HomeMy WebLinkAbout2108A-17EA 38310 K TOTAL PROJECT NO. SHEE PHASE 1 08. Sl3d. 66 R 15.61 /R 15.86 J 7 23 1. PRIOR TO STARTING ROAD WIDENING, SAWCUT /# W-W;30�� WITH TEMPORARY PAVEMENT PATCH. "B SCALE 1"=100' DETAIL A DETAIL REGISTERED CIVIL ENGINEER NTS NTS 7— 2� DAVID M. McGLASSON CXD S APPROVAL DATE REMOVE REPLACE CIVIL EXIST. ISLAND NOSE AND WITH TEMPORARY PAVEMENT PATCH REMOVE EXIST. ISLAND REQUIRED SIGNS HEA <;C DETAIL A NOSE AND REPLACE DETAIL B DETAIL "C DETAIL "D" & SPACING FOR "'I C18 N TS N TS REQUIRED SIGNS SPACING PER WITH TEMPORARY PAVEMENT PATCH ADVANCE WARNING PER STD. PLAN T 11 GENERAL NOTES: STD. PLAN T 11 1 ALL TRAFFIC CONTROL WORK AND DEVICES FOR CON— 4 ........................... .......... ............ ......... ........... ........ .......... .... ... ............. . ................ vi ...... . ......... ................. . ..... . ........ ......................... ......... ................ - SPECIFICATIONS AND STANDARD PLANS LATEST ALL WORK AREAS SHALL BE COMPLETELY CONED AND/OR DELINEATED AND/OR BARRICADED PER CAL TRANS REGULATIONS. .1 Hil 3. ALL ADVANCE WARNING SIGNS SHALL BE ILLUMINATED. ALL OTHER SIGNS SHALL BE EITHER REFLECTORIZED OR OA < ONSTRUCM HEA 4. TEMPORARY TRAFFIC CONTROL STRIPING SHALL BE DONE C08 FOOTHILL BLVD. DURING THE TIME WHEN THE LEAST AMOUNT OF TRAFFIC IS EXPECTED. ..f (S.R. 66) 5. THE CONTRACTOR SHALL INSTALL CONSTRUCTION AREA LEGEND SIGNS THAT WILL PROVIDE CONSTRUCTION DURATION INFORMATION AT LEAST 7 WORKING DAYS PRIOR TO THE k. DIRECTION OF TRAVEL START OF CONSTRUCTION. PHASE 1 6. TEMPORARY LANE LINES AND/OR CENTERLINE SHALL EXISTING ISLAND NOSE REMOVAL CONSIST OF REFLECTORIZED LINES APPROXIMATELY 24 INCHES LONG AND 41) WIDE, SPACED APPROXIMATELY 24 FEET APART. DAY/NIGHT REFLECTORIZED RAISED PAVEMENT MARKERS APPROVED BY CALTRANS, MAY BE USED, SPACED APPROXIMATELY 24 FEET APART IN LIEU OF 24 INCH LINES. PHASE 2 c-4 7 — — — — — 7. CONSTRUCTION TRUCK TRAFFIC MERGING INTO TRAFFIC 1. TRANSITION THE TWO EAST BOUND LANES NORTHWARD. �,�4 �14 ��_ -.0— LANES SHALL BE BY USE OF FLAGGER AND APPROPRI — RESTRIPE LANES PER DIMENSIONS SHOWN IN DETAILS "A", t)B)) ')C)t AND ))D)). ATE SIGNAGE AS DIRECTED BY THE ENGINEER, OR 2. MODIFY THE SOUTHERN MOST WEST BOUND AND NORTHERN MOST EAST BOUND LANES TO BECOME A THROUGH/LEFT TURN LANE AT THE INTERSECTIONS. DETAIL "A" DETAIL "B" STRUCTION REDUCES THE ROADWAY TO A SINGLE THROUGH SCALE 1 100, TEMPORARY TRAFFIC NTS NTS LANE OR WHERE THROUGH TRAFFIC MUST STOP FOR CONTROL STRIPING PER EQUIPMENT MOVEMENT, 8. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL REQUIRED SIGNS TAPER LENGTH AND "A" "B DETAIL "C DETAIL "D CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATION & SPACING PER SPACING PER STD. PLAN T 11 STD. PLAN T 11 DETAIL DETAIL c'_4 C"4 SHEETS. 9. A MINIMUM 12' TRAVEL LANE AND EMERGENCY ACCESS SHALL BE MAINTAINED AT ALL TIMES. . .... NTS NTS 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER , - -,,; L7 -z TRAFFIC CONTROL AT ALL TIMES. e. 11110 MASK OR BAG ALL CONFLICTING SIGNS, AND/OR ALL REQUIRED SIGNS CONFLICTING STRIPING. PAVEMENT MARKINGS SHALL & SPACING FOR BE REMOVED FROM THE PAVEMENT BY SAND ADVANCE WARNING TYPE 11 TYPE 11 BLASTING BY THE CONTRACTOR. PER STD. PLAN T 11 OA BARRICADE PER CAL TRANS STD.s FOOTHILL BLVD. BARRICADE PER e, END CAL TRANS STD.s ICONSTRUCTIOJ 12. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR IGHT LM ONSTRUCTIO don C20 (Rt.) SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES HEA E (SeR, 66) Cl 3 AND OTHER TRAFFIC CONTROL DEVICES TO THEIR ORIGINAL CONDITION, OR TO THE SATISFACTION OF C18 35 W6 (35) LEGEND THE ENGINEER. TRAFFIC CONE 13. REMOVAL OF ALL SIGNS AND LEGENDS SHALL BE < PHASE 2 PORTABLE SIGN COORDINATED WITH THE CITY OF FONTANA TRAFFIC DIRECTION OF TRAVEL SECTION. STOP SIGN AND LEGENDS WILL BE REMOVED ONLY BY CITY FORCES. FIVE (5) DAYS ADVANCE SOUTH SIDE WIDENING WORK AREA WRITTEN NOTICE TO THE CITY TRAFFIC SECTION IS REQUIRED TO COORDINATE WORK WITH CITY FORCES. z 0 (909) 350-6600 PHASE 2A C--4 14. EXACT LOCATION OF ALL EQUIPMENT AND CONTRCt CD 1. TEMPORARY LANE CLOSURE OF 7 DEVICES TO BE DETERMINED BY THE CITY OR CALTRANS Ld -C--4 ENGINEER. ADDITIONAL WARNING AND/OR CONSTRUCTION SOUTHERLY MOST EAST BOUND LANE TAPER LENGTH AND - - - - - - - SIGNS MAY BE REQUIRED BY THE CITY OR CALTRANS FOR ADDITIONAL OVERLAY FROM STA 767+50 SPACING PER ENGINEER. TO 771+00. SEE CROSS SECTIONS SHT. 8 OF DETAIL "A" DETAIL "B < 23 FOR ADDITIONAL INFORMATION. -E)- SCALE 1 100, NTS NTS > REQUIRED SIGNS TAPER LENGTH AND TEMPORARY TRAFFIC DETAIL "C DETAIL "D STD. PLAN T 11 STD. PLAN T 11 DETAIL '13 NOTE 6 cl-4 C-li Z_ C-4 C11-4 Prepared By. ol 00 NTS NTS CITY OF FONTANA, CALIFORNIA ol PUBLIC WORKS DEPARTMENT REQUIRED SIGNS ol DRAWN BY: WAL —MART REDEVELOPMENT CENTER DATE: /8194 7, & SPACING FOR LEGEND Lo ADVANCE WARNING TYPE 11 BARRICADE PER TYPE 11 TRAFFIC CONE ici DESIGNED BY: 71 FOOTHILL BLVD. BARRICADE PER FOOTHILL BLVD, (S.R. 66) CD z OA PER STD. PLAN T 11 CAL TRANS STD.s (SeRe 66) EN ICONSTR 4 PORTABLE SIGN Ms ANGO AVL TO PALMETTO A 17 ONSTRUCTIO URD C20 (Rt.) HEA "I . : Cl 3 DIRECTION OF TRAVEL CHECKED BY: 23 EA PHASE 2A .. WORK AREA DMcG TRAFFIC CONTROL PLAN OF SHEETS 0 C18 35 W6 (3 5) MPH SOUTH SIDE WIDENING 9K 2108— A EA 38310 K