HomeMy WebLinkAbout2059-1CONDUCTOR SCHEDULE
A.W.G
OR
D. L. C.
I CIRCUIT
RUNS
A
/ .4\
A
1 /0\11/3\1
A
A
11±
A
/�5\
A
/6\
1AA
1AA
A
"B"
MAST ARM
2 VEH.
pole and equipment on
3
3
3
6
3
3
3
3
6
MAS/MAS
3 VEH. (FUTURE)
4
SP -1-T
1
4
20OW
Randall
1
3
3
3
3
1 13'
4 VEH.
3
3
3
3
6
3
3
3
3
3
2 PED.
2
2
2
4
2
2
2
2
4 PED.
2
2
1 2
2
4
2
2
2
2
2
#14
2 P. P. B.
I
1
1
2
1
1
1
1
1
4 P. P. B.
I
1
1
2
1
1
1
1
P.P.B. COMMON
I
I
1
1
2
1
1
1
1
1
SPARES
3
3
3
3
6
3
3
3
3
3
TOTAL #14
10
16
16
16
32
16
19
19
19
13
#12
1. S. N. S.
2
2
2
3
3
2
2
2
2
LUMINAIRES
2
2
2
2
2
21
2
2
2
#10
SIGNAL COMMON
I
i
1
1
2 1
1
1
1
1
1
TOTAL #10
1
1
3
3
3
4
3
3 1
3
3
3
0 1 DET.(FUTURE)
2
2
2 DET.
2
2
4
2
2
2
D. L. C.
4 DET.
2
2
2
2
3
TOTAL D.L.C.
2
2
4
4
7
2
4
4
-
CONDUIT SIZE
2 11
2 11
2 11
2 11
2 11
2 11
3 11
3 11
2 11
2 11
A
1/0� Indicates existing conduit Pun.
AIndicates new conduit run.
04
J62 02 .04P I I I 104P
04
02 04
Steady Demand Sequence
TRAFFIC PHASE DIAGRAM
NOTES: CONDUCTOR SCHEDULE
A A A
1. Abandon condu�it Puns / \ , and
L7 - /0\ /i\
A I IL a-%
2. Remove and discard pull boxes between conduit Puns A \ and A and between
/7 /i�
I A 'L
A A
conduit Puns /8\ I andL/9\,.
3. Intercept north advance loop conduit run with new pull box,
4. Install new conduit Puns A. A8,A , and Ao -
5. Install all new conductops and DLC's in new conduit PunsA, A, A,
and k per CONDUCTOR SCHEDULE.
CENTER OF CROSSWALK OR STOP BAR
3'
LEFT TURN LANE
LOOPS SHALL BE 6'x6' IN 12' OR WIDER LANES.
CENTER LOOPS IN INTERIOR LANES AND INSTALL 3' FROM
LANE LINE IN OUTSIDE LANES. REDUCE LOOPS TO 5' WIDTH
FOR LANES LESS THAN 12' WIDE.
innQ nPTPrTnP TKIQTAIIATTnKi nPTATI
A
7
A
1/3
cc
SCALE: V = 20'
POLE AND EQUIPMENT SCHEDULE
NO.
STANDARD
PLACEMENT
DIMENSIONS
VEH. SIGNAL MTG.
PED.
SIGNAL
P.P.B.
H.P.S.
LUMINAIRE
I.I.S.N.S.
TYPE
SIG.H.A.
ILUM. N. A.
A
"B"
MAST ARM
POLE
pole and equipment on
MTG.
0
1 ARROW
Salvaged pole
24-4-80
35'
I
15'
10'
6
MAS/MAS
SV -1-T
1
4
SP -1-T
2
4
20OW
Randall
1
2
- i -A
- z
-
1 13'
3
pole and equipment on
TV -1-T
1 2
1SP-1-T
4,
00
be delivered to
-
NOTES: POLE AND EQUIPMENT SCHEDULE
M P7 KI r-7 0 A I KI n T r-7 Q
POLE (D
1. The exact location of all traffic signal equipment shall be as directed by the
1.
Remove and
salvage existing pole
and equipment.
Remove completely the old
foundation.
Backfill hole with compacted Class II
aggregate base.
2.
Install new
pole and equipment on
new foundation
per plan.
3.
Salvaged pole
and equipment shall
be delivered to
City Yards.
POLE 2
Existing TYPE H Riser
Scale: 20'
1.
Remove and
salvage existing pole
and equipment.
Remove completely the old
foundation.
Backfill hole with compacted Class II
aggregate base.
2.
Install new
pole and equipment on
new foundation
per plan.
3.
Salvaged pole
and equipment shall
be delivered to
City Yards.
M P7 KI r-7 0 A I KI n T r-7 Q
KinTP7Q* CZTDTDTklr.'
F-il — Remove existing crosswalk by wet sandblasting.
R2 — Paint 12" white crosswalk stripe.
1-�
Underground Service Alert
Call: TOLL FREE
1-800
422-4133
TWO WORKING DAYS BEFORE YOU DIG
1. The exact location of all traffic signal equipment shall be as directed by the
L -L J L -Li
City's representative.
Existing Controller 2. All work, material, and equipment shown on this plan shall conform to the requi-
rements of the State of California, Department of Transportation, Standard
STRIPING PLAN
<
Plans and Specifications (January 198B) and the Special Provisions.
Existing TYPE H Riser
Scale: 20'
(Service Point) 3. The City's representative shall be notified 48 hours prior to performing any
work that may cause damage to the existing signal system so that immediate
5- CLEAR FROM FLOW
<
adjustments or repairs can be made to maintain the system in operation.
LINE OF GUTTER
IWVMM I
KinTP7Q* CZTDTDTklr.'
F-il — Remove existing crosswalk by wet sandblasting.
R2 — Paint 12" white crosswalk stripe.
1-�
Underground Service Alert
Call: TOLL FREE
1-800
422-4133
TWO WORKING DAYS BEFORE YOU DIG