HomeMy WebLinkAbout1974-1I T
t
I
r
+
IL
IN
A4,rla v Apeome
IM,
-index
Ole/ Ao scale,
t6krry Awntle,
f .
2.T�_i DRi
IMP
C=
Yielln'dv Moo
Q_UIPMENT FOR TRAFFIC SIGNING AND STRIPING SHALL
ALL WORK, MATERIAL AND E
CONFORM TO THESE PIANS AND THE STANDARD, SPECIFICATIONS- FOR CITY- OF
FONTANA AND THE STANDARDS AND SPEtIFICATIONS OF THE STATE OF
CALIFORNIA.
2, PAINTING PROCEDURES SHALL CONFORM TO THE STANDARD SPECIFICATIONS
AND THE REQUIREMENTS OF THESE GENERAL NOTES.
31 PAVEMENT MARKERS AND TRAFFIC LINES (STRIPING) DIMENSIONS SHALL
CONFORM T6CALT14ANS TRAFFIC MANUAL.
4. PAVEMENT LEGENDS AND ARROWS SHALL CONFORM TO CITY STANDARD
MAINTENANCE STENCILS.
5. TRAFFIC STRIPES AND PAVEMENT MARKINGS ON NEW SURFACING SHALL BE
APPUED IN TWO (2) SEPARATE COATS. IN FUTURE ADD - THE SECOND COAT TO BE
APPLIED WITHIN 30 DAYS OF ACCEPTANCE OF STREETS.
6. PAI'NT FOR TRAFFIC STRIFING, CROSSWALKS, LIMIT LINES, ARROWS, PAVEMENT
LEGENDS, AND CURB MARKINGS SHALL BE RAPID DRY TYPE PER SECTION 84.3 OF
THE STANDARD SPECIFICATIONS. REFLECTIVE MATERIAL SHALL BE APPLIED TO ALL
TRAFFIC STRIPES (EXCEPT BLACK PAINT) ON THE FINAL FINISH COAT PER'SECTION
64-3 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA AND CITY
OF FONTANA.
7. EXISTING TRAFFIC STRIPES AND MARKINGS THAT 00 NOT CONFORM TO TH E PLANS
SHALL BE REMOVED BY WET SANDBLASTING.
8. THE CONTRACTOR SHALL FURNISH THE NECESSARY CONTROL POINTS FOR ALL
STRIPING AND MARKING AND SHALL BE RESPONSIBLE -FOR THE COMPLETENESS
AND ACCURACY THEREOF TO THE SATISFACTION OF THE CITY ENGINEER.
19. SPOTTING SHALL BE:COMPLETED PRIOR TO THE REMOVAL OF ANY EXISfING
STRIPES. EXISTING STRIPES AND MARKINGS SHALL BE REMOVED PRIORJO
PAINTING NEW ONES,. BUT IN NO CASE SHALL ANY SECTION OF THE $TREEf BE
LEFT WITHOUT PROPER STRIPING FOR MORE THAN 24 HOURS, OR OVER
*EEKENDS AND HOLIDAYS.
10. TRAFFIC SIGN DIMENSIONS, COLOR, AND LETTERING SHALL CONFORM'TO
CALTRANS APPROVED SIGN SPECIFICATION SHEETS. SIGN CODES SHOWN
HEREON CORRESPOND TO THE CALTRANS SPECIFICATION SHEET CODES. SIGNS
-SHALL BE THE STANDARD SIZE UNLESS OTHERWISE INDICATED.
11, MATERIALS FOR SIGNS, POSTS AND MOUNTING HARDWARE, SIGN CONSTRUCTION
AND SIGN PANEL INSTALLATION SHALL CONFORM TO SECTION 56-2 OF THE
-CALTRANS STANDARD SPECIFICATIONS.
12. SIGNS SHALL BE MOUNTED ON METAL BOX SECTION POSTS.UNLESS OTHERWISE
INDICATED.'POSTS AND INSTALLATION SHALL MEET CITY REQUIREMENTS.
13. THE QUANTITY OF TRAFFIC SIGNING AND STRIPING SHALL BE -CONSZERED.-ONE
LUMP SUM ITEM COMPLETE IN PLACE. THE LUMP SUM PRICE IN THE BID SHALL
INCLUDE FULL COMPENSATION FOR FURNISHING ALL LABOR, MATERIALS,. TOOLS
AND EQUIPMENT FOR DOING ALL WORK INVOLVED IN, OR APPURTENANT TO, THE
INSTALLATION OF TRAFFIC LINES AND/OR MARKINGS AND/OR MARKERS AND
TRAFFIC SIGNS AS REQUIRED BY THESE PLANS. ALL COSTS FOR. TEMPORARY
PAVE MENT'-PAI NTI NG, INCLUDING COSTS FOR SANDBLASTING OF EXISTING LINES -
AND MARKINGS, AND THE REMOVAL OF PAVEMENT MARKERS, SHALL BE AT.THE
CONTRAOTOR'S EXPENSE.
14. 7UC CirY'S APPROVA'L tS F091. \NovtA<- LT�5 JtjFttS-
OleTtom j\,mD tS CONT%tqGF-NT Ok TNE CONTRXICTOP.
06TA%t4so4G WRITTFIN A.91PPLOVAL kND Pe;tk%AlTS FOVL
%Nop _rkC C 1,Ty
.v. pRoPOSED IN RIVERS1 DE COUN'TY -
RECOMENDS T14E JNSTALLATIl0N Otr OVAL R -t SiGoMb A. -r
P14MDELPHM 57T. AS MOTEO -
6 -
ANA
A"!
R-3
cc.
5 as _144 V�,ZFESSIO
)A, N.
rn
D4 LLJ
No. 20300 rn
cr_
'Exp. 0AM
_10
Soft&
7 -
RE C_0_R.D_,___-_D_ RAWIN_
Rl.. SIP OF CA
o
SIDE CO"
-12 u J
'01 rA a" 4,00 son 'm nr_
.A$