HomeMy WebLinkAbout2176-1DH1000 ADDCO.
CONSTRUCTION
DELAYS AHEAD
USE MANGO
PHASE 3 & 4
PHASE 3 PLACE ON EAST SIDE OF SIERRA AVE, 200' SOUTH OF ORANGE WAY
PHASE 4 PLACE ON WEST SIDE OF SIERRA AVE. 200' NORTH OF UPLAND AVE
w
Q
Q
V
z
w
C7
END
DETOUR
r
r
DH1000 ADDCO.
DETOUR
CONSTRUCTION
DETOUR
DELAYS AHEAD
C5 (R)
USE MANGO
RIGHT LANE
a
M U S T
•`•` ROAD
SEE NOTE ABOVE
TURN RIGHT
•': • CONSTitUCnON RIGHT RIGHTLANE
z
9
v
150' 50'
0
R1
C5 to
STOP DETOUR
PHASE 3
(EXISTING)
4 WAY STOP
RI
W17 (STOP
STOP
v
Imm
NOTES:
TAPER
150' 1501 150' -�1�- • 225'
ROAD
CONSMUC ION RIGHT LANE RIGHT LANE ,: ••
CLOSED CLOSED
AHEAD CR1Cl81 �� 020 (R) AHEAD �p (R) ••`
RLCA RLCJ1
Rl
STOP
R1
STOP
(EXISTING)
ALL TRAFFIC CONTROL TO BE IN ACCORDANCE WITH "STATE OF CALIFORNIA
MANUAL OF TRAFFIC CONTROLS."
USE FLASHING ARROW BOARD OR HIGH RISE SIGN FOR
ALL LANE CLOSURES.
ALL CONES TO BE 28 SPACE 30` MAXIMUM ON TAPERS
AND 60' MAXIMUM ON TANGENTS.
BARRICADES LEFT OVERNIGHT TO HAVE REFLECTIVE TAPE
AND FLASHING LIGHTS.
S
V
U
BUFFER P
150'
RIGHT LANE
MUST �
TURN RIGHT
U
C18 W=
C20 (R)
U
DETOUR
C5 (R)
WORKING HOURS FROM 7:00 AM TO 3:30 PM. FOR PKG. LANE,
WORKING HOURS FROM 9:00 AM TO 3:30 PM. FOR TRAFFIC LANE. CLOSURE.
MAINTAIN SAFE PASSAGE FOR PEDESTRIANS AND BICYCLES
AT ALL TIMES.
MAINTAIN DRIVEWAY ACCESS AT ALL TIMES.
USE FLAGMEN WHEN NECESSARY TO KEEP TRAFFIC FLOWING.
POST TEMPORARY NO PKG. SIGNS 24 HRS. IN ADVANCE WHERE REQUIRED.
CHECK WITH TRAFFIC ENGINEER REGARDING TRAFFIC SIGNALS.
ALL WORK, MATERIALS AND EQUIPMENT FOR TRAFFIC SIGNING AND STRIPING
SHALL CONFORM TO THESE PLANS AND THE STANDARDS AND SPECIFICATIONS
FOR THE CITY OF FONTANA AND THE STANDARDS AND SPECIFICATIONS OF
THE STATE OF CALIFORNIA.
TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE
LATEST CALTRANS SIGN SPECIFICATION SHEETS. SIGN CODES SHOWN HEREON
ARE TO CONFORM TO CALTRANS SPECIFICATION SHEET CODES. TRAFFIC SIGN
SIZE SHALL BE STANDARD UNLESS OTHERWISE INDICATED ON PLANS.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN
BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL AT ALL TIMES.
REMOVAL OF ALL SIGNS AND LEGEND'S SHALL BE COORDINATED WITH THE
CITY OF FONTANA TRAFFIC SECTION. STOP SIGN AND LEGENDS WILL BE
REMOVED ONLY BY CITY FORCES. FIVE (5) DAYS ADVANCE WRITTEN
NOTICE TO THE CITY TRAFFIC SECTION IS REQUIRED TO COORDINATE WORK
WITH CITY FORCES.
EXACT LOCATION OF ALL EQUIPMENT AND CONTROL DEVICES TO BE
DETERMINED BY THE ENGINEER. ADDITIONAL WARNING AND/OR
CONSTRUCTION SIGNS MAY BE REQUIRED BY THE ENGINEER.
PHASE 4
ROAD
CONSTRUCTION
AHEAD
C18
RCA
0
u�
C30 C5 (L)(L)
LANE
CLOSED
TO YAWGO
PLACE ON TYPE III BARRICADES
SIERRA AVE.
NO
TURN
ON
RED
R13
V
v� .491
L<CLOSED
C5 (R)
NO
TURN
DETOUR
RED R13
i�tANGo
o PLACE ON TYPE III BARRICADES
In
ROAD
CONSTRUCTION
AHEAD
C18
RCA
PHASE 3
MANGO AVE.
S03
QI�R
DH1000 ADDCO.
CONSTRUCTION PHASE 1 & 2
DELAYS AHEAD PHASE 1 PLACE ON EAST SIDE OF SIERRA AVE, 200' SOUTH OF CERES AVE.
USE ALT RTE. PHASE 2 PLACE ON WEST SIDE OF SIERRA AVE, 200' NORTH OF ARROW BLVD
C7
END
DETOUR
T
• • •
TAPER BUFFER
150' 150' 150' 225' S0' 150' 1
RIGHT LANE
61HM
M U S T
RIGHT LANE RIGHT LANE TURN RIGHT
CLOSED CLOSED
AHEAD AHEADle C18
CA C20 (R) C20 (R)
RLCA RLCA
C5 (R)
C5 (L)
DETOUR
PHASE 1
Cs (.)
NUEVO AVE.
ROM
OON15=C110N RIGHT LANE RIGHT LANE
CLOSED CLOSED
ANEAo ogle AHEAD C20 (R) 020 AHEAD(R)
RLCA
180' 1 SO' 1 SO'
C5 (L)
*=I
PHASE 1
C5 (L)
P<DEOURE 2
DRAWN BY. D HERNANDEZ (310) 428-8141
Ao
S C A I_ 20 40 60
62220106
2I 7 (v
C5 (R)
W
a
DETOUR
a
U
Z
C18
J
RIGHT LANE
M U S T
•`•` ROAD
TURN RIGHT
•': • CONSTitUCnON RIGHT RIGHTLANE
AHEAD �� ��
C.
RCA C20 (R)
�LCOA(R)
v
150' 50'
RLCA
225' 150' 150' 130'
BUFFER
TAPER
.A -
C7
END
DETOUR
>
CABLE & CONDUIT CONMMN
IL0131 1tmI4 amoom OMNI%
DRAWN BY. D HERNANDEZ (310) 428-8141
Ao
S C A I_ 20 40 60
62220106
2I 7 (v