HomeMy WebLinkAbout2108-1STREET IMPROVEMENT PLANS
GENERAL NOTES
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS AND THE CITY
FONTANA PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS DATED
1975s AND ANY REVISION THERAFTER.
2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA
PUBLIC WORKS DEPARTMENT PRIOR TO THE START OF ANY WORK WITHIN THE
CITY LIMITS.
3. STATIONING REFERS TO THE CENTERLINE OF THE STREET EXCEPT WHERE
OTHERWISE NOTED.
4. CURVE DATA REFERS TO THE FACE OF THE -CURB.
5. ALL EXPOSED CONCRETE SHALL CONFORM IN GRADE, COLOR AND FINISH TO
ALL ADJOINING CURBS AND SIDEWALKS.
CITY OF FONTANA
STREET IMPROVEMENT PLANS
6. ACTUAL THICKNESS OF A. C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR
STRUCTURAL STREET SECTION SHALL BE RECOMMENDED BY A GEOTECHNICALMANGO
ENGINEERING REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR AVE.,
APPROVAL UPON COMPLETION OF ROUGH GRADING.
7. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO
REVISION AND APPROVAL OF THE CITY AS REQUIRED BY SOIL TESTS TAKEN
AFTER COMPLETION OF ROUGH GRADING.
8. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES AND SWALES FROM
UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE
CITY ENGINEERING DEPARTMENT MAY REQUIRE TEMPORARY GUNITE SWALES,
ENTERING OR LEAVING IMPROVEMENTS.
9. ALL UNDERGROUND WORK SHALL BE COMPLETED PRIOR TO PAVING OF THE VVAI�IIIIII
STREETS.
10. ADEQUATE CONTROL STAKING SHALL BE SET BY THE ENGINEER TO ENABLE. THE
CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. FOR TOP OF
CURB PROFILES ON GRADES LESS THAN 0.40%, GRADE STAKES SHALL BE SET
ON 12 1/2 CENTERS.
11. ALL PIPES OR SUBSTRUCTURES OF ANY KIND AND ALL TELEPHONE OR POWER
POLES, WATER METERS, VALVES, HYDRANTS, IRRIGATION STRUCTURES, ETC.
SHOWN OR NOT SHOWN ON THIS PLAN AND LOCATED WITHIN AREAS TO BE
IMPROVED AND INTERFERING WITH CONSTRUCTION, SHALL BE RELOCATED BY
OTHERS IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY ALL
OF THE AGENCIES CONCERNED BEFORE CONSTRUCTION BEGINS.
12. ALL MANHOLE AND CLEANOUT FRAMES AND COVERS SHALL BE CONSTRUCTED 6"
BELOW FINISHED GRADE BY SEWER CONTRACTOR AND SHALL BE RAISED TO
GRADE BY PAVING CONTRACTOR AFTER COMPLETION OF PAVING.
13 ALL VALVE CANS AND COVERS SHALL BE CONSTRUCTED 6" BELOW FINISHED
FOR
FOOTHILL BLVD.
-DIEVE. OP EEN
MART R[Ew: L� KA T CEEN [ER
(NOTE: PERMIT REQUIRED FROM' CALTRANS FOR WORK ON FOOTHILL BLVD.)
FOOTHILL BOULEVARD
DEMOLITION- 2= 3
IMPROVEMENTS- .5- 6
s. T. u a V. CIL LOT sec CROSS-SECTIONS- 10- 11
STRIPING & SIGNAGE- -14 T. L. a. C 0. L O T 5 2 0 w a 1 1 1 e
I ZONING C-4 I ! I-. ZONING C-42112! Alft imam
!
a� Lim too � � �
�ta4a� ��saae�aaa-"ml��aa�_���vraa�.a asr�� �- .
•
FOOTHILL BLVD. : .
9+17.91 - LIMITS OF WORK
9+18 -LIMITS OF WORK � .{.. __ _ __ __.-.._______�__ -- -- - -- -------I-�
< ON PALMETTO AVENUE
GRADE BY WATER CONTRACTOR AND SHALL BE RAISED TO GRADE BY PAVING ON MANGO AVENUE
CONTRACTOR AFTER COMPLETION OF PAVING.
1.
'
21
-29-.--1T- -SHALE- -BE- SHE-RESPON-SIBItITY-CSF-TH-E -COt+TRACTOfR- TO-- NOTfF�THE-
j
DATED JANUARY, 1975.
14. REFER TO THE CITY OF FONTANA, UNDERGROUND UTILITY . LOCATION STANDARD
BASED ON THE TRAFFIC STUDY BY ROBERT KAHN AND ASSOCIATES, DATED
II
-PAVIN-HASBEEN - NSTALL-E-D-SQ THkT-THE--E-NfINEER--MAY-fNSTALi_-T
DETAIL 129.
JULY 19, 1991, AND THE BSI CONSULTANTS, INC., TRAFFIC SIGNAL
II
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES AND/OR
15. THE CONTRACTOR(S) SHALL COORDINATE CONSTRUCTION WITH ALL UTILITIES
COORDINATION AND TIMING STUDY OF JULY 25TH, 1991, THE FOLLOWING
II
_STREEEF-CENTERLINE-MONi}bFEhN-�r -AS -REQUIRES.-BYTHE-CIW- CGDE -OF T -HE-
AND OTHER IMPROVEMENTS INCLUDING, BUT NOT LIMITED TO, GAS,
THE EXISTING SIGNALIZATION MAST ARMS, MASTS,AND SIGNAL
N
OR NOT THEY ARE SHOWN ON THESE PLANS AND SHALL REMOVE, REPAIR
TELEPHONE, ELECTRICAL, LIGHTING, TELEVISION CABLE, LANDSCAPING,
z
N
LICENSE OR THE FOLLOWING
LANDSCAPING IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER,
o
II '
1. FOOTHILL BOULEVARD WILL PROVIDE THE PRIMARY ACCESS TO THE
THIS ROADWAY. IMPROVEMENT PACKAGE. THE CONTRACTOR IS
AND C-32.
N
SUBJECT SITE. ROADWAY WIDENING, AND THE CONSTRUCTION OF THE
STORM DRAINAGE, FLOOD CONTROL SYSTEMS, ETC.
N
II
W
r
16.- AS BUILT DRAWINGS SHALL BE PROIDED BY THE ENGINEER TO THE CITY OF
31. STATE HIGHWAY LANE CLOSURES SHALL CONFORM TO
N
DOES NOT IMPACT EAST -OR WEST BOUND TRAFFIC SIMULTANEOUSLY.
�°!W
FONTANA.
T-11 FOR SPECIFIED TIMES OUTLINED ON THE ENROACHMENT PERMIT.
N
tl
>
17. TYPE LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS WILL BE W N I z o uj
N
CONSTRUCTION PHASES.
THE PROJECT PROGRESSES. THIS WILL BE ADDITIONAL WORK TO THE
DETERMINED AT THE TIME OF THE CONSTRUCTION AND SHALL CONFORM WITH THE z
Womcn-AlWNCITY OF FONTANA STANDARD DETAILS.
°°
II
18. CONTRACTOR IS INSTRUCTED TO REFER TO THESE PLANS AND THE
SOUTHERN CALIFORNIA GAS CO.
THE CURB RETURNS AT MANGO AND PALMETTO AVENUES TO PROTECT
4. MANGO AVENUE ROADWAY IMPROVEMENTS AND/OR WIDENINGS ARE TO BE
SPECIFICATIONS, AND WHERE THERE IS OR MAY BE A CONFLICT .TO THE
16231 VALLEY BLVD.
EXISTING SIGNALIZATION EQUIPMENT. SEE NOTE #3 BELOW.
,
OWNER'S REPRESENTATIVE.
F6231 CALIFORNIA 92335
II
IMPROVEMENT IS CONTINGENT ON THE RELOCATION OF THE ADJACENT
19. STERILANT REQUIRED UNDER ALL A. C. PAVEMENT.
ATTN: LOU ' WESTFALL
THE CENTER MEDIAN IMPROVEMENT WILL STOP SHORT OF REMOVING THE
0
20. NO CONCRETE SHALL BE PLACED UNTIL FORMS AND REINFORCING STEEL HAVE
N
EXISTING MEDIAN ISLANDS AND SIGNALIZATION EQUIPMENT AT MANGO AND
Z
BEEN PLACED, INSPECTED AND APPROVED.
"
II
II
I
21. ALL UTILITY COMPANIES SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO WORK
13
TURE.
RATION EQUIPMENT WILL MODIFIED BY OTHERS IN THE FU.
5 PALMETTO AVENUE ROADWAY IMPROVEMENT AND/OR WIDENING ARE TO BE
AROUND THEIR FACILITIES.
22. ALL BACKFILL COMPACTION TO BE CERTIFIED BY SOILS ENGINEER.
23. ALL MATERIALS AND METHODS TO BE SUBJECT TO THE APPROVAL OF THE
CITY ENGINEER.
24. BACKFILL MATERIALS SHALL BE VERIFIED BY CONTRACTOR AND APPROVED BY
PUBLICWORKS INSPECTOR PRIOR TO THE PLACING OF ANY PERMANENT
PAVEMENT.
25. CONTRACTOR TO INSTALL PAVEMENT MARKINGS AND STRIPING AS REQUIRED
BY THE CITY ENGINEER.
26. CONTRACTOR SHALL NOT OPERATE ANY MAIN LINE WATER VALVE.
27. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE
PROPOSED IMPROVEMENTS, WORK SHALL STOP AND THE ENGINEER NOTIFIED
IMMEDIATELY.
28. IT SHALL BE THE RESPONSIBILTY OF THE CONTRACTOR TO NOTIFY THE
ENGINEER AFTER THE BASE COURSE HAS BEEN CONSTRUCTED AND BEFORE THE
PAVING HAS BEEN INSTALLED SO THAT THE ENGINEER MAY INSTALL THE
STREET CENTERLINE MONUMENTS AS REQUIRED BY THE CITY CODE OF THE
CITY OF FONTANA
ttitttHIf
I
CEL 4 PARCEL 3
-41 -Al
ki
at 1-1-.1.J - L -L -1_.1-J
rw
PROPOSED
Lill
RETAIL SHOP *If vZornitt / paa
Area= 7.308 sf Garden Center ( P do
01
o M �
N r
01 V_t
I0-
N W
z r z0ai
z N
00m(/)
�oo�a
baa.
PROPOSED W
WAL MART
RL -114 -CGL -OL "
❑ I a' z
Cog
� U
M: B, if/f2NOF
a
N
------- - - - - - - - - - --
------- j I
y
i
PROPOSED z
RETAIL SHOP 'A
Area= 24.430 sq. fL (GROSS)
T
SITE PLAN/INDEX PLAN
SCALE: N.T.S.
ATTN.- DAVID JONES RANCHO CUCAMONGA, CA. 9173€
(714) 820-5191 (714) 945-3562
PACIFIC BELL
3939 E. CORONADO STREET
ANAHEIM, CALIFORNIA 92807
(714) 999-5639
Underground Service Alert
CaLLJOLL FREE
10,800
X122-4133
GENERAL NOTES
1.
ROADWAY IMPROVEMENT SEQUENCING:
21
-29-.--1T- -SHALE- -BE- SHE-RESPON-SIBItITY-CSF-TH-E -COt+TRACTOfR- TO-- NOTfF�THE-
j
DATED JANUARY, 1975.
-ENGINEER-AfTE-RT+IE---BASE-C-OURS-E-HAS--BEEN-C-ONST-RUCTED-AND---BE ORE T -HE
BASED ON THE TRAFFIC STUDY BY ROBERT KAHN AND ASSOCIATES, DATED
3. SIGNALIZATION IMPROVEMENTS FOR MANGO AND PALMETTO
-PAVIN-HASBEEN - NSTALL-E-D-SQ THkT-THE--E-NfINEER--MAY-fNSTALi_-T
4E-
JULY 19, 1991, AND THE BSI CONSULTANTS, INC., TRAFFIC SIGNAL
AVENUES, AT THEIR INTERSECTION WITH FOOTHILL BOULEVARD,
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES AND/OR
MUNICIPAL
COORDINATION AND TIMING STUDY OF JULY 25TH, 1991, THE FOLLOWING
ARE SCHEDULED IN THE FUTURE BY OTHERS. IN THE INTERIM,
_STREEEF-CENTERLINE-MONi}bFEhN-�r -AS -REQUIRES.-BYTHE-CIW- CGDE -OF T -HE-
ROADWAY IMPROVEMENT CONSTRUCTION SEQUENCING HAS BEEN
THE EXISTING SIGNALIZATION MAST ARMS, MASTS,AND SIGNAL
--Ci1-0E-OFF�}N.FANA -
OR NOT THEY ARE SHOWN ON THESE PLANS AND SHALL REMOVE, REPAIR
ESTABLISHED:
METER EQUIPMENT INSIDE THE EXISTING CURB RETURNS ARE TO
30. THE CONTRACTOR SHALL POSSESS EITHER A CLASS A
LICENSE OR THE FOLLOWING
101
BE PROTECTED FROM DAMAGE DURING CONSTRUCTION SHOWN IN
CLASS C LICENSES AT THE TIME THIS CONTRACT IS AWARDED CLASS C-10, C-8,
1. FOOTHILL BOULEVARD WILL PROVIDE THE PRIMARY ACCESS TO THE
THIS ROADWAY. IMPROVEMENT PACKAGE. THE CONTRACTOR IS
AND C-32.
_GL
SUBJECT SITE. ROADWAY WIDENING, AND THE CONSTRUCTION OF THE
TO NOTE THAT THE PLANS DENOTE THE EXISTING CURB RETURNS
w
\J�o�`
CENTER LEFT TURN MEDIANS ARE TO BE SCHEDULED IN A MANNER THAT
ARE TO BE LEFT IN PLACE TO PROTECT THE BEFORE MENTIONED
31. STATE HIGHWAY LANE CLOSURES SHALL CONFORM TO
CALTRANS STANDARD PLAN
DOES NOT IMPACT EAST -OR WEST BOUND TRAFFIC SIMULTANEOUSLY.
SIGNALIZATION EQUIPMENT. THE CONTRACTOR WILL BE PROVIDED WITH
T-11 FOR SPECIFIED TIMES OUTLINED ON THE ENROACHMENT PERMIT.
THESE TWO IMPROVEMENTS ARE TO SCHEDULED IN TWO SEPARATE.
INFORMATION ON ADDITIONAL UNDERGROUND CONDUIT REQUIREMENTS AS
FONTANA NOT TO SCALE
CONSTRUCTION PHASES.
THE PROJECT PROGRESSES. THIS WILL BE ADDITIONAL WORK TO THE
UTIUTIY NOTIFICATIONS:
CONTRACT.
EXISTING
ROADWAY WIDENING ALONG THE SOUTH CURBLINE WILL STOP SHORT OF
WATER: SAN GABRIEL VALLEY WATER COMPANY GAS:
SOUTHERN CALIFORNIA GAS CO.
THE CURB RETURNS AT MANGO AND PALMETTO AVENUES TO PROTECT
4. MANGO AVENUE ROADWAY IMPROVEMENTS AND/OR WIDENINGS ARE TO BE
11142 GARVEY AVENUE
11
16231 VALLEY BLVD.
EXISTING SIGNALIZATION EQUIPMENT. SEE NOTE #3 BELOW.
CONSTRUCTED TO CITY STANDARDS. SCHEDULING COMPLETION OF THIS
MONTCALIFORNIA 91734
F6231 CALIFORNIA 92335
IMPROVEMENT IS CONTINGENT ON THE RELOCATION OF THE ADJACENT
13) 448-6183
ATTN: LOU ' WESTFALL
THE CENTER MEDIAN IMPROVEMENT WILL STOP SHORT OF REMOVING THE
POWER POLES BEHIND THE NEW WIDENED EAST CURBLINE. THIS WORK IS
4!' S---
(714) 889-9711
EXISTING MEDIAN ISLANDS AND SIGNALIZATION EQUIPMENT AT MANGO AND
INDEPENDENT OF FOOTHILL BOULEVARD IMPROVEMENTS.
SEWER: CITY OF FONTANA
- T V
S
PALMETTO AVENUES. THESE EXISTING MEDIAN ISLANDS AND
PPALMS
TELFVISION
8353 SIERRA AVENUE
SOUTHERN CALIFORNIA GAS CO.
TURE.
RATION EQUIPMENT WILL MODIFIED BY OTHERS IN THE FU.
5 PALMETTO AVENUE ROADWAY IMPROVEMENT AND/OR WIDENING ARE TO BE
FONTANA, CALIFORNIA 92335
TRANSMISSION DIVISION
CONSTRUCTED TO CITY STANDARDS. SCHEDULING COMPLETION OF THE
(714) 350-7640
2191 E. BIRCH STREET
2. SIGNALIZATION IMPROVEMENTS FOR THE MID -BLOCK ENTRANCE FROM
NEW WIDENED WEST CURBLINE IMPROVEMENT IS INDEPENDENT OF
POWER SOUTHERN CALIFORNIA EDISON CO.
BREA, CALIFORNIA 9EET
BREA 5ALIFOR 9
FOOTHILL BOULEVARD WILL BE A PART OF ANOTHER CONTRACT. THE
FOOTHILL BOULEVARD IMPROVEMENTS.
CONTRACTOR WILL BE PROVIDED WITH INFORMATION ON ADDITIONAL
P.O. BOX 788
UNDERGROUND CONDUIT REQUIREMENTS AS THE PROJECT PROGRESSES.
300 N. PEPPER STREET TELEPHONE:
GENERAL TELEPHONE
THIS WILL BE ADDITIONAL WORK TO THE CONTRACT.
RIALTO CALIFORNIA 92376
9000 HELLMAN AVE.
ATTN.- DAVID JONES RANCHO CUCAMONGA, CA. 9173€
(714) 820-5191 (714) 945-3562
PACIFIC BELL
3939 E. CORONADO STREET
ANAHEIM, CALIFORNIA 92807
(714) 999-5639
Underground Service Alert
CaLLJOLL FREE
10,800
X122-4133
GENERAL NOTES
1.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS AND
21
THE STANDARD SPECIFICATION AND DRAWINGS OF THE CITY OF FONTANA,
j
DATED JANUARY, 1975.
2.
ALL EARTHWORK WITHIN . THE RIGHT--OF--WAY SHALL CONFORM TO SECTION
PROPOSED EXISTING DESCRIPTION
19 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA,
@p
DEPARTMENT OF TRANSPORTATION, DATED JANUARY, 1988.
3.
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES AND/OR
MUNICIPAL
IRRIGATION PIPES AND STRUCTURES WERE TAKEN FROM AVAILABLE
AIRPORT
RECORDS AND BY FIELD INSPECTION. THE CONTRACTOR SHALL ASSUME
Site
RESPONSIBILITY FOR ANY ENCOUNTER WITH SAID FACILITIES WHETHER
.�
OR NOT THEY ARE SHOWN ON THESE PLANS AND SHALL REMOVE, REPAIR
66
OR REPLACE AND SAVE AT THE DIRECTION OF THE CITY ENGINEER.
4.
CONSTRUCTION PERMIT SHALL , BE OBTAINED FROM THE FONTANA PUBLIC
101
WORKS DEPARTMENT PRIOR TO THE START OF ANY WORK.
5.
MANHOLE FRAMES AND COVERS - SHALL BE CONSTRUCTED TO WITHIN 6"
CITY STREET LIGHTS CAPPED RISER
OF FINISHED PVMT..GRADE BY THE SEWER CONTRACTOR AND THEN RAISED
_GL
TO GRADE AFTER FINISHED PAVING BY THE PAVING CONTRACTOR.
�
a 1
w
SHEET INDEX
SHEET # DESCRIPTION
1 STREET IMPROVEMENT PLANS COVER SHEET
2 DEMOLITION PLAN - MANGO AVENUE &
WEST FOOTHILL BOULEVARD
.3 DEMOLITION PLAN - EAST FOOTHILL BOULEVARD
& PALMETTO AVENUE
�4 STREET IMPROVEMENTS - MANGO AVENUE
5 HIGHWAY IMPROVEMENTS - WEST FOOTHILL BLVD.
6 HIGHWAY IMPROVEMENTS - EAST FOOTHILL BLVD.
.7 STREET IMPROVEMENTS - PALMETTO AVENUE
8 TYPICAL SECTIONS AND DETAILS
9 ROADWAY CROSS SECTIONS - MANGO AVENUE
10 ROADWAY CROSS SECTIONS - WEST FOOTHILL BLVD.
11 ROADWAY CROSS SECTIONS - EAST FOOTHILL BLVD.
12 ROADWAY CROSS SECTIONS - PALMETTO AVENUE
13 STRIPING & SIGNAGE - MANGO AVE. & PALMETTO BLVD.
14. STRIPING & SIGNAGE - FOOTHILL BLVD.
15A CONDUIT PLAID - FOOTHILL BLVD.
5B SIGNS,STRIPING & MARKINGS SUMMARY
16 'SANITARY SEWER PLAN TITLE SHEET
17 SANITARY SEWER - MANGO AVENUE (WEST)
18 SANITARY SEWER - PALMETTO AVENUE (EAST)
19 CITY STANDARD DETAILS
SYMBOLS -LEGEND
21
j
Ul
R� W Q
EXISTING
DESCRIPTION
PROPOSED EXISTING DESCRIPTION
15 W In
� N
J
@p
3
RIALTO
MUNICIPAL
BASE LINE RD.
AIRPORT
Site
FIRE HYDRANTS
.�
'FOOTHILL BLVD
66
POWER POLES
101
721
BACKFLOW
I I POST INDICATOR ALVE AND
ARROW BLVD
CITY STREET LIGHTS CAPPED RISER
_GL
Q
�
a 1
w
\J�o�`
VALLEY BLVD
� P _
>
- 10Jc
-.
CATCH BASIN
Q � o
z
w.
VICINITY MAP
FONTANA NOT TO SCALE
SHEET INDEX
SHEET # DESCRIPTION
1 STREET IMPROVEMENT PLANS COVER SHEET
2 DEMOLITION PLAN - MANGO AVENUE &
WEST FOOTHILL BOULEVARD
.3 DEMOLITION PLAN - EAST FOOTHILL BOULEVARD
& PALMETTO AVENUE
�4 STREET IMPROVEMENTS - MANGO AVENUE
5 HIGHWAY IMPROVEMENTS - WEST FOOTHILL BLVD.
6 HIGHWAY IMPROVEMENTS - EAST FOOTHILL BLVD.
.7 STREET IMPROVEMENTS - PALMETTO AVENUE
8 TYPICAL SECTIONS AND DETAILS
9 ROADWAY CROSS SECTIONS - MANGO AVENUE
10 ROADWAY CROSS SECTIONS - WEST FOOTHILL BLVD.
11 ROADWAY CROSS SECTIONS - EAST FOOTHILL BLVD.
12 ROADWAY CROSS SECTIONS - PALMETTO AVENUE
13 STRIPING & SIGNAGE - MANGO AVE. & PALMETTO BLVD.
14. STRIPING & SIGNAGE - FOOTHILL BLVD.
15A CONDUIT PLAID - FOOTHILL BLVD.
5B SIGNS,STRIPING & MARKINGS SUMMARY
16 'SANITARY SEWER PLAN TITLE SHEET
17 SANITARY SEWER - MANGO AVENUE (WEST)
18 SANITARY SEWER - PALMETTO AVENUE (EAST)
19 CITY STANDARD DETAILS
SYMBOLS -LEGEND
j
EXISTING
DESCRIPTION
PROPOSED EXISTING DESCRIPTION
PROPOSED
@p
MANHOLES
0-*
�! AN
MANHOLES0
T
T
FIRE HYDRANTS
Q CLEANOUT
Q
POWER POLES
101
VALVES
BACKFLOW
I I POST INDICATOR ALVE AND
CITY STREET LIGHTS CAPPED RISER
_GL
SIGN
o M
METER
s M
o CB
CATCH BASIN
o V
VAULT
■ V
TRAFFIC SIGNAL
UNDERGROUND UTILITIES
EXISTING
PROPOSED
- ~
WATER ®•.•
6!W i
- 3"6
--
GAS
r
-- E
ELECTRICAL
E ------
4"S
SANITARY SEWER
4!' S---
T
--
TELEPHONE
T_
- T V
- - -
TELFVISION
TV -�
==8"SD===--=====STORM
DRAIN
87S
■
,_m
I