HomeMy WebLinkAbout2025-1R/W
QUANTITIES
O
CONST. 6" CURB AND GUTTER PER FONTANA CITY STD. NO. 101
60`
0
CONST. 41 SIDEWALK PER FONTANA CITY STD. NO. 105-A
30'
CONST. 4" A.. C. OVER o" A.B. PAVING (Assume 4" A. C. over native
for estimate purposes only. Actual paving thickness to be determined per
paving note No. 15 on Sheet No. 1) .
15,500 S.F.
12'
CONST. D/W APPROACH PER CITY STD. NO. 102
18'
O5
R1W
2' 4' 4` 2'
Mli�. I MIN.
SLOPE �� 1 SLOPE 12�
Ifo' 14'1, 1
j LEVEL ..LINE-� _ — — — / �•
3
3.
TYPICAL SECTIO[
SCALE: HORIZ. I"=10' VERT, 1"-2'
CREIGHTON CT.
a,
r! VIRO WY I
i O
R, I
RD
sirs
�s
RW-YAV a g
AY �
a RRY STLa IS L7- I
ST W RE$IO ST AE O z o 2 j
BARBEE ST p
rs
IS BAA E -
FOOTHI IL "'a _ 15 '` 8;r, BLVD
66' FOMTN+A i i $ VINE ST w. E
SOUAR£ IViNE ST CT VIMST
NZ =C=1V=TY I*I�
/'r► G�'f/ O /f
UTILITY NOTICE
CONSTRUCTION NOTES
QUANTITIES
O
CONST. 6" CURB AND GUTTER PER FONTANA CITY STD. NO. 101
640 L. F.
0
CONST. 41 SIDEWALK PER FONTANA CITY STD. NO. 105-A
3800 S. F.
CONST. 4" A.. C. OVER o" A.B. PAVING (Assume 4" A. C. over native
for estimate purposes only. Actual paving thickness to be determined per
paving note No. 15 on Sheet No. 1) .
15,500 S.F.
4
o
CONST. D/W APPROACH PER CITY STD. NO. 102
10 EA.
O5
INSTALL STREET LIGHTS APPROVED 5Y S.C.E.
_
1 EA.
t
CONST. SIDEWALK CULVERT PER DETAIL SHEET 2,
1 EA.
O
Construct V -Gutter per detail Sheet 2
®
ADTU5-T,.,.MP"HOLC TO GRJ'cDE
2 EA
O
CONS7RuC? B" A•G• DIKC
720 L.:=.
-
[/151..�4 3 2 1
�CREIGHTON CT.
+I 6 1 7 I 8 I 9 I 10
AB 73 requires every person planning to conduct excavation notify a regional
notification center at least two days prior to excavation and, if practical, the
areas to be excavated shall be cblineated . A verification number will be given
upon such notification without which any permit or -directive giving permission
to excavate shall be invalid. Verification numbers expire in 14 days. For best
communication, persons performing excavation should meet the utility companies
at the job site. For more information you can contact the local regional infor-
mation center.
Underground Service Alert
3030 Saturn Street, S-200
Brea, CA 92621
(800) 422-4133
I
SCALE : 1 - led
INDEX IAP
� �ti
9n-4-i
PREPARED 'UNDER SUPERVISION OF:
.1
- __ I ".. 6-12-
MOLO4,6PTA DATE
RCE NOS 31706
CALL UNDER GROUND
SERVICE ALERT
9548 HOURS BEFORE YOU DIG
David Crosswhite and associates
.r ���� ��� � engineering Surveying Planning
1802 Commercenter West, Suite H (714)381-9575
San Bernardino, CA 92408 FAX (714)888-7988
1/4'R 2
_-� SLOPE 1/4": 1' -�
U
U = /
I cN
aIr
'
U ' V4 a
PROTECTION BAR 3/4° 0 GALVANIZED
% I/2° RW,ND STIRRUP
GUTTERFL(7JV
a LINE r
' °x I'-1� SUPPORT BOLT
(ALHAMBRA FOUNDRY A-1572 OR EQUAL)
124
OPTIONAL HOOK
A.
I B
r '
STEEL ANGLE 8iSUPP+ORT BOLT DETAIL
6°MIN.
*105
OPTIONAL ANCHOR
(1/2"x fi" STUDS)
UEV16GALV. STEEa
ANGLE 3I/2" 1/2�� 0 STEEL ANCHOR AT 3�-0� O.C.(MAX.) ;
LENGTH SHALL BE OPENING WIDTH PLUS 12 INCHES
STEEL ANGLE ANCHOR
NOTES: I
I. A PLAIN ROUND GALVANIZED STEEL PROTECTION BAR 3/4" IN DIA. SHALL BE
INSTALLED AND EMBEDED 6"AT EACH END.
2. ALL EXPOSED METAL PARTS SHALL BE GALVANIZED. (EXCEPT FRAME AND COVER)
3. SUPPORT BOLTS SHALL BE UNIFORMLY SPACED BUT NOT TO EXCEED 7'ON CENTER.
4• STEEL ANGLE SHALL BE BENT TO MATCH CURB ALIGNMENT.
\-._. 4 .
SAN BERNARDINO COUNTY TRANS. DE PT.
CATCH BASIN
L. J. F. 12 -7.4 John R. Shone OPENING 2�B CI '
Director of Transportation
N
�I
ASID C 1 i,yOF .F0N l'AA1 A STD , bETA)L 1241
r
IT
is
'i
I,
53
BASIS OF BEARINr.5':
THE CENTERL INE OF LOCUS T AVENUE* PER PARCEL
IMP NO. 8975, P. 11. B. 95/7, B BEING N 00. 1 O' J8" I/
4
/ 4
BENCH MARIA:
P. K. Nail in top of south curb Miller St.
0.9' west of southwest curb return at Alder
and Miller.
Elevation: 1358.21
RILVISZONS :
1 DES CRIPTI
r
GENERAL NOTES (STREET) :
1. All work shall be done in accordance with theseplans and the City of Fontana
Public Works Department standard specifications dated 1975.
2. Construction permits shall be obtained from the Fontana Public Works Department
prior to start of any work within the city limits.
3. Adequate stakes shall be set by the Engineer to enable the contractor to
construct the work to the plan grades.
4. All pipes or substructures of any kind and all telephone or power poles, water
meters, valves, hydrants, irrigation structures, etc., shown or not shown on
this plan and located within areas to be improved and interfering with
construction, shall be relocated by others; it shall be the contractor's
responsibility to notify all of the agencies concerned before construction begins.
5. As -built plans shall be provided to the City by the Contractor.
6. All Utility companies shall be given 48 hours notice prior to working around
their facilities.
7. All backfill to be certified by Soils Engineer.
8. All materials and methods to be subject to the approval of the City Engineer.
9. Backfill materials to have a S.E. of 30 (min.) and min. compaction of 90%.
10. All new or existing valve cans and manholes shall be adjusted to grade during
paving
11. Contractor to install pavement markings and striping as required by the
City Engineer.
12. Contractor shall not operate any main line water valve on existing waterlines.
13. If existing utilities or other facilities conflict with the proposed improvements,
work shall stop and the engineer notified immediately.
14. It shall be the responsibility of the Contractor to notify the engineer after the
base course has been constructed and before the paving has been installed
so that the engineer may install the street centerline monuments as required
by the city code of the City of Fontana.
15. Pavement sections shown are minimum and subject to revision and approval of
the City as required by soilstest taken after completion of rough grading.
PRIVATE ENGINEER'S NOTE
THE PRIVATE ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR ASSURING THE
ACCURACY AND ACCEPTABILITY OF THE WORK HEREON. IN THE EVENT OF DISCREPANCIES
ARISING DURING CONSTRUCTION, THE PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR
DETERMINING AN ACCEPTABLE SOLUTION AND REVISING THE PLANS FOR APPROVAL BY THE
CITY. '
PRIVATE ENGINEER'S NOTICE TO CONTRACTORS
TAE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY FOR ALL PERSONS
AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND
NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR
SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN
CONNECTION WITH THE PERFORMANCE OFWORK ON THIS PROJECT, ,
EXCEPTING FOR LIABILITY ARISING PROM THE SOLE NEGLIG.ENCE OF THE
OWNER OR THE ENGINEER. a
THE EXISTING AND LOCATION OF ANY UNDERGROUND UTILITIES OR
STRUCTURES SHOWN ON THESE PLANS ARE -OBTAINED BY A SEARCH OF
AVAILABLE RECORDS, TO THE BEST OF OUR KNOWLEDGE, THERE, ARE NO
EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. TH1: `
CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO
PROTECT THE UTILITIES SHOWN, AND ANY OTHER •LINES OR STRUCTURES
NOT SHOWN ON THESE PLANS, AND IS SOLELY RESPONSIBLE FOR THE PROTECTION
OF, AND ANY DANIAGE TO, ANY EXISTING IMPROVEMENTS.
CITY OF FONTANA
8353 SIERRA AVENUE
FONTANA, CALIFORNIA 92335
TELEPHONE (714)350-7610
SO. CALIF, GAS COMPANY -DISTRIBUTION FACILITIES
570 4TH STREET, P.O. BOX 6226
SAN BERNARDINO. CALIFORNIA 92408
TELEPHONE (714)884-9411 OR (800)422-4133 V.S.A. GENERAL TELEPHONE COMPANY
SO. CALIF. GAS COMPANY -TRANSMISSION DEPARTMENT 245 N. MOUNTAIN VIEW AVENUE
2191 BIRCH STREET POMONA, CALIFORNIA 91766
BREA, CALIFORNIA 92621 TELEPHONE (213)357-2257 OR ( 800) 422•-4133 U. S. A.
TELEPHONE (714)529-2889 OR (800)422-41.33 U.S.A. SAN BERNARDINO COUNTY FLOOD CONTROL DISTRICT
SOUTHERN CALIFORNIA EDISON COMPANY 825 EAST ,THIRD STREET
1351 E. FRANCIS AVENUE, P.O. BOX 513 SAN BERNARDINO, CALIFORNIA 92408
ONTARIO, CALIFORNIA 92621 TELEPHONE (714)383-1665
TELEPHONE (714)947 -2996 -UNDERGROUND POWER PACIFIC TELEPHONE b TELEGRAPH COMPANY
(714')875 -5100 -TRANSMISSION 3073 ADAMS STREET
(213)637 -1233 -PIPELINES, OR RIVERSIDE, CALIFORNIA 92504
( 800) 422-4133 U. S. A. TELEPHONE (714)359-2585 OR (BOO)422-4133 U. S- A.
EXi's DJ1'i'E "PMVIM DhT19 CITY, OF FONTANA,? CALIFORNIA
PUBLIC WORKS DEPARTMENT
DRAW BY:
STREET /MP1?0VEMENT PLAN sc-A"
IGNM ter : TRACT 1DATE:
�.z ,�,� 7 -ZZ -7/
DY: APPR•OWD DRW . #
T-1 OX, • , . CITY ENGINE= RGE
i•
f`
[/151..�4 3 2 1
�CREIGHTON CT.
+I 6 1 7 I 8 I 9 I 10
AB 73 requires every person planning to conduct excavation notify a regional
notification center at least two days prior to excavation and, if practical, the
areas to be excavated shall be cblineated . A verification number will be given
upon such notification without which any permit or -directive giving permission
to excavate shall be invalid. Verification numbers expire in 14 days. For best
communication, persons performing excavation should meet the utility companies
at the job site. For more information you can contact the local regional infor-
mation center.
Underground Service Alert
3030 Saturn Street, S-200
Brea, CA 92621
(800) 422-4133
I
SCALE : 1 - led
INDEX IAP
� �ti
9n-4-i
PREPARED 'UNDER SUPERVISION OF:
.1
- __ I ".. 6-12-
MOLO4,6PTA DATE
RCE NOS 31706
CALL UNDER GROUND
SERVICE ALERT
9548 HOURS BEFORE YOU DIG
David Crosswhite and associates
.r ���� ��� � engineering Surveying Planning
1802 Commercenter West, Suite H (714)381-9575
San Bernardino, CA 92408 FAX (714)888-7988
1/4'R 2
_-� SLOPE 1/4": 1' -�
U
U = /
I cN
aIr
'
U ' V4 a
PROTECTION BAR 3/4° 0 GALVANIZED
% I/2° RW,ND STIRRUP
GUTTERFL(7JV
a LINE r
' °x I'-1� SUPPORT BOLT
(ALHAMBRA FOUNDRY A-1572 OR EQUAL)
124
OPTIONAL HOOK
A.
I B
r '
STEEL ANGLE 8iSUPP+ORT BOLT DETAIL
6°MIN.
*105
OPTIONAL ANCHOR
(1/2"x fi" STUDS)
UEV16GALV. STEEa
ANGLE 3I/2" 1/2�� 0 STEEL ANCHOR AT 3�-0� O.C.(MAX.) ;
LENGTH SHALL BE OPENING WIDTH PLUS 12 INCHES
STEEL ANGLE ANCHOR
NOTES: I
I. A PLAIN ROUND GALVANIZED STEEL PROTECTION BAR 3/4" IN DIA. SHALL BE
INSTALLED AND EMBEDED 6"AT EACH END.
2. ALL EXPOSED METAL PARTS SHALL BE GALVANIZED. (EXCEPT FRAME AND COVER)
3. SUPPORT BOLTS SHALL BE UNIFORMLY SPACED BUT NOT TO EXCEED 7'ON CENTER.
4• STEEL ANGLE SHALL BE BENT TO MATCH CURB ALIGNMENT.
\-._. 4 .
SAN BERNARDINO COUNTY TRANS. DE PT.
CATCH BASIN
L. J. F. 12 -7.4 John R. Shone OPENING 2�B CI '
Director of Transportation
N
�I
ASID C 1 i,yOF .F0N l'AA1 A STD , bETA)L 1241
r
IT
is
'i
I,
53
BASIS OF BEARINr.5':
THE CENTERL INE OF LOCUS T AVENUE* PER PARCEL
IMP NO. 8975, P. 11. B. 95/7, B BEING N 00. 1 O' J8" I/
4
/ 4
BENCH MARIA:
P. K. Nail in top of south curb Miller St.
0.9' west of southwest curb return at Alder
and Miller.
Elevation: 1358.21
RILVISZONS :
1 DES CRIPTI
r
GENERAL NOTES (STREET) :
1. All work shall be done in accordance with theseplans and the City of Fontana
Public Works Department standard specifications dated 1975.
2. Construction permits shall be obtained from the Fontana Public Works Department
prior to start of any work within the city limits.
3. Adequate stakes shall be set by the Engineer to enable the contractor to
construct the work to the plan grades.
4. All pipes or substructures of any kind and all telephone or power poles, water
meters, valves, hydrants, irrigation structures, etc., shown or not shown on
this plan and located within areas to be improved and interfering with
construction, shall be relocated by others; it shall be the contractor's
responsibility to notify all of the agencies concerned before construction begins.
5. As -built plans shall be provided to the City by the Contractor.
6. All Utility companies shall be given 48 hours notice prior to working around
their facilities.
7. All backfill to be certified by Soils Engineer.
8. All materials and methods to be subject to the approval of the City Engineer.
9. Backfill materials to have a S.E. of 30 (min.) and min. compaction of 90%.
10. All new or existing valve cans and manholes shall be adjusted to grade during
paving
11. Contractor to install pavement markings and striping as required by the
City Engineer.
12. Contractor shall not operate any main line water valve on existing waterlines.
13. If existing utilities or other facilities conflict with the proposed improvements,
work shall stop and the engineer notified immediately.
14. It shall be the responsibility of the Contractor to notify the engineer after the
base course has been constructed and before the paving has been installed
so that the engineer may install the street centerline monuments as required
by the city code of the City of Fontana.
15. Pavement sections shown are minimum and subject to revision and approval of
the City as required by soilstest taken after completion of rough grading.
PRIVATE ENGINEER'S NOTE
THE PRIVATE ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR ASSURING THE
ACCURACY AND ACCEPTABILITY OF THE WORK HEREON. IN THE EVENT OF DISCREPANCIES
ARISING DURING CONSTRUCTION, THE PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR
DETERMINING AN ACCEPTABLE SOLUTION AND REVISING THE PLANS FOR APPROVAL BY THE
CITY. '
PRIVATE ENGINEER'S NOTICE TO CONTRACTORS
TAE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY FOR ALL PERSONS
AND PROPERTY, THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND
NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR
SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN
CONNECTION WITH THE PERFORMANCE OFWORK ON THIS PROJECT, ,
EXCEPTING FOR LIABILITY ARISING PROM THE SOLE NEGLIG.ENCE OF THE
OWNER OR THE ENGINEER. a
THE EXISTING AND LOCATION OF ANY UNDERGROUND UTILITIES OR
STRUCTURES SHOWN ON THESE PLANS ARE -OBTAINED BY A SEARCH OF
AVAILABLE RECORDS, TO THE BEST OF OUR KNOWLEDGE, THERE, ARE NO
EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. TH1: `
CONTRACTOR IS REQUIRED TO TAKE ALL PRECAUTIONARY MEASURES TO
PROTECT THE UTILITIES SHOWN, AND ANY OTHER •LINES OR STRUCTURES
NOT SHOWN ON THESE PLANS, AND IS SOLELY RESPONSIBLE FOR THE PROTECTION
OF, AND ANY DANIAGE TO, ANY EXISTING IMPROVEMENTS.
CITY OF FONTANA
8353 SIERRA AVENUE
FONTANA, CALIFORNIA 92335
TELEPHONE (714)350-7610
SO. CALIF, GAS COMPANY -DISTRIBUTION FACILITIES
570 4TH STREET, P.O. BOX 6226
SAN BERNARDINO. CALIFORNIA 92408
TELEPHONE (714)884-9411 OR (800)422-4133 V.S.A. GENERAL TELEPHONE COMPANY
SO. CALIF. GAS COMPANY -TRANSMISSION DEPARTMENT 245 N. MOUNTAIN VIEW AVENUE
2191 BIRCH STREET POMONA, CALIFORNIA 91766
BREA, CALIFORNIA 92621 TELEPHONE (213)357-2257 OR ( 800) 422•-4133 U. S. A.
TELEPHONE (714)529-2889 OR (800)422-41.33 U.S.A. SAN BERNARDINO COUNTY FLOOD CONTROL DISTRICT
SOUTHERN CALIFORNIA EDISON COMPANY 825 EAST ,THIRD STREET
1351 E. FRANCIS AVENUE, P.O. BOX 513 SAN BERNARDINO, CALIFORNIA 92408
ONTARIO, CALIFORNIA 92621 TELEPHONE (714)383-1665
TELEPHONE (714)947 -2996 -UNDERGROUND POWER PACIFIC TELEPHONE b TELEGRAPH COMPANY
(714')875 -5100 -TRANSMISSION 3073 ADAMS STREET
(213)637 -1233 -PIPELINES, OR RIVERSIDE, CALIFORNIA 92504
( 800) 422-4133 U. S. A. TELEPHONE (714)359-2585 OR (BOO)422-4133 U. S- A.
EXi's DJ1'i'E "PMVIM DhT19 CITY, OF FONTANA,? CALIFORNIA
PUBLIC WORKS DEPARTMENT
DRAW BY:
STREET /MP1?0VEMENT PLAN sc-A"
IGNM ter : TRACT 1DATE:
�.z ,�,� 7 -ZZ -7/
DY: APPR•OWD DRW . #
T-1 OX, • , . CITY ENGINE= RGE