Loading...
HomeMy WebLinkAbout2005-11. 2. 3. 4. 5. IL 7. _..-....__............. _ _ _ __ _ ...... _ W.._.._........_ —. .� . 4, + ../..............-----........_......_..................... ZJL -..— .................... .......................... .......................... ..... .y................ ......................... ............ EXISTING CURB & GUTTER ALL WORK, MATERIAL AND EQUIPMENT FOR TRAFFIC SIGNING AND STRIPING SHALL CONFORM TO THESE PLANS AND THE STANDARD SPECIFICATIONS FOR CITY OF FONTANA AND THE STANDARDS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA. PAfNTt1 Pftf)MOURE 5"ALL TO THE STS SP€C1F1CAT9A4S AND RE UIREMENTS OF TWESE NOTES. PAVEMENT MARKERS AND TRAFFIC LINES (STRIPING) DIMENSIONS SHALL CONFORM TO CALTRANS TRAFFIC MANUAL.. PAVEMENT LEGENDS AND ARROWS SHALL CONFORM TO CITY STANDARD MIWNTENANCE STENCILS. TRAFFIC STRIPES AND PAVEMENT MARKINGS ON NEW SURFACING SHALL BE APPLIED IN TWO (2) SEPARATE COATS. THE SECOND COAT TO BE APPLIED WITHIN 30 DAYS OF ACCEPTANCE OF STREETS. PAINT FOR TRAFFIC STRT•P1NG, CROSSWALKS, LIMIT LINES, ARROWS, PAVEMENT LEGENDS, AND CURB MARKINGS SHALL BE RAPID DRY TYPE PER SECTION 84-3 OF THE STANDARD SPECIFICATIONS. REFLECTIVE MATERIAL SHALL BE APPLIED TO ALL TRAFFIC STRIPES (EXCEPT . BLACK PAINT) ON THE FINAL FINISH COAT PER SECTION 84-3 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA AND CITY OF FONTANA. THE CONTRACTOR SHALL FURNtSH THE NECESSARY CONIROL POTN'TS FOR ALL STRIPING AND MARKING AND SHALL BE RESPONSIBLE FOR THE COMPLETENESS AND ACCURACY THEREOF TO THE SATISFACTION Of THE CITY ENGINEER. _;\ 49 SHOWN HEREON CORRESPOND TO THE CALTRANS SPECIFICATION SHEET ! CODES. SIGNS SHALL BE THE STANDARD SIZE UNLESS OTHERWISE INDICATED, !. MATERfALS FOR S#G", POSTS, AND MOUNTING H"DW' Lr, Steri CONSTRUCTION AND SIGN PANEL INSTALLATION SHALL CONFORM TO HOS – STW & TRAFFIC SIGN DIMENSIONS, COLOR, AND LETTERING SHALL CONFORM Nl ! 51+00 _ BEGIN 25CP. CHERRY AVEN__ UE f i , ffl��% no I ��17� CUA! t GUTTER EX1STnrC ctllM R CUTVIA TO CALTRANS APPROVED SIGN SPECIFICATION SHEETS. SIGN CODES SHOWN HEREON CORRESPOND TO THE CALTRANS SPECIFICATION SHEET CODES. SIGNS SHALL BE THE STANDARD SIZE UNLESS OTHERWISE INDICATED, !. MATERfALS FOR S#G", POSTS, AND MOUNTING H"DW' Lr, Steri CONSTRUCTION AND SIGN PANEL INSTALLATION SHALL CONFORM TO HOS – STW SECTION 56-2 OF THE CALTRANS STANDARD SPECIFICATIONS. THE LOCATION OF STOP BARS SHALL BE CHECKED AND APPROVED 10. SIGNS SHALL BE MOUNTED ON METAL BOX SECTION POSTS UNLESS BY THE CITY INSPECTOR PRIOR TO STRIPING, OTHERWISE INDICATED. POSTS AND INSTALLATION SHALL MEET CITY REQUIREMENTS. RECORD DRAWING � 11. THE QUANTITY OF TRAFFIC SIGH AND STRWtNG SHALL BE TM information on this drav�ring is obtained from otiers and CONSIDERED ONE LUMP SUM ITEM COMPLETE IN PLACE. THE LUMP S+WrN must he verified in i+ e f;erc�-� byanYo^P prig to use or PRICE IN THE BID SHALL INCLUDE FULL COMPENSATION FOR COnStrijGtion. HALL F� FOn:�E�4�Ai�l, INC.isnot responsible for a— FURNISHING ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT FOR underground facility locations �r depictions. ,. �. All above ground DOING ALL WORK INVOLVED IN, OR APPURTENANT TO, THE faciWties can be ready seen and V..11t."Ted by the parties that INSTALLATION OF TRAFFIC LINES AND/OR MARKINGS AND/OR MARKERS to use sem. AND TRAFFIC SIGNS AS REQUIRED BY THESE PLANS. ALL COSTS FOR TEMPORARY PAVEMENT PAINTING, INCLUDING COSTS FOR SANDBLASTING OF EXISTING LINES AND MARKINGS, AND TPF E REMOVAL 1 CONSTPhicTm INSTAL W--74 "TH14U TI111FM ME11K LEF r 2 INSTALL R-18 "RIGHT LANE MUST TURN RIGHT” 3 PAINT DIRECTION ARROW PAVEMENT MARKINGS R-18 5 RELOCATE W-74 TO STA 36+15 EXISTING W-74 R/R CROSSING ' EXISTING R-7 do K MARKER 8 EXtSTNO W--17 STOP AHW TO 9E REVOYED AND REPLACE W-41 & LEGEND 430' FROM UUIT LINE 9 EXISTING R-18 RIGHT TURN ONLY TO BE REMOVED AND RELOCATED AT STA 51+00 i" SF�E BASEUNE INTERW ; ExlsnN�c R-, sroP A140 srI�ET NAME STRIPING PLAN 11 REM (NAL OF EXISTING STOMPS TO ®f COORDINATED THROUGH CITY OF FONTANA TRAFFIC (SEE NOTE 12) EXISTING DIRECTIONAL ARROW PAVEMENT MARKINGS 2 s' EXtS"TIM SiWIWC ' 14 P MARKING TO TO 8E TED OFF EXISTING 1 CUNT 15 PAINT fr SOLID WHITE LINE 16 PAINT 1 f STOP BAR (SEE NOTE – STOP BAR) i EXISTM GUARDRAIL 18 PAINT PAVEMENT MARKING 1 I 19 INSTALL W-57 I 20 INSTALL W-41 dt LEGEND 430'' FROM LtMfT LINE I FUTURE DEVELOPMENT INSTALL W-41 LEGEND 5W FROM L"T UNE 22 INSTALL W-41 dt LEGEND 350' FROM LIMIT LINE 23 PAINT 1f WHITE CROSSWALK <;� 1 2i4 PAINT A' SOLI© MNTE LINE 2 TYPEK4 J MARK P RAN D -7 STD. W (14 TOTA L six1 2 X: :,,/, EDC" Ir ;. 1.,�. __-- -- - ,-.........�_.................. f Q C, ,.,�_Y.... ..... .........._._--- 1 4— ... ........._....�........ ........... SL 55 ST--------....... ^..---------- ._....... ._......._._.__--- _------------ T _-r_ 54 ; % % - .......................... 1 ..... /-............ ................... _ - s..-...... ... 2 ' RFHINO GUARD RAIL j /'.! rtl { \. a i f • ijs .................+............ a.. FUTURE ?EVELOPMEN r / f 3 EXISTING � # F F / QROFESsjo GRAPHIC SCALE 4 , 20 49 � 2 N�.6� ,�, ( IN FZET i * EXP- 3/'3 1 imb _ 40 ft 21 or ,�t��� SEE BASELINE INTERIM STRIPING PLAN no DATE: 5/6/91 CITY OF FONTANA, CALIFORNIA Y,,,, MAN „�. WL Al„� �„a,�;,�, � PUBLIC WORKS DEPARTMENT 12. All REMOVAL OF SIGNS SHALL 8E COORDINATED WITH THE CITY Of ��� KD DRAWN BY INTERIM SIGNING & ST PING PLAN.. SCALE: FONTANA AND SHALL REMAIN PROPERLY OF THE CIN OF FONTANA, � �' HORIZ.: 10=4a SOME ITEMS SHALL 8E REMOVES 8Y THE CIN OF FONTANA - CONTRACTOR COSTA REDINLL AVENUE C05MESA. G 92626-3424 (714)s4 ) 1 -ens �W� By CHERRY AVENUE TO COORDINATE WITH TRAFFIC SECTION AT THE CITY OF FONTANA. CIVIL ENGINEERING LAND PLANNIfN • LAND SURVEYINi CHECKED 8Y DATE: HARRY CHIIDRESS (71 t) 363-7617 PREPARED UNDER THE SUPERVISION OF: J.C.H. AT BASE LINE AVENUE MAY 7o 1991 .once "AmRO aR[VAC wMa 1-0 - g •y.iL S _ , - J08 N0. 47M!kr% DR. N0. SNT. NO. REVISIONS APPROV � DATE APPROVAL TY DATE H A DATE: 9 � 3W�0� APPROVED INEER 26690 �I �� 2.00s 1 � j MAY 4 '4".'' J.N. 38007020