CONSTRUCTION NOTES:
(D CONSTRUCT A.C. OVER 40(MN.) CLASS 2 A.B.
CONSTRUCT 47 P.c.c. SIDEWALK PER CITY
OF FONTANA STANDARD 105A, MODIFIED.
CONSTRUCT A2-8 CURB & GUTTER PER CALTRANS
STD. NO -A. OVER (r CLASS 2 A.B. COMPACTED TO
95% RELATIVE COMPACTION AS PER CALIFORNIA
TEST NO. 2 16.
CONSTRUCT DRIVEWAY APPROACH PER CITY OF
FONTANA STD. 102C, MODIFIED (W=40')
REMOVE EXISTING TREES.
TACK COAT & CAP OVER LW OF PAVEMENT.
INSTALL TRAFRC DELINEATORS PER CALTRANS
STD., A74 -A (CLASS I FLEXIBLE POST WITH TYPE G
REFLECTOR)
PAINT 47 WHITE TRANSITION STRIPE.
--c-5-1WALETO DRAIN.
APPROMMATE QTYS.
8250 SF
1650 SF
330 LF
I KA
5 ZA
6600 SF
16 KA
360 LF
APPROXIMATE DIRT QUANTITIES
RAW CUT 260 CY
COMPACTED FILL 142 CY
NOTE:
CUT An FILL QUANTITIES SHOWN HEREON REPRESENTS
ONLY THE VOLUME BETW EXISTING AND DESIGNED
GRADES. NO AUOWANCE RAS BEEN MADE FOR CLEARING
GRUBBING, PRE -COMPACTION. SWELUNG, REMOVALS AND
OVER -EXCAVATION. THE CONTRACTOR SHALL BE FULLY
RESPONSIBLE FOR DETERMINING THE EXACT DIRT
QUANTMS.
H
CONSTRUCTION
OF
IN THE
COUNTY OF SAN BERNARDINO
CALIFORNIA
W = 40'
47 SIDEWALK
zo
QENERAL bILITE&
1. An ENCROACHMENT PERMIT IS REQUIRED before any work
may begin in or near the State right of way.
2. ALL WORK within the state right of way SHALL CONFORM
to the latest STATE STANDARD PLANS & SPECIFICATIONS or
as directed by the State's representative (Standards other
than State must be pre -approved amd justified).
3. NO EQUIPMENT or MATERIALS may be stored on the the
State right of way.
4. All disturbed areas in the State righrt of way MUST BE
treated for erosion control (hydroseeding or equivalent
or as directed by the State's representative). The
responsibility for maintaining erosion control WELL NOT be
released until the seeding is well established. The
CONTRACTOR WILL BE RESPONSIBLE for the COST OF CALTRANS
CLEANING ANY DRAINAGE STRUCTURE/CHANNELS which have
become cluttered with debris and/or silt as a result of,
caused by, the construction project.
5. The STRUCTURAL SECTION shown within the State right of
way is for ESTIMATING purposes ONLY. The actual section
WU1 BE d"igned by a Soil Engineer after native soil testing
has been completed. A traffic index (TI) of 11.0 shall be
used in the design of the traveled way, and a IT of
shall be used for the shoulder design. The laboratory reports
and the design calculations SHALL BE SUBMr= to the State's
representative for APPROVAL PRIOR TO CONSTRUCTION of the
structural section.
6. All State drainage stxuctures MUST first BE COMPLETELY CLEANED
of debris and/or silt by the contractor PRIOR to making the
connection.
7. The contractor SHALL BE RESPONSIBLE for ensuring that any
State drainage facility which is connected to or directly affected
by the contractors operation SHAU BE clean and operational
PRIOR TO FINAL ACCEPTANCE of the permit work by the State.
Adequate clean -outs and acoess openings SHALL BE PROVIDED in
any construction within the State's right of way for future
maintenance and repair wor1r. as needed. This work shall be
furnished at NO COST TO the STATE.
8. Where SURVEY * MONLTILKNTS exist, such monuments SHALL BE
PROTECTED or shall be REFERENCED and REM pursuant to
Business and Professions Code, Sections 8700 to 8805
(Land Surveyor's Act).
9. The pavement MUJST BE saw -cut 2' minimum from the edge of
pavement. The saw -cuts MUJST BE perpendicular or parallel to the
State highway centerline.
10. ALL signing, striping and pavement markings SHALL BE in conformance
with the current edition of the TRAFFIC MANUAL, published by the
State of California, Department of Transportation, and the SPECIAL
PROVISIONS. All pavement markings SHALL BE thermoplatic unless
otherwLge noted on the plans.
11. The exact location of ALL SIGNS shall be determined in the field
by the State's representative.
12. ALL conflicting striping and pavement markings NOT SHOWN on the
plans SHALL BE REMOVED from the pavement by sandblasting by the
contractor.
13. ALL signs, roadside markers, electrollers, etc., SHALL BE PROTECTED
and/or REPIACED in-kind according to the current State Standard
Plans and current Traffic Manual, at NO COST TO the STATE.
14. All utilities including sewer and water lines, gas line, electrical and
cable television shall be applied and installed under separate permits
by its owners.
15. State-owned facilities, specifically detector loops, pun boxes, conduits
and detector cables, destroyed during construction shall be replaced
in-kind at no cost to the State. Also, any damage resulting in a
signal failure shall be repaired immediately.
I /- 4! SIDEWALK
71
6* SIDEWALK
SECTION AT FRONT OF SIDEWALK
ZZ9.30
6 " C. F.
RAI GE70
W 40'
&11 C -F
-EXPANSION JT.
Ir
1. T.
PCC 1DRIVEWAY------,
\-WEAKEN PLACE Xr.
PLAN VIEW
FRONT EDGE OF
SIDEWALK
a A
A A A A A A
\-EXPANSION JOINT EXPANSION JOINT
ZWEAKEN PLACE JOINT
SECTION AT CURB FACE
�C_J2 COMMERCIAL DRIVEWAY ENTRANCE
_2 CITY STD. DETAIL 102-C-�41ODIFIED 0+
T,
1
14'
7F 7P
T 0 35'
27. SLOPE 2% SLO
PE
CITY STD. 10 1
CITY STD. 10 1
RAISED MEDIAN DETAIL (FUTURE)
(SEE PLAN VIEW ON SHT. C-5)
t, it EXPANSION JT.
TOP OF CURVE
16. Replacement of State-owned electrical facilities shall be
in accordance with State of California Standard Plaw and
Standard Specifications dated January, 1988.
17. No splicing of conductors or detector cable shall be
allowed. New conductors shall run continuously from
terminal block to terminal block and detector loop cable
shall run continuously all the way to the controller.
18. State's Electrical Inspector shall be notified 24 hours in
advance of any detector work so that adjustments can be
made to the signal controller.
19. Intersection lighting schedule &hall not be interrupted.
20. Traffic signal shall remain in operation.
ADD'L NOTES
XW. PAVEMENT THICKNESS DESIGN STDS. FOR CITY OF FONTANA:
A. ALL PROJECTS SHALL SUBMIT A PRELIMINARY SECTION AND
SOILS REPORT TO BE APPROVED BY THE CITY ENGINEER PRIOR
TO APPROVAL OF PLANS. THE PAVEMENT DESIGN STANDARDS ARE
A TW&M (20) YEAR LIFE; A MAXIMUM RESISTANCE VALUE
R = 70 AND TRAFFIC INDEXES PER THE ATTACHED TABLE.
B. OTHER PARAMETERS TO CONSIDER IN DETERMINING MIND01A
PAVEMM THICKNESS ARE CONSTRUCTION PLACEMENT TOLERANCES
FOR PAVEMENT, BASE COURSES, AND NATIVE SUBGRADES, TRUCK
AND CONSTRUCTION TRAFFIC BETWEEM PAVEMENT 1JYTS DURING
CONSTRUCTION, MATERIAL TESTING AND QUALITY CONTROL, AND
LANDSCAPE WATERING EFir UPON UNDERLYING SOILS AND
BASE COURSES.
C. All STREET IMPROVMNT PLANS SHALL HAVE PAVEMENT
NOTES AS FOLLOWS:
1. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE
MATKRIAL FOR STRUCTURAL STREET SECTIONS SHALL BE
RECOIDIENDED BY A GEOTECHNICAL ENGINEERING REPORT AND
SUBUTI'TED TO THE Crff OF FONTANA FOR APPROVAL UPON
COMPLETION OF ROUGH GRADING.
2. PAVKMENT STRUCTURAL SECTIONS SHOWN ARE END&UM
AND SUBJECT TO REVISION AND APPROVAL OF THE CITY
AS REQUIRED BY SOILS TESTS TAKEN AFTER COMPLETION OF
ROUGH GRADING.
D. THE MINIIAUM PAVEMENT SECTION THICKNESS FOR STREET
IMPROVKMENT PLANS FOR SECONDARY HIGHWAYS, PRIMARY
HIGHWAYS AND MAJOR DIVIDED HIGHWAYS DESIGNATION, USE
6 11Z OR EQUIV9ZNT BEC77ON OF A.C. ON AGGREGATE II
BASE OVER 19' OF 95% COMPACTED NATIVE SOIL
PRIVATE ENGINEER'S NOTE:
THE PRIVATE ENGINEER SIGNING THESE PLANS IS RESPONSIBLE
FOR ASSUMING THE ACCURACY AND ACCEPTABILITY OF THE WORK
90 - IN THE EVENT OF DISCREPANCIES ARISING DURING
CONSTRUCTION THE PRIVATE ENGINEER SHALL BE RESPONSEBLE
FOR RMINING AN ACCEPTABLE SOLUTION AND REVISING THE
PLANS FOR APPROVAL BY THE CITY.
�A T�'� �1
4 zy _t�
A 3;-A. ji" �Af
0ENERAL NOTESo
21. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS AND THE COUNTY OF
SAN BERNARDINO STANDARDS.
22, CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE APPROPRIATE
DEPARTMENT PRIOR TO START OF ANY WORK WITHIN THE COUNTY LIMITS.
23. ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR
TO CONSTRUCT THE WORK TO THE PLAN GRADES.
24. ALL PIPES OR SUBSTRUCTURES OF ANY KIND AND AIL TELEPHONE OR POWER
POLES, WATER METERS, VALVES, HYDRANTS, IRRIGATION STRUCTURES, ETC.,
SHOWN OR NOT SHOWN ON THIS PLAN AND LOCATED WITHIN AREAS TO BE
IMPROVED AND INTERFERING WITH CONSTRUCTION, SHALL BE RELOCATED BY
OTHERS; rT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY ALL OF
THE AGENCIES CONCERNED BEFORE CONSTRUCTION BEGTNS.
25. WATER VALVES COVERS SHALL BE RAISED TO GRADE BY THE PAVING.
26. AS -BUILT PLANS SHALL BE PROVIDED TO THE COUNTY BY THE CONTRACTOR.
27. All UTILITY COMPANIES SHALL BE GPM 48 HOURS NOTICE PRIOR TO WORK
AROUND THEIR FACILITIES.
28. All BACKFILL 110 BE CERTIFIED BY THE*SOILS ENGRMR.
29. ALL MATERIALS AND METHODS TO BE SUBJECT TO THE APPROVAL OF THE COUNTY
ENGINEER.
30. BACKFILL MATERIALS TO HAVE A S.E. OF 30 (MN.) AND MN. COMPACTION OF 90%.
31. ALL NEW OR EXISTING VALVE CANS AND MANHOLES SHALL BE ADJUSTED TO
GRADE DURING PAVING.
32. CONTACTOR TO INSTALL PAVEMENT MARKINGS AND STRIPING AS REQUIRED BY
THE COUNTY ENGINEER.
33. CONTRACTOR SHALL NOT OPERATE ANY MAIN UNE WATER VALVE.
34. IF EXISTING UTU=S OR ANY OTHER FACII1TIES CONFLICT WITH THE
PROPOSED IMPROVEMENTS, WORK STIAIJ STOP AND THE ENGINEER NOT7
DIATELY.
35. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE
ENGINEER AFTER THE BASE COURSE HAS BEEN CONSTRUCTED AND BEFORE
THE PAVING HAS BEEN INSTALLED SO THAT THE ENGINEER MAY INSTALL
THE STREET CENTERLINE MONUIffaNTS.
36. ENCROACMENT PERMIT IS REQUIRED FROM CALTRANS PRIOR TO DOING ANY
WORK WITHIN THE STATE HIGHWAY RIGHT-OF-WAY.
37. ALL WORK WITHIN THE HIGHWAY RIGHT-OF-WAY SHALL BE TO STATE
STANDARDS.
38. STRUCTURAL SECTION INDICATED FOR HIGHWAY IS FOR EXT11LATING ONLY.
ACTUAL SECTION TIO BE DETERMINED AFTER GRADING AND APPROPRIATE
LAB TESTS. A T.I. OF 10 SHOULD BE USED IN THE DESIGN OF THE
HIGHWAY LANES SECTION. A T.I. OF 6.0 COULD BE USED IN THE SHOULDER
AREA.
39. PROHIBIT PARMG ALONG THE STATE HIGHWAY BY THE PROPER PIACEMENT
OF NO PARKING ANYTIME SIGNS (R-26) AS DIRECTED BY STATE REPRESENTATIVE.
NOTICE TO CONTRACTOR
CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE
OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS
AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY
AND NOT LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRAC-
TOR SHAIL DEFEND, INDEB047Y AND HOLD THE OWNER AND THE ENGINEER
HARMLESS FROM ANY AND AM LIABILM, REAL OR All , IN CONNECTION
WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF = OWNER OR THE
ENGINEER.
CAIMON:
THE ENGINEER PREPARING THESE PLANS WaL NOT BE RESPONSIBLE
FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES OR USES OF THESE
PLANS. ALL CHANGES TO THE PLANS MUJST BE IN WRrMG AND
MUST BE APPROVED BY THE PREPARER OF MSE PLANS.
UNDERGROUND STRUCTURE
AM UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER
OR OTHER AND THOSE SHOWN ON THE RECORDS EXAMINED ARE INDICATED
WITH THEM APPROXIMATE LOCATION AND EXTEM. THE OWNER BY
ACCEPTING THESE PLANS OR PROCEEDING WITH IMPROVEMENTS PURSUANT
THERETO AGREES TO ASSUME LIABILITY AND TO HOLD UNDERSIGNED
HARMUSS FOR ANY DAMAGES RESULTING FROM THE EXISTENT OF
UNDERGROUND UMMS OR STRUCTURES NOT REPORTED TO THE
UNDERSIGNED: NOT INDICATED ON THE PUBLIC RECORDS OR SHOWN ON
RECORDS EXAMINED. THE CONTRACTOR 13 REQUIRED TO TAKE DUE PRE-
CAUTIONARY MMSURES TO PROTECT THE UTILITIES OR STRUCTURES
SHOWN AND ANY OTHER UTILITIES OR STRUCTURES FOUND AT THE SITE.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNERS
OF THE UTIUTIES OR STRUCTURES CONCERNED BEFORE STARTING WORK.
z
z
z
E-4
BASELM
ROAD
PIRCWCT
FOOTHILL
BOULEVARD
z
VICINITY MAP
N.T.S.
n R/W
PROPOM R/W
1 81 52' 120' 52'
50, 50,
0.6' 1-5, 1 COLD PIANN SAW CUT LINE
11 1 81 1/r 25' 8 P
7'
Ll)
�� �2
_40IN MaST. PAVWr MAV AS SHOWN
AT BRRAK POINT. ON PROMS
F"i
MaSTING
Firm
D11PROV1UM]7NNqM1QJ
wiiiw"
CONSTRUCTION NOTES:
(D CONSTRUCT A.C. OVER 40(MN.) CLASS 2 A.B.
CONSTRUCT 47 P.c.c. SIDEWALK PER CITY
OF FONTANA STANDARD 105A, MODIFIED.
CONSTRUCT A2-8 CURB & GUTTER PER CALTRANS
STD. NO -A. OVER (r CLASS 2 A.B. COMPACTED TO
95% RELATIVE COMPACTION AS PER CALIFORNIA
TEST NO. 2 16.
CONSTRUCT DRIVEWAY APPROACH PER CITY OF
FONTANA STD. 102C, MODIFIED (W=40')
REMOVE EXISTING TREES.
TACK COAT & CAP OVER LW OF PAVEMENT.
INSTALL TRAFRC DELINEATORS PER CALTRANS
STD., A74 -A (CLASS I FLEXIBLE POST WITH TYPE G
REFLECTOR)
PAINT 47 WHITE TRANSITION STRIPE.
--c-5-1WALETO DRAIN.
APPROMMATE QTYS.
8250 SF
1650 SF
330 LF
I KA
5 ZA
6600 SF
16 KA
360 LF
APPROXIMATE DIRT QUANTITIES
RAW CUT 260 CY
COMPACTED FILL 142 CY
NOTE:
CUT An FILL QUANTITIES SHOWN HEREON REPRESENTS
ONLY THE VOLUME BETW EXISTING AND DESIGNED
GRADES. NO AUOWANCE RAS BEEN MADE FOR CLEARING
GRUBBING, PRE -COMPACTION. SWELUNG, REMOVALS AND
OVER -EXCAVATION. THE CONTRACTOR SHALL BE FULLY
RESPONSIBLE FOR DETERMINING THE EXACT DIRT
QUANTMS.
H
CONSTRUCTION
OF
IN THE
COUNTY OF SAN BERNARDINO
CALIFORNIA
W = 40'
47 SIDEWALK
zo
QENERAL bILITE&
1. An ENCROACHMENT PERMIT IS REQUIRED before any work
may begin in or near the State right of way.
2. ALL WORK within the state right of way SHALL CONFORM
to the latest STATE STANDARD PLANS & SPECIFICATIONS or
as directed by the State's representative (Standards other
than State must be pre -approved amd justified).
3. NO EQUIPMENT or MATERIALS may be stored on the the
State right of way.
4. All disturbed areas in the State righrt of way MUST BE
treated for erosion control (hydroseeding or equivalent
or as directed by the State's representative). The
responsibility for maintaining erosion control WELL NOT be
released until the seeding is well established. The
CONTRACTOR WILL BE RESPONSIBLE for the COST OF CALTRANS
CLEANING ANY DRAINAGE STRUCTURE/CHANNELS which have
become cluttered with debris and/or silt as a result of,
caused by, the construction project.
5. The STRUCTURAL SECTION shown within the State right of
way is for ESTIMATING purposes ONLY. The actual section
WU1 BE d"igned by a Soil Engineer after native soil testing
has been completed. A traffic index (TI) of 11.0 shall be
used in the design of the traveled way, and a IT of
shall be used for the shoulder design. The laboratory reports
and the design calculations SHALL BE SUBMr= to the State's
representative for APPROVAL PRIOR TO CONSTRUCTION of the
structural section.
6. All State drainage stxuctures MUST first BE COMPLETELY CLEANED
of debris and/or silt by the contractor PRIOR to making the
connection.
7. The contractor SHALL BE RESPONSIBLE for ensuring that any
State drainage facility which is connected to or directly affected
by the contractors operation SHAU BE clean and operational
PRIOR TO FINAL ACCEPTANCE of the permit work by the State.
Adequate clean -outs and acoess openings SHALL BE PROVIDED in
any construction within the State's right of way for future
maintenance and repair wor1r. as needed. This work shall be
furnished at NO COST TO the STATE.
8. Where SURVEY * MONLTILKNTS exist, such monuments SHALL BE
PROTECTED or shall be REFERENCED and REM pursuant to
Business and Professions Code, Sections 8700 to 8805
(Land Surveyor's Act).
9. The pavement MUJST BE saw -cut 2' minimum from the edge of
pavement. The saw -cuts MUJST BE perpendicular or parallel to the
State highway centerline.
10. ALL signing, striping and pavement markings SHALL BE in conformance
with the current edition of the TRAFFIC MANUAL, published by the
State of California, Department of Transportation, and the SPECIAL
PROVISIONS. All pavement markings SHALL BE thermoplatic unless
otherwLge noted on the plans.
11. The exact location of ALL SIGNS shall be determined in the field
by the State's representative.
12. ALL conflicting striping and pavement markings NOT SHOWN on the
plans SHALL BE REMOVED from the pavement by sandblasting by the
contractor.
13. ALL signs, roadside markers, electrollers, etc., SHALL BE PROTECTED
and/or REPIACED in-kind according to the current State Standard
Plans and current Traffic Manual, at NO COST TO the STATE.
14. All utilities including sewer and water lines, gas line, electrical and
cable television shall be applied and installed under separate permits
by its owners.
15. State-owned facilities, specifically detector loops, pun boxes, conduits
and detector cables, destroyed during construction shall be replaced
in-kind at no cost to the State. Also, any damage resulting in a
signal failure shall be repaired immediately.
I /- 4! SIDEWALK
71
6* SIDEWALK
SECTION AT FRONT OF SIDEWALK
ZZ9.30
6 " C. F.
RAI GE70
W 40'
&11 C -F
-EXPANSION JT.
Ir
1. T.
PCC 1DRIVEWAY------,
\-WEAKEN PLACE Xr.
PLAN VIEW
FRONT EDGE OF
SIDEWALK
a A
A A A A A A
\-EXPANSION JOINT EXPANSION JOINT
ZWEAKEN PLACE JOINT
SECTION AT CURB FACE
�C_J2 COMMERCIAL DRIVEWAY ENTRANCE
_2 CITY STD. DETAIL 102-C-�41ODIFIED 0+
T,
1
14'
7F 7P
T 0 35'
27. SLOPE 2% SLO
PE
CITY STD. 10 1
CITY STD. 10 1
RAISED MEDIAN DETAIL (FUTURE)
(SEE PLAN VIEW ON SHT. C-5)
t, it EXPANSION JT.
TOP OF CURVE
16. Replacement of State-owned electrical facilities shall be
in accordance with State of California Standard Plaw and
Standard Specifications dated January, 1988.
17. No splicing of conductors or detector cable shall be
allowed. New conductors shall run continuously from
terminal block to terminal block and detector loop cable
shall run continuously all the way to the controller.
18. State's Electrical Inspector shall be notified 24 hours in
advance of any detector work so that adjustments can be
made to the signal controller.
19. Intersection lighting schedule &hall not be interrupted.
20. Traffic signal shall remain in operation.
ADD'L NOTES
XW. PAVEMENT THICKNESS DESIGN STDS. FOR CITY OF FONTANA:
A. ALL PROJECTS SHALL SUBMIT A PRELIMINARY SECTION AND
SOILS REPORT TO BE APPROVED BY THE CITY ENGINEER PRIOR
TO APPROVAL OF PLANS. THE PAVEMENT DESIGN STANDARDS ARE
A TW&M (20) YEAR LIFE; A MAXIMUM RESISTANCE VALUE
R = 70 AND TRAFFIC INDEXES PER THE ATTACHED TABLE.
B. OTHER PARAMETERS TO CONSIDER IN DETERMINING MIND01A
PAVEMM THICKNESS ARE CONSTRUCTION PLACEMENT TOLERANCES
FOR PAVEMENT, BASE COURSES, AND NATIVE SUBGRADES, TRUCK
AND CONSTRUCTION TRAFFIC BETWEEM PAVEMENT 1JYTS DURING
CONSTRUCTION, MATERIAL TESTING AND QUALITY CONTROL, AND
LANDSCAPE WATERING EFir UPON UNDERLYING SOILS AND
BASE COURSES.
C. All STREET IMPROVMNT PLANS SHALL HAVE PAVEMENT
NOTES AS FOLLOWS:
1. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE
MATKRIAL FOR STRUCTURAL STREET SECTIONS SHALL BE
RECOIDIENDED BY A GEOTECHNICAL ENGINEERING REPORT AND
SUBUTI'TED TO THE Crff OF FONTANA FOR APPROVAL UPON
COMPLETION OF ROUGH GRADING.
2. PAVKMENT STRUCTURAL SECTIONS SHOWN ARE END&UM
AND SUBJECT TO REVISION AND APPROVAL OF THE CITY
AS REQUIRED BY SOILS TESTS TAKEN AFTER COMPLETION OF
ROUGH GRADING.
D. THE MINIIAUM PAVEMENT SECTION THICKNESS FOR STREET
IMPROVKMENT PLANS FOR SECONDARY HIGHWAYS, PRIMARY
HIGHWAYS AND MAJOR DIVIDED HIGHWAYS DESIGNATION, USE
6 11Z OR EQUIV9ZNT BEC77ON OF A.C. ON AGGREGATE II
BASE OVER 19' OF 95% COMPACTED NATIVE SOIL
PRIVATE ENGINEER'S NOTE:
THE PRIVATE ENGINEER SIGNING THESE PLANS IS RESPONSIBLE
FOR ASSUMING THE ACCURACY AND ACCEPTABILITY OF THE WORK
90 - IN THE EVENT OF DISCREPANCIES ARISING DURING
CONSTRUCTION THE PRIVATE ENGINEER SHALL BE RESPONSEBLE
FOR RMINING AN ACCEPTABLE SOLUTION AND REVISING THE
PLANS FOR APPROVAL BY THE CITY.
�A T�'� �1
4 zy _t�
A 3;-A. ji" �Af
0ENERAL NOTESo
21. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS AND THE COUNTY OF
SAN BERNARDINO STANDARDS.
22, CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE APPROPRIATE
DEPARTMENT PRIOR TO START OF ANY WORK WITHIN THE COUNTY LIMITS.
23. ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR
TO CONSTRUCT THE WORK TO THE PLAN GRADES.
24. ALL PIPES OR SUBSTRUCTURES OF ANY KIND AND AIL TELEPHONE OR POWER
POLES, WATER METERS, VALVES, HYDRANTS, IRRIGATION STRUCTURES, ETC.,
SHOWN OR NOT SHOWN ON THIS PLAN AND LOCATED WITHIN AREAS TO BE
IMPROVED AND INTERFERING WITH CONSTRUCTION, SHALL BE RELOCATED BY
OTHERS; rT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY ALL OF
THE AGENCIES CONCERNED BEFORE CONSTRUCTION BEGTNS.
25. WATER VALVES COVERS SHALL BE RAISED TO GRADE BY THE PAVING.
26. AS -BUILT PLANS SHALL BE PROVIDED TO THE COUNTY BY THE CONTRACTOR.
27. All UTILITY COMPANIES SHALL BE GPM 48 HOURS NOTICE PRIOR TO WORK
AROUND THEIR FACILITIES.
28. All BACKFILL 110 BE CERTIFIED BY THE*SOILS ENGRMR.
29. ALL MATERIALS AND METHODS TO BE SUBJECT TO THE APPROVAL OF THE COUNTY
ENGINEER.
30. BACKFILL MATERIALS TO HAVE A S.E. OF 30 (MN.) AND MN. COMPACTION OF 90%.
31. ALL NEW OR EXISTING VALVE CANS AND MANHOLES SHALL BE ADJUSTED TO
GRADE DURING PAVING.
32. CONTACTOR TO INSTALL PAVEMENT MARKINGS AND STRIPING AS REQUIRED BY
THE COUNTY ENGINEER.
33. CONTRACTOR SHALL NOT OPERATE ANY MAIN UNE WATER VALVE.
34. IF EXISTING UTU=S OR ANY OTHER FACII1TIES CONFLICT WITH THE
PROPOSED IMPROVEMENTS, WORK STIAIJ STOP AND THE ENGINEER NOT7
DIATELY.
35. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE
ENGINEER AFTER THE BASE COURSE HAS BEEN CONSTRUCTED AND BEFORE
THE PAVING HAS BEEN INSTALLED SO THAT THE ENGINEER MAY INSTALL
THE STREET CENTERLINE MONUIffaNTS.
36. ENCROACMENT PERMIT IS REQUIRED FROM CALTRANS PRIOR TO DOING ANY
WORK WITHIN THE STATE HIGHWAY RIGHT-OF-WAY.
37. ALL WORK WITHIN THE HIGHWAY RIGHT-OF-WAY SHALL BE TO STATE
STANDARDS.
38. STRUCTURAL SECTION INDICATED FOR HIGHWAY IS FOR EXT11LATING ONLY.
ACTUAL SECTION TIO BE DETERMINED AFTER GRADING AND APPROPRIATE
LAB TESTS. A T.I. OF 10 SHOULD BE USED IN THE DESIGN OF THE
HIGHWAY LANES SECTION. A T.I. OF 6.0 COULD BE USED IN THE SHOULDER
AREA.
39. PROHIBIT PARMG ALONG THE STATE HIGHWAY BY THE PROPER PIACEMENT
OF NO PARKING ANYTIME SIGNS (R-26) AS DIRECTED BY STATE REPRESENTATIVE.
NOTICE TO CONTRACTOR
CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE
OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS
AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY
AND NOT LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRAC-
TOR SHAIL DEFEND, INDEB047Y AND HOLD THE OWNER AND THE ENGINEER
HARMLESS FROM ANY AND AM LIABILM, REAL OR All , IN CONNECTION
WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR
LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF = OWNER OR THE
ENGINEER.
CAIMON:
THE ENGINEER PREPARING THESE PLANS WaL NOT BE RESPONSIBLE
FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES OR USES OF THESE
PLANS. ALL CHANGES TO THE PLANS MUJST BE IN WRrMG AND
MUST BE APPROVED BY THE PREPARER OF MSE PLANS.
UNDERGROUND STRUCTURE
AM UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER
OR OTHER AND THOSE SHOWN ON THE RECORDS EXAMINED ARE INDICATED
WITH THEM APPROXIMATE LOCATION AND EXTEM. THE OWNER BY
ACCEPTING THESE PLANS OR PROCEEDING WITH IMPROVEMENTS PURSUANT
THERETO AGREES TO ASSUME LIABILITY AND TO HOLD UNDERSIGNED
HARMUSS FOR ANY DAMAGES RESULTING FROM THE EXISTENT OF
UNDERGROUND UMMS OR STRUCTURES NOT REPORTED TO THE
UNDERSIGNED: NOT INDICATED ON THE PUBLIC RECORDS OR SHOWN ON
RECORDS EXAMINED. THE CONTRACTOR 13 REQUIRED TO TAKE DUE PRE-
CAUTIONARY MMSURES TO PROTECT THE UTILITIES OR STRUCTURES
SHOWN AND ANY OTHER UTILITIES OR STRUCTURES FOUND AT THE SITE.
IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNERS
OF THE UTIUTIES OR STRUCTURES CONCERNED BEFORE STARTING WORK.