HomeMy WebLinkAbout2180-4i
REVISIONS I BY
A. CONTRACTORS WORK RESPONSIBILITIES.
D. LANDSCAPE OBSERVATION SCHEDULE
F.
SCOPE OF LANDSCAPE WORK
1.
TNF CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, TRANSPORTATION AND
THE FOLLOWING OBSERVATION VISITS SHALL BE INITIATED BY THE CONTRACTOR AND COORDI-
THE
CONTRACTOR, SHALL FURNISH ALL LABOR, 'MATERIALS, EQUIPMENT, PROPERTY AND TRANSPORTATION
L0
O
SERVICES NECESSARY TO PLANT AND IRRIGATE ALL AREAS AND INSTALL ALL ELEMENTS
NATED THROUGH THE OWNER (JOB SUPERINTENDENT). THE CONTRACTOR SHALL NOTIFY OWNER
TO
PLANT ALL AREAS AND PROVIDE ALL ELEMENTS AS DESIGNATED ON THE PLANS.
a
AS SHOWN ON THE DRAWINGS ANTD DESCRIBED HEREIN.
(JOB SUPERINTENDENT) NOT LESS THAN FORTY EIGHT (48) HOURS IN ADVANCE OF ANY SUCH
o>=
(.0
}
OBSERVATION VISIT. CONTINUED WORK WITHOUT NOTIFICATION OR OBSERVATION VISIT AT
1.
THE CONTRACTOR SHALL REMOVE ALL INEEDS, ROCKS, DEBRIS, AND OTHER EXTRANEOUS MATERIAL
0
2•
ALL WORK SHALL CONFORM TO APPLICABLE LOCAL, COUNTY OR STATE CODES AND REG-
THESE PHASES OF THE WORK IS AT CONTRACTORS RISK, WITH ANY REQUIRED CHANGE OR
Ua
FROM THE JOB SITE PRIOR TO PROCEEDING WITH ANY WORK UNDER THIS CONTRACT, AND DISPOSE
W
m
ULATIONS.
MODIFICATION AT CONTRACTORS EXPENSE. OWNER (JOB SUPERINTENDENT) SHALL BE INFORMED
Q
OF IT IN A SUITABLE AND LAWFUL MANNER.
w
BY
LANDSCAPE ARCHITECT AS TO TIMING AND PURPOSE OF OBSERVATION VISITS.
W
3.
ALL WORK SHALL BE PERFORMED BY A LICENSED LANDSCAPE CONTRACTOR.
Z
2.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINISH GRADING AND DRAINAGE IN ALL PLANTING
1.
CONTRACTOR ORIENTATION/PRECONSTRUCTION MEETING:
AREAS IN ACCORDANCE WITH THE PLANS, DETAILS AND SPECIFICATIONS. (MINIMUM 2I GRADIENT
4.
THE CONTRACTOR SHALL OBTAIN COORDINATE AND PAY FOR ANY AND ALL PERMITS FEES
'
THIS MEETING SHALL BE CONDUCTED TO DISCUSS THE PLANS AND SPECIFICATIONS, POS-
ALL AREAS).
I "
44*
Ar'T) INSPECTIONS AS REQUIRED,
SIBLE DISCREPANCIES, SITE CONDITIONS AND OTHER ASPECTS OF THE PROJECT IRRI-
3.
OWNER (JOB SUPERINTENDENT) SHALL PROVIDE ROUGH GRADE TO [WITHIN 1/10TH OF ONE FOOT
v
5.
THE CONTRACTOR SHALL CARRY ALL WORKMSN'S COMPENSATION PUBLIC LIABILITY AND
GATION WORK SUCH AS SCHEDULE AND REQUIREMENTS FOR STARTING WORK. PRIOR TO THE
Te
OF FINISH GRADE. RESpOI��II3LE FOR FINISH GRADE AND DRAINAGE`
'
PROPERTY DAMAGE INSURANCE AS REOUIPED BY ALL APPLICABLE CODES, REGULATIONS
MEETING, CONTRACTOR SHALL THOROUGHLY ACQUAINT HIMSELF WITH SITE CONDITIONS AND
AREAS ATNSPECIFOIF.DHGRAD$ENT.
IN ALL PLANTING A AS
TUE PLANS AND SPECIFICATIONS.
AND OWNER
4.
CONTRACTOR SHALL BLEItiTO INTO EXISTING GRADES AT EDGES OF DESIGNATED AREA OF WORK
6.
THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS SHOWN ON PLANS
2.
IRRIGATION MAINLINE AND EQUIPMENT LAYOUT:
SMOOTHLY AND UNIFORMLY.
AT THE SITE PRIOR TO COMMENCEMENT OF ANY WORK. ALL DISCREPANCIES SHALL BF
THIS OBSERVATION VISIT SHALL BE PERFORMED FOLLOWING STAKING OF ALL PRESSURE MAIN
REPORTED TO OtJNER (JOB SUPERINTENDENT) FOR DIRECTION T'.�?'*IEDTATELY. ANY
LINE AND CONTROL EQUIPMENT, BUT PRIOR TO ANY TRENCHING.
5.
FINISH GRADES SHALL BE SMOOTH AND EVEN, WITH GRADE BREAKS BLENDED TOGETHER WITH
CONTINUATION OF WORK IS AT CONTRACTOR'S RISK AND FXPENSE.
UNIFORM VERTICAL CURVES.
3.
IRRIGATION MAIYLINE REVIEW AND PRESSURE TEST:
7.
IRRIGATION PIPING LAYOUT IS SCHEMATIC. CONTRACTOR CAN MAKE MINOR ADJUSTMENTS TO THE
6.
ALL GRADES SHALL MEET STRUCTURAL ELEMENTS SUCH AS WALKFr, BUILDINGS AND ANY OTHER
SYSTEM AS REQUIRED TO AVOID PHYSICAL ELEMENTS OR CONFORM TO OTHER SITE CONDITIONS,
THIS OBSERVATION VISIT IS FOR THE PURPOSE OF CHECKING ALL MAINLINE FOR CONFORMANCE
PERMANENT OBJECTS IN A SMOOTH EVEN LINE.
OF SPECIFICATIONS AND PROVING PRESSURE SYSTEM WATER TIGHT PRIOR TO BACKFILLING
IN ALL CASES THERE SHOULD BE NO CONFLICTS BETWEEN IRRIGATION SYSTEM, PLANTING, AND
TRENCHES. PRESSURE TESTS MUST CONFORM TO MANUFACTURER'S SPECIFICATIONS. ALL�
7.
�
ALL PLANT MATERIALS SHALL BE FREE FROM INSECTS, THEIR EGGS, DISEASE, WEEDS OR ANY
STRUCTURAL ELEMENNTS. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING 100'y"' DOUBLE COVER-
PRESSURE LINES SHALL BE TESTED UNDER A SUSTAINED HYDROSTATIC PRESSURE OF 150
AGE, PRIOR APPROVAL OF ANY SUCH ADJUSTMENT FROM THE OWER (JOB SUPERINTENDENT) AND FOR
POUNDS PER SQUARE INCH FOR A PERIOD OF NOT LESS THAN TWO (2) HOURS. THIS TEST
OTHER DETRIMENTAL ELEMENT.
RECORDING OF ANY SUCH CHANGE.
SHALL BE PERFORMED IN THE PRESENCE OF THE OWNER (JOB SUPERINTENDENT) TO MANUFAC-
$.
PLANTS SHALL BE OF A SIZE, CHARACTER AND QUALITY WITICH MEETS INDUSTRY ACCEPTED
8.
PRIOR TO INSTALLATION, CONTRACTOR SHALL INDICATE FINAL LOCATION BY STAKES OR OTHER
TUBER'S ACCEPTED TESTING PROCEDURE AND APPROVED IN WRITING BY THE CONTRACTOR,
STANDARDS FOR THAT PLANT.
PRIOR TO BACKFILLING ANY TRENCHES. CONTRACTOR SHALL FURNISH NECESSARY FORCE.
MEANS OF ALL PRESSURE SUPPLY LINES, HEADS AND CONTROL EQUIPMENT FOR APPROVAL BY
PUMP AND ALL OTHER NECESSARY TESTING EQUIPMENT.
9.
�
OWNER (JOB SUPERINTENDENT) MAY REJECT ANY AND ALL PLANTS REGARDED AS UNSUITABLE
OWNER (JCR SUPERINTENDENT). CONTRACTOR SHALL ALLOW FOR POSSIBLE MINOR ADJUSTMENT DUE
TO ACTUAL SITE CONDITIONS.
AT ANY TIME. SUCH PLANTS SHALL BE RFMOVED AT ONCE FROM THE JOB SITE AND REPLACED
4.
PROGRESS OBSERVATION VISITS:
AT NO ADDITIONAL COST TO THE OWNER.
9.
THE CONTRACTOR SHALL VERIFY THE STATIC PRESSURE, METER SIZE SIZE OF SERVICF TO METER,
PERIODIC OBSERVATION VISITS SHALL BE PERFORMED BY OWNER (JOB SUPERINTENDENT)
AT EACH POINT OF CONNECTION AND TO MAKE FINAL CONNECTIONS ALLOWING FOR POSSIBLE MINOR
DURING THE LAYOUT OF ALL LATERAL LINE SYSTEMS, WITH TRENCHES OPEN TO VERIFY
10.
ALL PLANTS SHALL BE HANDLED AND STORED SO THAT THEY ARE ADEQUATELY PROTECTED FROM
DEVIATIONS FROM LOCATION SHOWN ON PLANS DUE TO SITE CONDITIONS. ANY DEVIATION FROM
CONFORMANCE TO DETAILS, DEPTH OF PIPE AND ASSEMBLIES.
DRYING OUT, FROM SUN OR WINDBURN, OR FROM ANY OTHER INJURY. SUCH INJURY MAY RESULT
DESIGN CRITERIA SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER (JOB SUPERINTENDENT),
IN REPLACEMENT.
CONTIN'IJATION OF WORK SHALL BE AT CONTRACTOR'S RISK AND EXPENSE.
5.
IRRIGATION COMPLETION/COVERAGE TEST REVIEW:
11.
ANY DAMAGED PLANT SHALL BE II�IEDIATELY REMOVE FROM THE SITE AND REPLACED AT NO
'
10.
THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY LOSS TO HIS EQUIPMENT, PARTS
THIS OBSERVATION VISIT IS TO ENSURE CONFORMANCE OF ALL IRRIGATION EQUIPMENT WITH
COST OT THE OWNER.
IRRIGATION
IRRIGATION CONTRACT DOCUMENTS AND WILL CONSIST OF OPERATION OF EACH SYSTEM TO
AND MATERIALS ON THIS PROJECT UNTIL COMPLETION AND ACCEPTANCE OF THE JOB IN WRITING
INTENDED COVERAGE. THE CONTRACTOR SHALL FLUSH AND ADJUST ALL HEADS FOR
12.
ALL CONTAINER PLANT MATERIAL SHALL BE PLANTED AS DETAILED AND NOTED HEREIN.
FROM THE OWNER (JOB SUPFRINTENDENT).
OPTIMUM PERFORMANCE AND TO PREVENT OVERSPRAY ONTO WALKS, ROADWAYS AND BUILDINGS,
11.
THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY AND ALL DAMAGE DUE TO OPERA-
ETC, THIS MAY INCLUDE CHANGES IN NOZZLE SIZES AND DEGREE OF ARC TO OPTIMIZE
13.
PLANTING TABLETS AS INDICATED ON THE DETAILS SHALL BE 'BLUE CHIP' OR EQUAL 21 GRAM
TIONS OR NEGLECT TO UTILITIES, WORK OF OTHER CONTRACTORS, EXISTING AND NEW PLANT
OPERATION.
AND SHALL BE FURNISHED IN THE FOLLOWING RATIOS:
MATERIALS OR ANY OTHER PHYSICAL ELEMENT EITHER MARKED OR UNMARKED. THE CONTRACTOR
6.
THE CONTRACTOR SHALL BE RESPONSIBLE AT HIS COST FOR THE COMPLETION MODIFICATION
PER ONE (1)GALLON CONTAINER
SHALL BE RESPONSIBLE FOR COORDINATION OF ACTIVITIES WITH ALL OTHER TRADES.
OR REVISION OF THE SYSTEM'S TO MEET INTENT OF THE DESIGN AND CONTRACT DOCUMENTS,
ONE TABLET
(5) CONTAINER
TWO TABLETS PER FIVE GALLON
ANY DISCREPANCY (COVERAGE) IN THE SYSTEM SHALL BE REPORTED DURING STAKING AND
THREE TABLETS PER FIFTEEN (15) GALLON CONTAINER
13.
THF CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ANY ENCROACHMENT ITITO ADJACENT
LAYOUT. ALL WORK SHALL CEASE UNTIL DISCREPANCIES ARE SATISFIED.
FOUR TABLETS PER 24 INCH BOX
PROPERTY, RIGHT-OF-WAYS, EASEMENTS, SET -BACKS OR ANY OTHER LEGAL PROPERTY RESTRIC-
30 BOX
FIVE TABLETS PER INCH
TIONS EITHER MARKED OR UNMARKED.
SIX TABLETS PER 36 INCH BOX
14.
THE CONTRACTOR SHALL PROVIDE AND KEEP UP TO DATE A COMPLETE "AS -BUILT" RECORD SET
OF PRINTS WHICH SHALL BE CORRECTED DAILY AND SHOW EVERY CHANGE FROM THE ORIGINAL
DRAWINGS. BEFORE THE TIME OF THE FINAL INSPECTION, THE CONTRACTOR SHALL TRANSFER
14.
UPON COMPLETION OF EACH PHASE OF PLANTING WORK, THE CONTRACTOR SHALL THOROUGHLY
ALL INFORMATION FROM THE "AS BUILT" SET TO A REPRODUCIBLE OZALID SEPIA, PROCURED FROM
CLEAN THE JOB SITE OF ALL ACCUMULATED RUBBISH, DEBRIS AND OTHER EXTRANEOUS MATERIAL
THE OWNER (JOB SUPERINTENDENT) ALL WORK SHALL BE NEAT AND LEGIBLE. CONTRACTOR SHALL
AND DISPOSE OF IT IN A SUITABLE AND LAWFUL MANNER. CONTRACTOR SHALL KEEP SITE CLEAN
CERTIFY REPRODUCIBLES AS TO ACCURACY AND COMPLETENESS. CONTRACTOR IS RESPONSIBLE
FOR UPDATING REPRODUCIBLES AS REQUIRED,
E.
SCOPE OF IRRIGATION WORK
AT ALL TIMES.
15•
BASE SHEETS WERE DERIVED FROM PLANS
15.
ALL IRRIGATION AND PLANTIEG WORK SHALL BE GUARANTEED BY THE CONTRACTOR AS TO MATERIAL
THE
CONTRACT SHALL FURNISH ALL LABOR, MATERIALS, EQUTPMFNT, PROPERTY AND TRANSPORTATION
PREPARED BY: G �� GI�F�JII Gf'll l7 ��r
AND WORKMANSHIP FOR A PERIOD OF ONE YEAR FOLLOWING THE DATE OF FINAL ACCEPTANCE OF
TO
INSTALL IRRIGATION SYSTEM AS SHOWN ON THE DRAWINGS AND DESCRIBED HEREIN.
THE PROJECT. THE CONTRACTOR SHALL PROVIDE A WRITTEN GUARANTEE ON HIS LETTERHEAD AT
DATED:'
THE TIME OF THE FINAL INSPECTION/PROJECT CERTIFICATION.
1,
BASE SHEETS WERE DERIVED FROM PLANS:
BY: OIL..
ENTITLED:
16.
THE CONTRACTOR SHALL PROVIDE A WRITTEN CERTIFICATION THAT THE SPRINKLER SYSTEM AND
PREPARED
PLANT MATERIAL ARE INSTALLED FREE FROM DEFECTS IN MATERIALS AND WORKMANSHIP AND
DATED:!'
16.
BACKFILL MIX: BACKFILL MIX AROUND ALL TREES AND SHRUBS SHALL CONSIST OF THE FOLLOW -
IN FULL COMPLIANCE WITH THE DRAWINGS AND SPECIFICATIONS. THIS SHALL BE ON THE CON-
ING UNIFORMLY BLENDED MATERIALS:
TRACTORS LETTERHEAD WITH HIS IRRIGATION AND CALIFORNIA CONTRACTORS LICENSE NUMBER,
ENTITLED: ��
PENDING SOIL SAMPLES OR
17.
THE CONTRACTOR SHALL SUPPLY TO THE OWNER (JOB SUPERINTENDENT) AS A PART OF THIS
2,
ALL EQUIP"TENT SHALL BE AS LISTED IN THE LEGEND AND INSTALLED AS PER DETAILS, SPECT-
6 PARTS BY VOLUME ON SITE SOIL
CONTRACT THE FOLLOWIN{= ITEMS AT THE TIME OF THE FINAL INSPECTION:
FICATI(`NS, OR MANUFACTURER'S RECOMMENDATION. ANY SUBSTITUTIONS SHALL BE APPROVED
4 PARTS BY VOLUME NITROGEN STABILIZED ORGANIC AMENDMENT
IN WRITING BY OWNER (JOB SUPERINTENDENT). ANY UNAPPROVED EQUIPMENT SHALL BE REPLACED
1 POUND 16-20-0 COMMERCIAL FERTILIZER PER CUBIC YARD OF MIX
1. A REPRODUCIBLE SET OF "AS -BUILT" DRAWINGS AS PER ITEM 14,
AT CONTRATOR'S EXPENSE.
2 POUNDS IRON SULPHATE PER CUBIC YARD OF MIX
2. TWO (2) SETS OF SPECIAL TOOLS REQUIRED FOR REMOVING, DISASSEMBLING AND ADJUST -3.
WATER INFORMATION WAS OBTAINED FROM;
10 POUNDS AGRECULTURAL GYPSUM PER CUBIC YARD OF MIX
ING EACH TYPE OF SPRINKLER AND VALVE SUPPLIED ON THIS PROJECT.
MR./MS.:
17.
SOIL PREPARATION: ALL PLANTING AREAS TO RECEIVE GROUND COVER FROM FLATS AND ALL
3. TWO (2) KEYS FOR EACH AUTOMATIC CONTROLLER.
LEVEL AREAS FROM TOP OF SLOPE TO BACK OF WALK TO RECEIVE SYDROSEEDED GROUN'DGOVER
4, TWO (2) OUICK COUPLER KEYS AND MATCHING HOSE SWIVELS.
OF:
SHALL RECEIVE THE FOLLOWING A:'MENDMENT5 UNIFORMLY BLENDED INTO THE UPPER SIX (6)
5. TWO (2) KEYS FOR VALVE BOXES.
4.
APPROVAL OF ANY ITEM OR ALTERNATE ITEM INDICATES ONLY THAT IT APPARENTLY MEETS THE
INCHES OF SURFACE SOIL PER 1000 SQ. FT.:
REQUIREMENTS OF THE DRAWINGS ON THE BASIS OF THE INFORMATION SUBMITTED, AND DOES
_,"
�• PENDING SOIL SAMPLES OR
6. THE ORIGINAL OF THE GUARANTEE LETTER.
NOT RELIEVE CONTRACTOR OF ANY RESPONSIBILITY,
s.
-
4 CU. YDS. NITROGEN STABILIZED ORGANIC AMENDMENT
7. THE ORIGINAL OF THE CFRRTFTCATION LETTER.
10 LBS. 16-20-0 AMMONIUM PHOSPHATE
5.
MANUFACTURER'S t•JARRANTIES SPALL NOT RELIEVE THE CONTRACTOR OF HIS LIABILITY UNDER THE
200 LBS. AGRICULTURAL GYPSUM
GUARANTEE. SUCH WARRANTIES WILL ONLY SUPPLEMEtIT THE GUARANTEE.
6.
PRESSURE MAIN LINE PIPING SIZED TWO INCHES (211) AND LARGER SHALL BE PVC CLASS 315.
18.
HYDROMULCH MATERIALS
PRESSURE MAIN LINE PIPING FOR SIZED 1�" AND SMALLER SHALL BE PVC SCHEDULE 40.
A. HYDROMULCH MIX SHALL CONSIST OF THE FOLLOWING COMPONENTS ON A PER ACRE BASIS:
BOTH SHALL BE BURIED A MINIMUM OF 18" AND HAVE SOLVENT WELDED JOISTS MADE FROM NSF
APPROVED TYPE I, GRADE I PVC COMPOUND CONFORMING TO ASTM RESIN SPECIFICATION 1785.
2000 POUNDS PER ACRE CELLULOSE FIBER
300 POUNDS PER ACRE A1MMONIUM PHOSPHATE
7.
PVC SOLVENT WELD FITTINGS SHALL BE SCHEDULE 40 1-2, II -K NSF APPROVED CONFORMING TO
300 POUNDS PER ACRE UREA FORMALDEHYDE
ASTM TEST PROCEDURE D2466. '
500 POUNDS PER ACRE AGRICULTURAL GYPSUti
B.
OWNERS WORK RESPONSIBILITIES
8.
8.
NON -PRESSURE BURRIF.D LATERAL LINE PIPING SHALL BE PVC CLASS 200, BURIED A MINIMUM OF 12"
APPROVED, TYPE I, GRA IT PVC COMPOUND CON-
19.
SEEDPiIX: THE APPROPRIATE SEEDMIX AND WATER VOLUME SHALL, BE MIXED IN THE HYDRO
WITTT SOLVENT LD JOINTS MADE FROM NSF
-
-SEEDING MACHINE WITH EASE OF THE SPECIFIED COMPONENTS TO ALLOW FOR A HOMEGENEOUS
FORMING TO ASTM RESIN SPECIFICATION D1784,
SLURRY WHICH IS THOROUGHLY MIXED AND CAN BE APPLIED EASILY WITHOUT CLOGGING THE
1.
THE OWNER (JOB SUPERINTENDENT) WILL BE DIRECTLY RESPONSIBLE FOR ALL ASPECTS OF
9.
GALVANIZED STEEL PIPE SHALL BE ASA SCHEDULE 40 MILD STEEL SCREWED PIPE WITH MEDIUM
HYDROMULCHING MACHINE.
CONSTRUCTION INCLUDING LANDSCAPE CONSTRUCTION INSPECTIONS. ALL INSPECTIONS SHALL
GALVANIZED SCREWED BEADED MALLFABLE IRON FITTINGS.
20.
UPON COMPLETION OF EACH PHASE OF PLANTING WORK, THE CONTRACTOR SHALL THOROUGHLY
BE INITIATED BY THE CONTRACTOR, AND COORDINATED THROUGH THE OWNER (JOB SUPERINTEN-
CLEAN THE SITE OF ALL ACCUMULATED RUBBISH, DEBRIS AND OTHER EXTRANEOUS MATERIAL.
DENT), THE LANDSCAPE ARCHITECT SHALL BE IN A SUPPORT OBSERVATION ROLF TO THE OWNER
10.
ALL GALVANIZED PIPE AND FITTINGS INSTALLED BELOW GRADE SHALL BE POINTED WITH TWO (2)
(JOB SUPERINTENDENT) PROVIDING INTERPRETATIVE ADVICE ONLY.
COATS OF KOPPERS #50 BITUMASTIC.
21.
HYDROSEED MIX AREAS:
2.
OWNER (JOB SUPERINTENDENT) SHALL BE RESPONSIBLE FOR DETERMINING PROPERTY LINES,
11.
CONNECTIONS BETWEEN THE AUTOMATIC CONTROLLERS AND THE ELECTRIC CONTROL VALVES SHALL
GERMINATION STAGE IRRIGATION: APPROXIMATELY TWENTY-FIVE (25) HOURS AFTER HYDROMULCHING
RIGHT-OF-WAYS, TRACT BOUNDARIES, GRADES, EASEMENTS, UTILITY LOCATIONS ABOVE AND
BE MADE WITH DIRECT BURIAL COPPER WIRE AWG-U.F. 600 VOLT. MINIMUM WIRE SIZE IS #14
a.
THE PLANTING AREAS, THE WATERING SEQUENCE SHOULD BE INITIATED, THE WATER SHOULD BE
BELOW GRADE AND ANY OTHER LEGAL OR PHYSICAL ELEMENTS AS REQUIRED FOR THE SUCCESS-
Q
� �E DIFFERENT CALOR PILOT WIRE FOP EACH CONTROLLER COMMON
BURRIED 18 BELOW GRADE. U, �
LEFT ON LONG ENOUGH TO MOISTEN THE SOIL THOROUGHLY TO THE DEPTH OF THE FIBER TAKING
FL'L COMPLETION OF THE t-IORK. CONTRACTOR SHALL NOT PROCEED WITH ANY WORK WITHOUT
WIRES SHALL BE WHITEWITH A DIFFERENT COLOR STRIPE FOR EACH AUTOMATIC CONTROLLER.
CARE NOT TO SUPER SATURATE OR TO WASH THE FIBER OR SOIL PARTICLES OFF THE SLOPES.
DETERMINATION OF THE ABOVE FACTS.
THE FIBER AND SEED MUST BE IRRIGATED FREQUENTLY TO MAINTAIN OPTIMUM MOISTURE CONTENT
12,
WIRING SHALL OCCUPY THE SAME TRENCH AND SHALL BE INSTALLED ALONG THE SAME ROUTE AS
FOR MAXIMUM GERMINATION. AT ALL TIMES THE IRRIGATION SYSTEM MUST BE OBSERVED WHILE IN
3.
ALL QUESTIONS RELATING TO I
INTERPRETATION OF THE DRAWINGS AND SPECIFICATIONS, QUALITY
PRESSURE SUPPLY OR LATERIAL LINES WHEREVER POSSIBLE. WHERE MORE THAN ONE (1) WIRE
OPERATION. IRRIGATION SEQUENCE MUST BE DETERMINED BY AIR TEMPERATURE, PREVAILING
OF WORK AND ACCEPTABLE FULFILLMENT OF INTENT OF THE DESIGN SHALL BE DECIDED BY THE
IS PLACED IN A TRENCH, THE WIRING SHALL BE TAPED TOGETHER AT INTERVALS NOT EXCEEDING
WIND VELOCITY, SOIL TEXTURE, ORIENTATION AND OTHER LOGISTICAL PROBLEMS. IT IS
OWNER (JOB SUPERINTENDENT).
TEN (10) FEET.'
IMPERATIVE THAT THE SOIL BE KEPT MOIST AT ALL TIMES DURING THE GERMINATION PERIOD.
4.
ALL DISCREPANCIES IN SITE CONDITIONS, DRAWINGS OR SPECIFICATIONS SPALL BE BROUGHT
TO THE ATTENTION OF THE OWNER (JOB SUPERINTENDENT) IMMEDIATELY. IT IS THE 0[r'NF.R'S
13.
AN EXPANSION CURL SHOULD BE PROVIDED WITHIN THREE (3) FEET OF EACH WIRE CONNECTION
THE LIGHT, FREQUENT IRRIGATION SEQUENCE SHOULD CONTINUE UNTIL THE SEEDLINGS HAVE
(JOB SUPERINTENDENT'S) RESPONSIBILITY TO CONSULT THE LANDSCAPE ARCHITECT PRIOR TO
T
AND AT LEAST EVERY ONE HUNDRED (100) FEET OF WIRE LENGTH.
GROWN BEYOND THE GERMINATION STAGE.
ANY FURTHER WORK IN THAT AREA. ANY UNREPORTED DISCREPANCY AND CONTINUED WORK SHALL
BE AT THE CONTRACTOR'S RISK AND EXPENSE.
14.
ALL SPLICES SHALL BE MADE WITH SCOTCH-LOK #3577 CONNECTOR SEALING PACKS, PEN -TITS
b.
ESTABLISI-�MMENT STAGE IRRIGATION: THE IRRIGATION SEQUENCE (FREQUENCY) SHALL BE REDUCED
WIRE CONNECTOR, OR APPROVED EQUAL. USE ONE SPLICE PER CONNECTOR SEALING PACK.
WHILE THE DURATION OF EACH WATERING CYCLE SHALL BE INCREASED. A SPECIFIC WATERING
PROGRAM SHALL BE APPROVED BY THE d4I'NER (JOB SUPERINTENDENT) BUT SHOULD APPROXIMATE
15.
DIG TRENCHES STRAIGHT AND SUPPORT PIPE CONTINUOUSLY ON BOTTOM TRENCH. LAYIPIPE TO
WATERING ONCE A DAY THROUGH COMPLETION OF THE MAINTENANCE PERIOD.
AN EVEN GRADE.
C.
RE -SEEDING: THE CONTRACTOR SHALL RE -SEED ALL NON -GERMINATING OR ERODED AREAS AT THE
16,
THE TRENCHES SHALL NOT BE BACKFILLED UNTIL ALL REQUIRED TESTS ARE PERFORMED. TRENCHES
END OF THE INITIAL THIRTY (30) DAY MAINTENANCF PERIOD.
C.
IRRIGATION OBSERVATION SCHEDULE
SHALL BE CAREFULLY BACKFILLED WITH APPROVED MATERIALS, FREE FROM TWO INCHES (2") OR
COMPACTED TO A DRY
LARGER CLODS OF EARTH OR STONES. BACKFILL SHALL BE MECHANICALLY
d•
FINAL ACCEPTANCE WILL BE GIVEN AT THE END OF (90) DAYS MAINTENANCE ONCE 90QZ GERMIN-
DENSITY EQUAL TO ADJACENT UNDISTURBED SOIL AND WILL CONFORM TO ADJACENT GRADES
AND PLANT ESTABLISHMENT HAS BEEN OBTAINED,
THF
}ALL B. TI�TTIATFD R� TNF CONTRACTOR AND COORDINATED
FOLLMkING INSPECTInNS SHALL F '
SURFACE L`ITHOUT IRREGULARITIES.
WITHOUT
TT'POL'GF TT►F Ot•.'NFR (JOB SUPFRTNTFN-DFNT) . CONTRACTOR SPALL NOTIFY OWNER (JOB SUPER-
22.
r
MAINTENANCE PERIOD; THE MAINTENANCE. PERIOD SHALL COI`L'`TF,Z�:CE UPON THE OWNER'S WRITTEN
I "'TFNnFtiT)
NOT T.FSS TPA!,; 48 T'Oi'PF TT' �1.D\'AT'CE OF ANYSI'CI? I;ISPFCTIOr'. CONTINUED,
17.
a
TRENCHES LOCATED UNDER PAVING, SHALL BE BACKFILLED WITH SAND TO 95/ COMPACTION. ALL
APPROVAL OF ALL PHASES OF PLANTING INSTALLATION AND SHALL BE FOR NINETY (90) CONTIN-
t,'nRF
t:TTHOUT t'nTIFICATTON OR INSPECTION OF TPESF PIIASFS OF TPF [FORK IS AT COI.-
WIRING AND PIPING UNDER PAVING SHALL BE ENCASED IN PVC CLASS 315, BURIED AT A MINIMUM
UOUS CALENDAF. DAYS.
.
TRACTOR'F RISK WITY' ANN' CHANGE OR MOPIFTCATIO", AT CONTRACTOR'S EXPFNSE.
, , tf
OF TWENTY FOUR INCHES (24 ).
MAINTENANCE PROCEDURES:
1.
CONTRACTOR ORIFNTATTON/PRFCONSTRUCTTON 'FETING: TPIS YFETING SPALL BF CON -23.
1$.
WHERE ANY CUTTING OR BREAKING OF SIDEWALKS AND/OR CONCRETE IS NECESSARY, IT SHALL BE
PUCTFD TO OTSCUSS THF PLANS AND SPECIFICATIONS POSSIBLF DTSCRFP ANCIFS AND r
DONE AND REPLACED BY THE CONTRACTOR AS PART OF THE CONTRACT COST.
GENERAL: THE GENERAL CARE AND MAINTENANCE OF ALL AREAS SHALL CONSIST OF PROPER
FTTF COI''IIITIOI`:F ANDOTI�FR ASPFCTF OF THF PROJECT PLANTING WORK, SCI?EDL�LF AND
'
a.
WATERING FERTILIZATION WF.EDIFG CLEAN-UP AND AS NOTED BELOW.
' ' '
�F0['TRFMF°ITE PRTOR TO STARTING t-'OPK. Cnt`'TPACTOR SHALL THOROUGHLY ACOPATVT HIM-
19.
MINIMUM COVER FOR ALL PRESSURE AND NON-PRESSURF PIPING INSTALLED UNDER ASPHALTIC
SFIT VlTP SITF CnNIDITIONNS, DPAWINGS ANS SPFCIFICATInNS PRIOR TO MEFTIN'G.
CONCRETE PAVING SHALL BE TWENTY FOUR INCHES (24") BELOW ROAD BED.
b,
T AMMONIUM
FERTILIZATION: MAINTENANCE WORK SHALL INCLUDE FERTILIZATION WITH AN Ais�ONIL.4
PHOSPHATE 16-20-0 COMMERCIAL FERTILIZER AT THE RATE OF SIX (6) POUNDS PER 1[100 SQ.
�'A1�T �1r1TFRIAL APPROVAL, LAvOL'T Arm FI'E'F GRADE INSPECTION: TNTS INSPECTION
I
20.
ALL LINES SHALL HAVE A MINIMUM CLEARANCE OF SIX INCHES (6") FROM EACH OTHER. PARALLEL
FT. 30 DAYS, 60 DAYS AND 90 DAYS AFTER PLANTING.
SPALL BF PERFOP"'FP AFTER PLACF�'FNT IN TNF FIFLD OF ALI. PLANT {'ATERTAI.S PER
LINES SHALL NOT BE INSTALLED DIRECTLY OVER ONE ANOTHER.
TPF ')I.A`'S. OttiNFP (JnP SUPFRINTENDFrT) SPALL APPROVE PLANT I'ATFRIAL, LOCATTONS
c .
tJEEDTNG: ANY CONCENTRATED DEVELOPMENT OF WEED GROWTH THAT MAY APPEAR IN PLANTING
OF t�LI. PLAINT'�'ATFPTAL, BACKFILI. MTX A!'n FINE GRADE PRIOR TO AI`:�' PLANTIt`.G t•'ORK .
21.
INSTALL EACH CONTROL VALVE IN A SEPARATE VALVE BOX WITH A MINIMUM OF TWELVE INCHES
AREAS DURING THE MAINTENANCE PERIOD SHALL BE REMOVED AT TEN (10) DAY INTERVALS. THE
CONTATN'FQ PLAitTS SPA1.I. RF PLACFD ON SITF, BOXFD SPECI'.'`ENS SHALL BE STAKFn AS
(12") BETWEEN VALVES, AND A MINIMUM OF SIX INCHES (6") FROM ANY WALK OR STRUCTURE.
CONTRACTOR SHALL REMOVE SUCH CONCENTRATIONS OF WEEDS MANUALLY.
TO LOCATIC"'.
22.
SPRINKLER HEADS SHALL BE INSTALLED ONLY AFTER FLUSHING OF THE SYSTEM HAS BEEN
d.
CLEAN-UP: DURING THE COURSE OF THE 14AINTENANCE WORK, THE CONTRACTORS SHALL REMOVE
• 3.
PRPGRFSF/INSTALLATION INSPFCTTONS: PFRTODIC INSPECTIONS SHALL BE PFRFOR"IED
ACCOMPLISHED TO THE COMPLETE SATISFACTION OF THE OWNER (JOB SUPERINTENDENT).
SURPLUS MATERIALS AND DEBRIS FROM THE SITE AND SHALL KEEP THE PREMISES IN A NEAT
B%' THF Ot•'r'ER (JOB St'PFRIN'TFrrPFrT) PL'RING PLANTING OPFRATTON'S TO INSURE CON-
ARID CLEAN CONDITION AT ALL TIMES.
FCR%'AT'CF TO PLANS AND FPECIFTCATIOE� .
23.
SPACING OF HEADS SHALL NOT EXCEED THE MAXIMUM INDICATED ON THE DRAWINGS. IN NO CASE
SHALL THE SPACING EXCEED THE MAXIMUM RECOMMENDED BY THE MANUFACTURER.
e•
DURING THE�MAINTENANCE PERIOD, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
-• .
T T FR IAT. Cn. .• I� ALL
PLAT • rtA _ �I PLETTON/PRF-,,N*A.IATENAtiCF IN.c RECTION' : TNIc INSPECTION
ADEQUATE PROTECTION FOR ALL PLANTING AREAS. ANY DAMAGED AREAS SHALL BE REPAIRED AT
RF\'IFt•' :ALL VOPY PFpFOP\'FP UNDER TPE CONTFACT FOR COMPLETENESS OF INSTALLATION
24.
THE CONTRACTOR SHALL USE ALL POSSIBLE CARE TO AVOID INJURY TO EXISTING TREES AND TREE
THE CONTRACTOR'S EXPENSE.
PRIOR TO STARTING PRESCRIBED MAINTENANCE PERIOD.
ROOTS.
THE CONTRACTOR SHALL GUARANTEE ALL CONTAINER PLANT MATERIAL AND WORKMANSHIP FOR A
5.
''AINTFNA"�CE INSPECTIONS: THESE INSPECTIM'S SPALL BE pP'RFORmED AT THF END OFf.
25.
ALL SPRINKLER HEADS SHALL BE SET PERPENDICULAR TO FINISHED GRADES UNLESS OTHERWISE
PERIOD OF ONE (1) YEAR.
FACT' TI'IRT}' (30) DAA' TNTERVAI. OF THE MAINTENANCE PERIOD TO INSURE CONFORMANCE
DESIGNATED ON THE PLANS.
t'TTI' THE �!AII`ITENANCF SPFCTFICATIONS .
26.
THE ENTIRE SPRINKLER IRRIGATION SYSTEM SHALL BE UNDER FULL AUTOMATIC OPERATION FOR A
6.
FIIr'AL INSPFCTION/PROJECT CFFTIFICATION: THIS INSPECTION WILL BE PFRFCRMED TO
PERIOD OF SEVEN (7) DAYS PRIOR TO ANY PLANTING.
REVIFW ALL ASPFCTS OF TNF CONTRACTFD [YORK PRIOR TO RELEASING THF PQOJFCT TO
TT?F OVNFR .
W TEiED(W NATIOMAL TRACNQ PAPER NO t 8 6 A 3 0 X 4 2 0
REVISIONS I BY
co
Z
0
H
Q
U
LLMU
W
a
N
�
v
F..
cfl
Z
W
N
Full:
acv.
�
L0
O
U
w>
�
a
(.0
Z
o>=
(.0
}
z
N
0
�
LL
Ua
Y
W
m
�
J
�V
Q
a
w
co
Z
0
H
Q
U
LLMU
W
a
N
�
DRAWN
CHECKED
DATE
SCALE
JOB ND.
27 (::74
SHEET
OF SHEETS
D�• 2.1$0 -
0Ljr)
Full:
qT
L0
Li
o
M
C/)
w
(.0
LLJ
(.0
r
=
�
N
Q
�
Ua
O
J
�V
Q
w
c.r)Y
W
Z
Q
coO
44*
C/)
�
v
Lu
cl
DRAWN
CHECKED
DATE
SCALE
JOB ND.
27 (::74
SHEET
OF SHEETS
D�• 2.1$0 -