Loading...
HomeMy WebLinkAbout2091-A-T-4SIGNS R18 RIGHT LANE MUST TURN RIGHT R26(S) NO STOPPING ANYTIME R41 RIGHT TURN ONLY R63 DO NOT PASS wi 1 PAVEMENT WIDTH TRANSITION W75 LANE ENDS MERGE LEFT LEGENDS Ir EXISTING SIGN NEW SIGN FOOTHILL B LVD — EX R/Of F.O.C. (FUT) qt — — — — — — — — — — — — — — — — — — — — — — — — — — — — -- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — --- — — — — — — — --- — — — — — -- — — — — — — — — — — — — — — — — — — — — -- — — — — — — - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- - - - - - - - - - - — - - - - - - *� - - - - - - - - - - - - - - - - - - - - - - - * =-:e� N EX. EDGE UNE ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- -A ---------- N - - - - - - - - - - - - - --- -- - - - - - - - - - - - - - - - - - ---- -- ---- -- -- - - - - - - - - - - - - - - - - - ---- - - - - - - - - - - - - - - - - - ---- -- -- - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 - - - - - - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - — - - - - - - -------------- --------------------------------------------- ------------------- --------------------------------------------- --------------------- r.7 - x - r.: --- ------------------------------------ ------------------------------------------ N 8 ---- ---- ---- ---- ---- ------ ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---- ---------- 9 *cq 275 R26(S) ------ — ----- EX. R/W, R26(S) R26(S) R26(S *Rl 8-2 �o R26— +b R, "r) 1-,,- 9 DURING STAGE III w R41 DURING STAGE 111---j CONSTRUCTION DURING STAGE III CONSTRUCTION CONSTRUCTION GENERAL NOTES 1. ALL WORK, MATERIALS AND EQUIPMENT FOR TRAFFIC SIGNING AND STRIPING SHALL CONFORM TO THESE PLANS AND THE STANDARDS AND SPECIFICATIONS FOR THE CITY OF FONTANA AND THE LATEST EDITION OF THE STANDARDS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA 2. PAVEMENT MARKERS AND TRAFFIC STRIPING DIMENSIONS SHALL CONFORM TO CALTRANS STANDARD PLANS. 3. PAVEMENT MARKINGS SHALL CONFORM TO CITY STANDARD STENCILS FOR STRIPING & PAVEMENT MARKINGS OUTSIDE CALTRANS RIGHT—OF—WAY. 4. TRAFFIC STRIPING AND PAVEMENT MARKINGS ON NEW SURFACES SHALL BE IN TWO (2) SEPARATE COATS. A FINAL COAT IS TO BE APPLIED BETWEEN FOURTEEN (14) AND THIRTY (30) DAYS AFTER THE FIRST COAT. 5. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO THE LATEST CALTRANS SIGN SPECIFICATION SHEETS. SIGN CODES SHOWN HEREON ARE TO CONFORM TO CALTRANS SPECIFICATION SHEET CODES. TRAFFIC SIGN SIZE SHALL BE STANDARD UNLESS OTHERWISE INDICATED ON PLANS. 6. SIGN SHALL BE MOUNTED ON A "QUICK PUNCH POST" 2" X .2" (12 GA.) WITH 7/16" HOLES, 1" ON CENTERS, ON FOUR SIDES THAT CAN BE PUNCHED OUT. LENGTH MAY VARY WITH SIGN INSTALLATION TO MAINTAIN MINIMUM HEIGHTS. THE ANCHOR SHALL BE A HEAVY DUTY ONE PIECE ANCHOR, 2 1/2) X 30" X 6 GAUGE (NON—PERFORATED), TO FIT A 2" SQUARE STEEL POST, PREPUNCHED AT MID—POINT OF ANCHOR WITH ONE 7/16 1$ HOLE ON EACH SIDE, AND AT TOP. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL AT ALL TIMES. 8. CONTROL POINTS OR "CAT— TRACKING" IS TO BE APPROVED BY CITY THE TRAFFIC SECTION PRIOR TO PAINTING. 9. ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS ARE TO BE REMOVED FROM THE PAVEMENT BY SANDBLASTING BY THE CONTRACTOR. 10. REMOVAL OF ALL SIGNS AND LEGEND'S SHALL BE COORDINATED WITH THE FONTANA TRAFFIC ENGINNERING SECTION. STOP SIGN AND LEGENDS WILL BE REMOVED ONLY BY CITY FORCES. FIVE (5) DAYS ADVANCE WRITTEN NOTICE TO THE CITY TRAFFIC SECTION IS REQUIRED TO COORDINATE WORK WITH CITY FORCES. 11. EXACT LOCATION OF ALL EQUIPMENT AND CONTROL DEVICES TO BE DETERMINED BY THE ENGINEER. ADDITIONAL WARNING AND/OR CONSTRUCTION SIGNS MAY BE REQUIRED BY THE ENGINEER. q I zo Li l4wo ry 15, L 129 12s 12' 1�- 12' 12' 10 ITI n CONSTRUCTION NOTES REMOVE CONFLICTING STRIPING AND PAVEMENT LEGENDS. 02 INSTALL NEW THERMOPLASTIC X—WALKS.PER STD. PLAN A24E. INSTALL NEW SIGN AS SHOWN. 04 INSTALL 4 1) WHITE SOLID/SKIP LINE PER CALTRANS DETAIL 12. PAINT TYPE IV (LT/RT) ARROW. PAINT TYPE VI ARROW. 0 PAINT TWO—WAY LEFT TURN LANES DETAIL 32. PAINT 8" CHANNELIZING LINE PER CALTRANS DETAIL 38. REMOVE EXISTING SIGNS AND PAVEMENT MARKINGS. (@0 PAINT 4" DOUBLE YELLOW LINE PER CALTRANS DETAIL 22. 10, REINSTALL SIGN AFTER STAGE III CONSTRUCTION. DURING STAGE I rnNq-rF?i IrTINQ FnnTHll I MMENS 0 Z 57< ui Z 0 40 1 ZLe)l —2 1 1 Z EX. R/W 04 0) 00 00 No. 31 G94 Exp 12-3 I:e2 JVJ% '*4F— EXISTING DELINEATORS