HomeMy WebLinkAbout2004-1_4
1270+..
1270 12 6 0 t
1260
L
4•
4
3+00 4+00 5+00 6+00
7+00 8+00
100 F
)0 60 40 20 0 SCALE: I"s 40'
GRAPHIC SCA! E }N FEET
k -
R
N
ex. a*
-of
CRISS A VENUE
*w�z . za.�T.G I -3 /.744 m rA
FOR SINGLE FAAILY PLAN REVISIONS GENE10L NOTES
1. T'11,* construction of III public unproven nts shall conform to these'. S. Care should be taken to prevent grades, ditches and swal'iss from
plans and to the City standard s-,,#cificatlons, Public Works' undermining street imprIcy"wnts. -Upon inspection of the site, the
�.;
?1%
*par*,r-ant. City of Fontana. Kof*r to definitions and terms init City Englreetr say require temporary gunite swales, entering or
City standard specifications. I
Itavirg Improve-s*ntS.
2. Excavation and construction p*r-aits shall be ottaired fry Fontana! 6. All exposed concrete surfaces shall confors in grade, color and
Public Works Oapiart-wnt prior to start of any within t,,A City
0 finish to all adjoining curbs and sidewalks.
3. Locations of public utilities shown have been dttaminwd from 7. Starilant required under all AC p&vwwmt.
have
avai table inforzation. However, it shall be the responsibility of g. All P&v*gWftt or concrete romvels shall be saw cut.
the contractor to determine the true location and elevation in the
Feld of any existing ut 411 i t, as and to exert: 1 ri a ;,roper precautions P A'r EM D(T 1W T ES
to avoid ln.4jry or daitage t1lersto. Cw-�ntractor shall cc-itact
Underground Service Alart for utility 1-_<ation before excavation 1. The City. Public Works Irspector may require at his/"Ir C'm
at 1-800-422-4133. discretion, that the contractor submit a soils report with
4. Protective measures shall b* taken by the Contractor so as not to calculated *1*'values UW gravel equivalents for the verification
cause any mud, silt or debris to b* deposited onto public or of a proper pavexant thickness.
adjacent property at all t1 Ms during construction. Any mud or
debris on public property shall b* rmcv*4 itnloWiataly. Dust 2. Pavement sections shown are minium and subject to revision and
shall be controlled by watering or other approval method thrcu%M- approval Of the City as may be required by soils test taken after
out the grading and construction operations. cm*letlon of rough grading.
CD
.............
0°00,15" W 4M
25
% I
cc
Q:
50
BENCH MARK
B. M. NO. 610 TOP F. H. N/S
ARROW BLVD OPPOSITE
CRISS AVE.
ELE V. 1278.28
REV. I DATE
J#
li
50'
DESCRIPTION
00,
6
-SS Z, AEF AWVVA'
CWJ 4(44err,&9 3
CRISS 4V E. — TYPICAL SECT Ir)&
6ETK,EE0V STA 4 + 80 a STA 6 +00
N. T S.
PROJECT SITE
*P.AWW st va ff
0C D
J 09-sey 1IT
4C(
z
RIP
V i C I N I T Y MA P
%140 CITY OF FONTANA', C ALIFORM 1 A
PUBLIC WORKS DEPARTMENT
03"71
DRAWN BY, STREET PLAN
SCALE-
•
Exam 9-30-91 Av%f L NR I "—
0— 1 C R I S S AVENUE IV FZ �
CIVIV DESIGNED BY. FROM 4EO' SIC ARROW BLVD TO 600' DATE
0
AWL S/0 A 8L VD.
OF
CHECKED BY: APPROVED �WS NO SHEET
Cl y R C.
DATE, DEP. I CITY EER I OF I
JOB&_.—.
4i
UT I L I TY. NOT I F I CAT] ONS
WATER:
SM WRIEL VA6,LLEY WATER CQNPANY
11142 "AVEY AVENIM
EL MONTE, CA 91734
13) "S-6193
SEWER:
C'ATY OF 60TAM
8353 SIERRA AVEWt
FCWTAKA, CA 52335
(714) 350-7640
POWER:
SOUTHERN CALIFORNIA EDISON COMPANY
P. 0. BOX 7U
300 N. PEPPER STREET
RIALTO, CA 9ZZ376
ATTN: DAVID JONES
(714) 820-5191
GAS:
SOUTHERN CALI=ORNIA US COMPANY
16231 VALLEY ILYD.
FONTAKA, CA 92335
MR. LOU WESTFALL
(714) U2-971 I
SOVTWERN'CALI FORNIA, US COKPANY
TRANSMISSION DIVISION
2191 E. 6IRCJ%-,o STREET
NAEA s CA 97621
(714) 529-2B&9
TELEPHONE: ra EX EM TELE_ r" E
9,D HEL" AVENUIE
RANCHO COCAMOKA, CA 9-.730
(714) 945-3542
PACIFIC 31tL
3939 E. CORODM" STREET
AAMEINq CA 92807
(714) 999-%39
CONSTRUCTION NOTES QUANTITIES
CONST 6" PC,C. CURB a GUTTER PER CITY' STD. DETAIL 101.
IPO
S
C 0 NST 4" PC.C. SIDEWALK PER CITY STD. DETAIL 105- A
220
S. K
CONST 4`8 A.C. PAVEMENT OVER COMPACTED N4TIVE SO/ L .
5
T OWNS
.4
#
CONST 4" PC*'ft0."#'. DRIVEWAY, Wz 12'PER CITY STD. DETAIL 102
2
F.AI=H
5
COJ&!S T 4" V C P HOUSE CONNEMON. PER CITY STD. DETAILS
12 5 a 131
2
EACH
0
SAW CUT
12 0
L.F.
00,
6
-SS Z, AEF AWVVA'
CWJ 4(44err,&9 3
CRISS 4V E. — TYPICAL SECT Ir)&
6ETK,EE0V STA 4 + 80 a STA 6 +00
N. T S.
PROJECT SITE
*P.AWW st va ff
0C D
J 09-sey 1IT
4C(
z
RIP
V i C I N I T Y MA P
%140 CITY OF FONTANA', C ALIFORM 1 A
PUBLIC WORKS DEPARTMENT
03"71
DRAWN BY, STREET PLAN
SCALE-
•
Exam 9-30-91 Av%f L NR I "—
0— 1 C R I S S AVENUE IV FZ �
CIVIV DESIGNED BY. FROM 4EO' SIC ARROW BLVD TO 600' DATE
0
AWL S/0 A 8L VD.
OF
CHECKED BY: APPROVED �WS NO SHEET
Cl y R C.
DATE, DEP. I CITY EER I OF I
JOB&_.—.