Loading...
HomeMy WebLinkAbout2060-58 .................... _ .................... .......... I ................................... I .......... ..." ........... I .... ........... I ........... RAISED ISLAND _zol�2_ — — 7 E� � mo� � 1 )2/sp CP 1 DLC 1 G R A M DETECTOR SCHEDULE GROUP RUN NO. SENSOR 115141FIVII101-VAM DETECTOR, CONTROLLER INPUT SYSTEM INPUT TIMING rL; I V, 41 11,.M. rA t LUM.1 — TYPE PHASE unnummunnum PHASE 4 FUTURE 3 1 PHASE 7 D1 FUTURE 4 2' PHASE 7 FUTURE 2 EAST 1 2 unnummunnnn 2 B DISC 2 3 PHASE 2 SV -1—T 3 1 PHASE 5 C1 11.75 4 2 PHASE a mannummmmmm 3 SOU TH 1 SPARE PHASE 5 _4 PHASE 7 PHASE 8 2 2 PHASE 8 DRIVEWAY __j 3 1 mmmummunnna 11. 75' 4 2 PHASE 3 3" 4 WEST 1 2 PHASE 6 B DISC* mmmmanummmm PHASE 6 SV -1—T 3 1 PHASE 1 C2 11. 75' 4 2 PHASE 1 4-1 5 SYSTEM I I N PHASE 4 B 1 HOLD 2 1 E PHASE 2 Al HOLD 3 is PHASE 8 B2 HOLD 4 1 W, PHASE 6 A2 HOLD 29-5-80 30 150 15 250 W B 4 W PAS, 1MAT SV -1—T SP-1—CS "*"'TOWER*4fOURT 11. 75' '2.5' 6-.00. 1_A_ 10 — — — ............................... ...... ........ ..................................................... ..................................................... 2 muumuu===== ... .......................................... .... .................................. 01M TV -2—T SP-1—CS 11.75' 25 02 7 26-4-80 -A-30 08 0.3 ul mmmunummmma L250 W B 2 N 1MAS, 1MAT SV -1—T SP-1—CS Slover Ave 11. 75' 2.5' 8 1 110 2 7 B E TV -2—T Me NONE 11. 75' SIGNAL COMMON LUMINAIRES mmmmmmmmmmm 07 FUTURE '=MUUMUU==== s on c, Munn WMAIIIIIIIIIIInum U,M'--SIGNAL S_ERV_10E___�W========== I— —_ L CONDUIT SIZE (IINCH �S) EXISTING CONDUIT PER STREET IMPROVEMENT PLAN 2053. 8 .................... _ .................... .......... I ................................... I .......... ..." ........... I .... ........... I ........... RAISED ISLAND _zol�2_ — — 7 E� � mo� � 1 )2/sp CP 1 DLC =TYPE 3 DISCON P H A S E D 1 G R A M DETECTOR SCHEDULE GROUP A SENSOR CHANNEL DETECTOR, CONTROLLER INPUT SYSTEM INPUT TIMING NORTH 1 SPARE LUM.1 — TYPE PHASE 2 2 PHASE 4 FUTURE 3 1 PHASE 7 D1 FUTURE 4 2' PHASE 7 FUTURE 2 EAST 1 2 'PHASE 2 B DISC 2 3 PHASE 2 SV -1—T 3 1 PHASE 5 C1 11.75 4 2 PHASE a 'N 2.00 3 SOU TH 1 SPARE PHASE 5 _4 PHASE 7 PHASE 8 2 2 PHASE 8 DRIVEWAY __j 3 1 PHASE 3 D2 11. 75' 4 2 PHASE 3 3" 4 WEST 1 2 PHASE 6 B DISC* 2 3 PHASE 6 SV -1—T 3 1 PHASE 1 C2 11. 75' 4 2 PHASE 1 4-1 5 SYSTEM I I N PHASE 4 B 1 HOLD 2 1 E PHASE 2 Al HOLD 3 is PHASE 8 B2 HOLD 4 1 W, PHASE 6 A2 HOLD =TYPE 3 DISCON P H A S E D 1 G R A M STANDARD GROUP A 'A GROUP B BT. SIGNAL MOUNTING S.N.S. PLACEMENT REMARKS z TYPE HT. 0 Z_ z LUM.1 H.P.S.V. TYPE PHASE QUAD MAST POLE SE 1 PHASE 2 PHASE13 PHASE 4 1_1 29-5-80 30 50 15 250 W B 8 E z SV -1—T SP-1—CS FUTURE 11.75 2.5' 'N 2.00 1 --A 10 — PHASE 5 1 PHASE 6 PHASE 7 PHASE 8 EE SLOVER AVE DRIVEWAY __j W 0 BCR ' T FAA T0111111W11111111ER RIVI 82 1 14' 13' Uj 0z _j C :3 14' rRAFFIC SIGNAL //—�ASEMEIT I_S03 11 V 2—SO8 110 2—SI 103 COURT O -WAY Ic I -114 12 14 #6 IN t7 Ht J_ P 0 L E S C H E D U L E L 0- STANDARD ARMS ISIG. LUMINAIRE PED PUSH BT. SIGNAL MOUNTING S.N.S. PLACEMENT REMARKS C TYPE HT. 0 Z_ z LUM.1 H.P.S.V. TYPE PHASE QUAD MAST POLE PED. A 1_1 29-5-80 30 50 15 250 W B 8 E 2MAS, 1MAT SV -1—T SP-1—CS Z±�TOWER*COURT WER*COURT 11.75 2.5' 'N 2.00 1 --A 10 — — — B 6 S ........... . .............. ............ .................... TV -2—T SP-1—CS ........... .......... 11. 75' 2.5' SEE NOTE 3" 26-4-80 30 40 15 250 W B 6 S 1 MAS, 1 MAT SV -1—T SP-1—CS Slover Ave Slover Ave 11. 75' 2.5 SEE NOTE 9 4-1 1--A 10 — — B 4 W ........................ ......................................................................................... TV -2—T SP-1—CS A 11. 75' 25 5 29-5-80 30 150 15 250 W B 4 W PAS, 1MAT SV -1—T SP-1—CS "*"'TOWER*4fOURT 11. 75' '2.5' 6-.00. 1_A_ 10 — — — ............................... ...... ........ ..................................................... ..................................................... 2 N ... .......................................... .... .................................. 01M TV -2—T SP-1—CS 11.75' 25 02 7 26-4-80 -A-30 08 0.3 40 5 L250 W B 2 N 1MAS, 1MAT SV -1—T SP-1—CS Slover Ave 11. 75' 2.5' 8 1 110 2 7 B E TV -2—T SP-1—CS NONE 11. 75' 0 MW I ECR N .................... ....... ..... .... I ............. _ . . ........ I ............... ....... * �i--L I ......... ....... ............ ...... ...... ..... ......... .......... ............ . ........................... . ..... I ....... ......... ....... ....... ......................................................... ....... ....... .............. ..... 6 .00%00 0 #6 - V *** STREET NAME LEGEND TO BE DETERMINED BY THE CITY TRAFFIC ENGINEER. =SUPPLY NEW S.N.S., DIAMOND GRADE REFELCTIVE SIGNAL ARM MOUNTED STREET NAME SIGN. 2" C. 2 #10 UNMETERED LUMINAIRES CONTROLLER, SEE NOTE[j] 2" C, 2 #6 SIGNAL SERVICE TYPE III CF SERVICE, SEE NOTE191 ELECTRICAL SERVICE, SEE NOTE ........ ........ ....... .............................. I .......... I ............... ........ 000 /--l)/-"Cb 2 2 jo g6 L�j 10,4 LU j p:;W, 0- M � 07M 0 ............... : 7 ........... ... ........... 06 ..... .................... 0 ............... . . ..... 06 .... ........ ... ... .......... 4 L0 0 L: .......... .......... ......... ... .... . . .... .......... ............ 0 SLOVER 06 0 to ..................... . ...... ................................. ........... ......... ...... ........... .............. ................ ...... ..... ............ ........... ............... ......................... ................ .......... ....... ..... ..... ............................................................................... .......... ........................................................ ............................................... .......... .............. 0 . .. . ............ .......... ...... ................. ...... ............. ........... .... ....................... ................. ............. ........................................ R I ....... ............................... .............................. ... ....... . . ..................................... A.SED P.A.VEMEN.T .. ............ ............. ... .......... ..... ........ ........ . ......... .. ......... ....... ...... ... .... .......... .............. .............. ....... ...... ........................... .......... ......... ..................................................... ............... ... ........... ............ .......... ................ ... ..................................................... ............................. ........................ ............... ............... A I/ C' r3clm IVI 0 178' TO STRIPING PLAN 4z 5 6 LIMIT LINE 0 T_ -1 .... ............ F - Q! F . ..... . . ................... .............. 0 .. .................. ............ ... .......... .17 . .... ..... .... . ............ .......... - ............... .. ...... ..... ... ....... ........... ...................... .. ....... f.. _ ......................... ................. ............................................ ....... AISED ISLAND ... ...................................... .............................................. ........... ............................... 0 1 [9�]­­­** ................. ... ................. ...................................... .............................................. ...... ............................. 0 Z_ z Zz�_ 0 0 05- Ld 0 0 7 ......................... ........... .... ... . ...... . . ........ ......................... . ..... ........................ ........... .......... ....................... ................. .......................... . ................. ...... ....... .................................. ........... ............ L .............. 1.1 ............. ... ........ .... ........ ........................... ...................... ..... .. ....... ....................... .............................. ­ .................................. . ... ................ . ....... .......... .................................... ..... ........ ......... ........................................... .................................. .................... .... .. ........ :1'1:L:::­:::­­.*��::::'* 1::- .... ............ . ....... ....... ........... . .............. ............ .................... .......... ................ .............. ........... .......... ...... .. .... ...... I ............ I ........... ................................... w. ............. j- . ........... T., ................. .......... ........... ............... J�­ 78 ...................... ................................. CN Ist LINE 3 1/2" C. 2 DLC 02 ................. .................................................................................... ........... ........................ ........................ ......................................................................................... .......... . ........................................................ .............. ............ ............................................ ....... ............. . ....... 0 ....................... ...................................... ............ CN .. ...... .. ............. ....... ............................ ............. .............. 02 TEMPORARY A.C. BERM LO .............. .......... ................ ................. ..... ................. .................. ..................... ..... .......... ............................... ...... ........ ..................................................... ..................................................... ....................... .................................. ................ ........ ................ ... .......................................... .... .................................. 01M ........... ....... ............. ......................................................... ........................... ............................ "71 Co 2 DLC 02 0 8 08 0.3 02 03 2 2 171 20 8 4 r Xi .0 ---- 4 00 5 00 04 6 =ohm mmm =am MW ECR I - I — ----I F 1 7 it ..................... ........... ......................................................................................................................... #1 rr__"� �Ijj RI — — I � � #6 / . 11 ',1 104 0 --J Uj 0 az 1 1/2' C, 1 DLC < FUITJRE _j EDGE OF 2-1� 04 PAVEMEN COIL FUTURE c) DLC FOR FUTI)RE 1—N PHASE 4 2—N1107 EDGE OF PAVEMENT: IN PULLBOX uj FUTURE Lj_ A 1—N 07 1 182 1 AA T B LLI LL1 LLJ 0 z W W D p oa:! ui y ESSI 0 0 A 0 C. B. C. R. Z LJ STANDARD PLACEMENT P. L___J L__J DETAIL FUTURE 1-104 OF �0�- 0" -Underground Service Al - erO Call: TOLL FREE 1 �800 422�413a 1 TWO WORKING DAYS 1 BEFORE YOU DIG 4) .1 RECORD DRAWING The information on this drawing is obtained from others and must be verified in the field by anyone orlor to Be or construction. HALL & FOREMAN, INC. 15 not M8001181ble for wwgF — Ilu do locations or depictions. All above ground be reaIy men ano Vow by tha pboos that i4md I -base ow. - -o FESS/0 4' <1_11 3170 REDHILL AVENUE COSTA MESA, CA 92626-3428 (714) 641-8777 rm , CIVIL ENGINE G LAND PLANNING LAND SURVEYING No. 41308 * Exp. 3/31/95 PREPA ER THE VI$ION OF: ok A A C V111. -44106,47 "'IT6COR0 4AY(5. AtWrR C. .7-4 OF rm.\� REVISIONS TN_G_R_rS_. DATE _C1 Ty DATE cf7ltl� e. 4"5.- 413,08 DATE: APPROVAL APPROVAL U') ............................. ........ ....... ....................................... �_"C 1 DLC 2 U) .............. . ........... .......... .......... ........... .......... ............................ ..................... .................. 345' TO - 7 LIMIT LINE ................................. .... ......... I ............. ------------ 6— CONSTRUCTION NOTES RAISED ISLAND (0 IS _1L_ N SCALE: 1'*=20* Ef] INSTALL AN 8 PHASE TYPE 90 CONTROLLER, ECONOLITE ASC—,8000, WITH SYSTEM TELEMETRY EQUIPMENT AND APPURTENANCES IN A TYPE jjPjj ALUMINUM CABINET PER CITY OF FONTANA STANDARDS. FOUNDATION TO EXTEND 18" ABOVE GRADE. C17Y TO 1,c1'fVV1P,5 rX&1A1&7'AM9 INSTALL 120/240 VOLT TYPE 111—CF SERVICE WITH 120 VOLT 50 AMP METERED SIGNAL CIRCUIT, AND 120 VOLT 30 AMP UNMETERED LIGHTING CIRCUIT. INSTALL ONE (1) TYP E V P.E. CONTROL UNIT. INSTALL TEST SWITCH ON LIGHTING CIRCUIT ONLY. INSTALL 3" P.V.C. SWEEP (SCHEDULE 30) FOR EDISON CONNECTION, PER EDISON COMPANY SPECIFICATION. INSTALL 1 1/2" CONDUIT WITH PULL BOXES AND PULL ROPE TO TELEPHONE VAULT AS DIRECTED BY PACIFIC BELL. PACIFIC BELL EMPLOYEES WILL EFFECT ACTUAL ENTRY INTO VAULT. INSTALL 4" DOUBLE YELLOW STRIPE WITHOUT RAISED PAVEMENT MARKERS FZ] INSTALL R 73-6 "NO U—TURN" SIGN ON MAST ARM PER CALTRANS STD. PLAN ES -6T. INSTALL ALL WIRES FOR FUTURE PHASES. INSTALL VEHICLE HEADS AS SHOWN, VEHICLE HEADS INSTALLED FOR FUTURE PHASES SHALL BE INACTIVE AND COVERED. INSTALL R-34 NO U TURN SIGN CITY OF FONTANA, CALIFORNIA PUBLIC WORKS DEPARTMENT DRAWN BY SCALE: Bi TRAFFIC SIGNAL PLAN HORIZ.: 1"=20' DESIGNED BY HG SLOVER AVE. & DRIVEWAY$ CHECKED BY PHASEval 9/9/91 SR JOB NO. io(osteq DR. N 0. SHT. NO. 4013-014 APPROVED L60 jj��� 0 ENGIffE_ 1ER_ clo, 2-0400 5 OF .- a