMENTS AS DESIGNATED ON THE PLANS. 1. THE CONTRACTOR SHALL REMOVE ALL WEEDS, ROCKS, DEBRIS, AND OTHER EXTRANEOUS MATERIAL FROM THE JOB SITE PRIOR TO PROCEEDING WITH ANY WORK UNDER THIS CONTRACT, AND DISPOSE OF IT IN A SUITABLE AND LAWFUL MANNER. 2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINISH GRADING AND DRAINAGE IN ALL PLANTING AREAS IN ACCORDANCE WITH THE PLANS, DETAILS AND SPECIFICATIONS. (MINIMUM 2% GRADIENT ALL AREAS). 3. OWNER (JOB SUPERINTENDENT) SHALL PROVIDE ROUGH GRADE TO WITHIN 1/10TH OF ONE FOOT OF FINISH GRADE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINISH GRADE AND DRAINAGE" IN ALL PLANTING AREAS AT SPECIFIED GRADIENT. .4. CONTRACTOR SHALL BLEND INTO EXISTING GRADES AT EDGES OF DESIGNATED AREA OF WORK SMOOTHLY AND UNIFORMLY. 5. FINISH GRADES SHALL BE SMOOTH AND EVEN, WITH GRADE BREAKS BLENDED TOGETHER WITH UNIFORM VERTICAL CURVES. 6. ALL GRADES SHALL MEET STRUCTURAL ELEMENTS SUCH AS WALKS, BUILDINGS AND ANY OTHER PERMANENT OBJECTS IN -A SMOOTH EVEN LINE. 7. ALL PLANT MATERIALS SHALL BE FREE FROM INSECTS, THEIR EGGS, DISEASE, WEEDS OR ANY OTHER DETRIMENTAL ELEMENT. 8. PLANTS SHALL BE OF A SIZE, CHARACTER AND QUALITY WHICH MEETS INDUSTRY ACCEPTED STANDARDS FOR THAT PLANT. 9. OUTNER (JOB SUPERINTENDENT) MAY REJECT ANY AND ALL PLANTS REGARDED AS UNSUITABLE AT ANY TIME. SUCH PLANTS SHALL BE RFMIOVED AT ONCE FROM THE JOB•SITE AND REPLACED AT NO ADDITIONAL COST TO THE OWNER. 10. ALL PLANTS SHALL BE HANDLED AND STORED SO THAT THEY ARE ADEQUATELY PROTECTED FROM, DRYING OUT, FROM SUN OR WINDBURN, OR FROM ANY OTHER INJURY. SUCH INJURY MAY RESULT IN REPLACEMENT. 11. ANY DAMAGED PLANT SHALL BE ImYEDIATELY REMOVE FROM THE SITE AND REPLACED AT NO COST OT THE OWNER. 12. ALL CONTAINER PLANT '.MATERIAL SHALL BE PLANTED AS DETAILED AND NOTED HEREIN. 13. PLANTING TABLETS AS INDICATED ON THE DETAILS SHALL BE 'BLUE CHIP' OR FOU AL 21 GRAM AND SHALL BE FURNISHED IN THE FOLLOWING RATIOS: ONE TABLET PER ONE (1) GALLON CONTAINER TWO TABLETS PER FIVE (5) GALLON CONTAINER THREE TABLETS PER FIFTEEN (15) GALLON CONTAINER FOUR TABLETS PER 24 INCH BOX FIVE TABLETS PER 30 INCH BOX SIX TABLETS PER 36 INCH BOX 14. UPON COMPLETION OF EACH PHASE OF PLAN''TING WORK, THE CON"MACTOR SHALL THOROUGHLY CLEAN THE JOB SITE OF ALL ACCUMULATED RUBBISH, DEBRIS AND OTHER EXTRANEOUS MATERIAL AND DISPOSE OF IT IN A SUITABLE AND LAWFUL MANNER. CONTRACTOR SHALL KEEP SITE CLEAN AT ALL TIMES. 15. BASE SHEETS WERE DERIVED FROM PLANS PREPARED BY: DATED: FNTITLED: /'iAll 16. BACKFILL MIX: BACKFILL MIX AROUND ALL TREES AND SHRUBS SHALL CONSIST OF THE FOLLOW- ING UNIFORMLY BLENDED MATERIALS: * PENDING SOIL SAMPLES OR 6 PARTS BY VOLUME ON SITE SOIL 4 PARTS BY VOLUME NITROGEN STABILIZED ORGANIC AMENDMENT 1 POL'ND•16-20-0 COMMERCIAL FERTILIZER PER CUBIC YARD OF MIX 2 POUNDS IRON SULPHATE PER CUBIC YARD OF MIX 10 POUNDS AGRECULIURAL GYPSUM PER CUBIC YARD OF MIX 17. SOIL PREPARATION: ALL PLANTING AREAS TO RECEIVE GROUND COVER FROM FLATS AND ALL LEVEL AREAS FROM TOP OF SLOPE TO BACK OF WALK TO RECEIVE SYDROSEEDED GROU NDCOVER SHALL RECEIVE THE FOLLOWING AMENDMIENTS UNIFORMLY BLENDED INTO THE UPPER SIX (6) INCHES OF SURFACE SOIL PER 1000 W. FT.: * PENDING SOIL SAMPLES OR 4 CU. YDS. NITROGEN STABILIZED ORGANIC AMENDMENT 10 LBS . 16-20-0 AMMONIUM PHOSPHATE _ 200 LBS. AGRICULTURAL GYPSUM 18. HYDROKULCH MATERIALS A. HYDROMULCH MIX SHALL CONSIST OF THE FOLLOWING COMPONENTS ON A PER ACRE BASIS: 2000 POUNDS PER ACRE 001� kt!:V pm� je;" 300 POUNDS PER ACRE A?04ONIUM PHOSPHATE 300 POUNDS PER ACRE UREA FORMALDEHYDE 500 POUNDS PER ACRE AGRICULTURAL GYPSUM 19. SEEDMIX: THE APPROPRIATE SEEDMIX AND WATER VOLUME SHALL BE MIXED IN THE HYDRO -SEEDING MACHINE WITH SASH OF THE SPECIFIED COMPONENTS TO ALLOW FOR A HOMEGENEOUS SLURRY WHICH IS THOROUGHLY MIXED AND CAN BE APPLIED EASILY WITHOUT CLOGGING THE HYDROMULCHING MACHINE. 20. UPON COMPLETION OF EACH, PHASE OF PLANTING WORK, TME CONTRACTOR SHALL THOROUGHLY CLEAN THE SITE OF ALL ACCLML'I.ATED RUBBISH, DEBRIS AND OTHER EXTRANEOUS MATERIAL. 21. HYDROSEED MIX AREAS: a. GERMINATION STAGE IRRIGATION: APPROXIMATELY TWENTY-FIVE (25) HOURS AFTER HYDROMULCHING THE PLANTING AREAS, THE WATERING SEQUENCE SHOULD BE INITIATED. THE WATER SHOULD BE LEFT ON LONG ENOUGH TO MOISTEN THE SOIL THOROUGHLY TO THE DEPTH OF THE FIBER TAKING CARE NOT TO SUPER SATURATE OR TO WASH THE FIBER OR SOIL PARTICLES OFF THE SLOPES. THE FIBER AND SEED MUST BE IRRIGATED FREOUENTLY TO MAINTAIN OPTIMUM MOISTURE CONTENT FOR MAXIMUM GERMINATION. AT ALL TIMES THE IRRIGATION SYSTEM MUST BE OBSERVED WHILE IN OPERATION. IRRIGATION SEQUENCE MUST BE DETERMINED BY AIR TEMPERATURE, PREVAILING WIND VELOCITY, SOIL TEXTURE, ORIENTATION AND OTHER LOGISTICAL PROBLEMS. IT IS IMPERATIVE THAT THE SOIL BE KEPT HOIST AT ALL TIMES DURING THE GERMINATION PERIOD. THE LIGHT, FREQUENT IRRIGATION SEMTENCE SNOL'iD CONTINUE UNTIL THE SEEDLINGS HAVE GROWN BEYOND THE GERMINATION STAGE. b. ESTABLISHMENT STAGE IRRIGATION: THE IRRIGATION SEQUENCE (FRECCENCY) SHALL BE REDUCED WHILE THE DURATION OF EACH WATERING CYCLE SHALL BE INCREASED. A SPECIFIC WATERING PROGRAM! SHALL BE APPROVED BY THE tx►'NTER (JOB SUPERINTENDENT) BUT SHOULD APPROXIMATE WATERING ONCE A DAY THROUGH CCKPLETIO` OF THE MAINTENANCE PERIOD. c. RE -SEEDING: THE CONTRACTOR SHALL RE -SEED ALL NON-GERIMINATING OR ERODED AREAS AT THE END OF THE INITIAL THIRTY (30) DAY YAIh-rE\A%.CF PEP IOD . d. FINAL ACCEPTANCE WILL BE GIVEN AT THE END OF (90) DAYS MMAINTENANCE ONCE 90*v GER..MIN- ATION AND PLANT ESTABLISHMENT HAS BEEN OBTAINED. 22. MAINTENANCE PERIOD: THE M!AINTENANCF PERIO?- SHALL COAL'9_ENCE UPON THE OWNER'S WRITTEN APPROVAL OF ALL PHASES OF DLAN7ING INSTALLATION AND SHALL BE FOR NINETY (90) CONTIN- UOUS CALENDAR DAYS. 23. MAINTENANCE PROCEDURES: a. GENERAL: THE GENERAL CARE AND MAINTENANCE OF ALL AREAS SHALL CONSIST OF PROPER WATERING, FERTILIZATION, W`EN'DING, CLEAN-UP AND AS NOTED BELOW. b. FERTILIZATION: MAINTENANCE WORK SHALL INCL17DE FERTILIZATION WITH AN AIrMONIUM PHOSPHATE 16-20-0 COMMERCIAL FERTILIZER AT THE RATE OF SIX (6) POUNDS PER 1000 SQ. FT. 30 DAYS, 60 DAYS AN'D 9C DAYS AFTER PLANTING. c. WEEDING: ANY CONCFN, rRATFD DENTLOPMENT OF WEFD GROU"M THAT MAY APPEAR IN PLANTING AREAS DURING THE MAINTENANCE PERIOD SHALL BE REMOVED AT TEN (10) DAY INTERVALS. THE CONTRACTOR SHALL REMOVE SUCH CONCENTRATIONS OF WEEDS MMANU ALLY . d. CLEAN-L'P: DURING THE COURSE OF THE YAIN'TEXANCE WORK, THE CONTRACTORS SHALL REMOVE SURPLUS MATERIALS AND DEBRIS FROM TFE SITE AND SHALL KEEP THE PREMISES IN A NEAT A".'D CLEAN CONDITION AT ALL TLMES . • e. DURING THE MAINTENANCE PERIOD, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ADEOUATE PROTECTION FOR ALL PLA..NTING AREAS. ANY DAMAGED AREAS SHALL BE REPAIRED AT THE CON'TRACTOR'S EXPENSE. f. THE CONTRACTOR SHALL GUARANTEE ALL CONTAINER PLANT MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE (1) YEAR. � t zwj ti w m 2 a z � 0W (%) i I.I.I V r H Z O V W D. co 0 zwj 0L0 w m 2 a z � 0W (%) W I.I.I V cm F- T 0 06 H C/)U >i Q p� Fm m W U � a .Q a H Z O V W D. co 0 DRAWN CHECKEO OATS SCALE JOB NO. �2 SHEET ©F 9MEETS Dwa. z ia2 �al m WA� 0L0 v J o (%) W ^ (O LLJ F- =N � Q � UIQ Q W U C/) a W Y Z Q COcr. O C/)LLJti D DRAWN CHECKEO OATS SCALE JOB NO. �2 SHEET ©F 9MEETS Dwa. z ia2 �al m WA�