Loading...
HomeMy WebLinkAbout2176-1DH1000 ADDCO. CONSTRUCTION DELAYS AHEAD USE MANGO PHASE 3 & 4 PHASE 3 PLACE ON EAST SIDE OF SIERRA AVE, 200' SOUTH OF ORANGE WAY PHASE 4 PLACE ON WEST SIDE OF SIERRA AVE. 200' NORTH OF UPLAND AVE w Q Q V z w C7 END DETOUR r r DH1000 ADDCO. DETOUR CONSTRUCTION DETOUR DELAYS AHEAD C5 (R) USE MANGO RIGHT LANE a M U S T •`•` ROAD SEE NOTE ABOVE TURN RIGHT •': • CONSTitUCnON RIGHT RIGHTLANE z 9 v 150' 50' 0 R1 C5 to STOP DETOUR PHASE 3 (EXISTING) 4 WAY STOP RI W17 (STOP STOP v Imm NOTES: TAPER 150' 1501 150' -�1�- • 225' ROAD CONSMUC ION RIGHT LANE RIGHT LANE ,: •• CLOSED CLOSED AHEAD CR1Cl81 �� 020 (R) AHEAD �p (R) ••` RLCA RLCJ1 Rl STOP R1 STOP (EXISTING) ALL TRAFFIC CONTROL TO BE IN ACCORDANCE WITH "STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS." USE FLASHING ARROW BOARD OR HIGH RISE SIGN FOR ALL LANE CLOSURES. ALL CONES TO BE 28 SPACE 30` MAXIMUM ON TAPERS AND 60' MAXIMUM ON TANGENTS. BARRICADES LEFT OVERNIGHT TO HAVE REFLECTIVE TAPE AND FLASHING LIGHTS. S V U BUFFER P 150' RIGHT LANE MUST � TURN RIGHT U C18 W= C20 (R) U DETOUR C5 (R) WORKING HOURS FROM 7:00 AM TO 3:30 PM. FOR PKG. LANE, WORKING HOURS FROM 9:00 AM TO 3:30 PM. FOR TRAFFIC LANE. CLOSURE. MAINTAIN SAFE PASSAGE FOR PEDESTRIANS AND BICYCLES AT ALL TIMES. MAINTAIN DRIVEWAY ACCESS AT ALL TIMES. USE FLAGMEN WHEN NECESSARY TO KEEP TRAFFIC FLOWING. POST TEMPORARY NO PKG. SIGNS 24 HRS. IN ADVANCE WHERE REQUIRED. CHECK WITH TRAFFIC ENGINEER REGARDING TRAFFIC SIGNALS. ALL WORK, MATERIALS AND EQUIPMENT FOR TRAFFIC SIGNING AND STRIPING SHALL CONFORM TO THESE PLANS AND THE STANDARDS AND SPECIFICATIONS FOR THE CITY OF FONTANA AND THE STANDARDS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATION SHEETS. SIGN CODES SHOWN HEREON ARE TO CONFORM TO CALTRANS SPECIFICATION SHEET CODES. TRAFFIC SIGN SIZE SHALL BE STANDARD UNLESS OTHERWISE INDICATED ON PLANS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL AT ALL TIMES. REMOVAL OF ALL SIGNS AND LEGEND'S SHALL BE COORDINATED WITH THE CITY OF FONTANA TRAFFIC SECTION. STOP SIGN AND LEGENDS WILL BE REMOVED ONLY BY CITY FORCES. FIVE (5) DAYS ADVANCE WRITTEN NOTICE TO THE CITY TRAFFIC SECTION IS REQUIRED TO COORDINATE WORK WITH CITY FORCES. EXACT LOCATION OF ALL EQUIPMENT AND CONTROL DEVICES TO BE DETERMINED BY THE ENGINEER. ADDITIONAL WARNING AND/OR CONSTRUCTION SIGNS MAY BE REQUIRED BY THE ENGINEER. PHASE 4 ROAD CONSTRUCTION AHEAD C18 RCA 0 u� C30 C5 (L)(L) LANE CLOSED TO YAWGO PLACE ON TYPE III BARRICADES SIERRA AVE. NO TURN ON RED R13 V v� .491 L<CLOSED C5 (R) NO TURN DETOUR RED R13 i�tANGo o PLACE ON TYPE III BARRICADES In ROAD CONSTRUCTION AHEAD C18 RCA PHASE 3 MANGO AVE. S03 QI�R DH1000 ADDCO. CONSTRUCTION PHASE 1 & 2 DELAYS AHEAD PHASE 1 PLACE ON EAST SIDE OF SIERRA AVE, 200' SOUTH OF CERES AVE. USE ALT RTE. PHASE 2 PLACE ON WEST SIDE OF SIERRA AVE, 200' NORTH OF ARROW BLVD C7 END DETOUR T • • • TAPER BUFFER 150' 150' 150' 225' S0' 150' 1 RIGHT LANE 61HM M U S T RIGHT LANE RIGHT LANE TURN RIGHT CLOSED CLOSED AHEAD AHEADle C18 CA C20 (R) C20 (R) RLCA RLCA C5 (R) C5 (L) DETOUR PHASE 1 Cs (.) NUEVO AVE. ROM OON15=C110N RIGHT LANE RIGHT LANE CLOSED CLOSED ANEAo ogle AHEAD C20 (R) 020 AHEAD(R) RLCA 180' 1 SO' 1 SO' C5 (L) *=I PHASE 1 C5 (L) P<DEOURE 2 DRAWN BY. D HERNANDEZ (310) 428-8141 Ao S C A I_ 20 40 60 62220106 2I 7 (v C5 (R) W a DETOUR a U Z C18 J RIGHT LANE M U S T •`•` ROAD TURN RIGHT •': • CONSTitUCnON RIGHT RIGHTLANE AHEAD �� �� C. RCA C20 (R) �LCOA(R) v 150' 50' RLCA 225' 150' 150' 130' BUFFER TAPER .A - C7 END DETOUR > CABLE & CONDUIT CONMMN IL0131 1tmI4 amoom OMNI% DRAWN BY. D HERNANDEZ (310) 428-8141 Ao S C A I_ 20 40 60 62220106 2I 7 (v