HomeMy WebLinkAbout1945-1tLitoo go 0 0 0 '00: 0: oe 0 0 e:
0 W
> I 'o" 0 4? 0.4-0090 to -to.e-0. z .09
(Q
CERRITOS ST
f T
0 1
z I 1 10 9 8 7 6 5 4 3 2 1 C;
z
-4- -4- =4 4- --1--
% 4
SEE SHT NO. 2 Cn
Ff I * - - - --0 � � %*...
co CERRITOS STREET
0
Z
z -4 LAKEVIEW CT.
INEDEX MAP
1 11 = 1001
k'= 00 ,
8 11 Gurb Face 6 " Gurb Face
0"0 WOle Zr77,0 9,f1011
geale.. / lfzr /0'
*o leg
q 4ra, 1n7rAo
�1 0,(Pa!5l eor�411 5! or
7he exl4lee-we ale loeol.(o.,,�7 oll'7 a 4117&ee-qrV411-e X Z 14
!ghowr7 or7lh e g e:,:%, ",5 a7OI& Ohlal,17&0" a 1he
7a- //"a 01A 11yere a/-& -70 eW16,1'
a11111leg eXre lhege olaP76-' T1,17e Ig
117e 41111114 111-76P9
Mp& Z//////4/ P&13 C01761alle a,,--
6 ve 01"ge _1G el7aWr7 al-,�r701 %h'10W-7 0,,-7 lh0l
67ol7l,--aelor ayr-ee�g ll�alhep !9hall gole ag7d co,-,r7plgil roq�,
eo 6
* b r-1 /*
X71
arzcz ".Oir OA
WO`rt'l�rJ7 17,241rig ae� I)ITIaly/,A7e eal-7 !gxllall 1'�Pz al��
0 1___aje6�
, W �,,-77 aO
/ 41?0/C r7&, q
6'0i-7,,*7&C`-r1 017 W W
,*Oea/ 0V1.1eL?C0" 1�-7 1117 1he lae,,- 0/ 010"')eO
lt;261111, ar.IiFlry- //7&
/wP
00i.
IF
TYPICAL
I
SECTIONS
(NO SCALE)
30
Xf S r g/w
For W RIW
68
4.5
crown 1-1 Ira 14'
Vq
o
(200 .3a, Vil FROM
/ 04 TA - .2 � 171
361,
4.5
n 4e. R1
R5
/6'
Hlo 171and
waln4lt Vilm
Pc?rkway
Basellne
Zoca6on
Rey.
? /t/47/40
r
(/'7
, a
LOT "P" FOR DFhWAGE 4 LRN08CPPE_
PROP
BLOCK
WALL
11% 11K -1 "
M M. MAX exllvr I
/eve/ IIIW-,7
4.010...
_PW
sw EX. 2 4 PROP
Ill t., C. (69. VAKES FWM S. R ro 5"18"R.C.P
I % TO 2.71 0/. 02 BE REMO VED
F41 t. PY/77 vu IF 0
PEE FUTUFE lff�
,�OVEMENT
F�k TffMCT /369' MANGO AVENUE'
T 5.5 GENERAL NOTES:
CONSTRUCTION ITEM AND QUANTITY ESTIMATE
ITEM
QUANTITY
1.
ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANS AND
f7(p 56 SF
OZ
1049 411%
THE CITY OF FONTANA PUBLIC WORKS DEPARTMENT STANDARD
Transition curb ( 6" G.F to 8 " C). F.) THRMUG" CURB 7,MZN
2. P
SPECIFICATIONS DATED 1975.
W RIW
CO/v�gre,�yc,7- 4` /-11N W.& �0-11"7_ 064ZZ /9# 20",v- kwrlo,� go//-
6- RIW
2.
CONSTRUCTION PERMITS SHALL BE OBTAINED FROM FONTANA PUBLIC
596 LF
64"
Remove exist. water meter by Alalare
I EA.
@)i
Construct 8" curb w/18" gutter per City of Fontana Std. 101
WORKS DEPARTMENT PRIOR TO START OF ANY WORK WITHIN THE CITY
construct cross gutter per City of Fontana Std. Detail 104
J
1
3060 SF
LIMITS.
Construct ramped curb return per City of Fontana Std. 104-A
2 EA
4.,
4
Relocate exist. RR and guy wires (S.Cal.Edison)
lEA.
Remove 24 0. S. R
. 1
3.
ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE
/0**
ZOO
CONTRAOTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES.
a" 10
T"ro` lo
v
A?
Cons7lruct drivewoy r.?pproacI7 per Cl,,y orFon7lc?,o-w 6?V. /0.2 /dw/ill
4.
ALL PIPES OR SUBSTRUCTURES OF ANY KIND AND ALL TELEPHONE OR
400
,j)
&4.
7701,ol,,le,06� LAOINS 7_0 Al
10101VS17MIC.1- A14WIVII-4w IeIA0111OV200 "IneVIV, 1*/V10 OM"44Y AIWINS ,Ve
//V
POWER POLES, WATER METERS, VALVES, HYDRANTS, IRRIGATION
V40EIA
STRUCTURES, ETC., SHOWN OR NOT SHOWN ON THIS PLAN AND
"0 1p
C'.
LOCATED WITHIN AREAS TO BE IMPROVED AND INTERFERING WITH
Now
CONSTRUCTION, SHALL BE RELOCATED BY OTHERS; IT SHALL BE THE
won"
"A EXAFt.
5W
CONTRACTORS RESPONSIBILITY TO NOTIFY ALL OF THE AGENCIES
CONCERNED BEFORE CONSTRUCTION BEGINS.
/0
-A *(so
Exis'.. C.
5.
WATER VALVE COVERS SHALL BE RAISED TO GRADE BY THE PAVING
doin EX/st 12vmle-
CONTRACTOR.
BLANCHARD
AVENUE
6.
AS -BUILT/ PLANS SHALL BE PROVIDED TO THE CITY BY THE
CONTRACTOR.
T J. 0
7.
ALL UTILITY COMPANIES SHALL BE GIVIN 48 HOURS NOTICE PRIOR
TO WORKING AROUND THEIR FACILITIES.
k
8.
ALL BACKFILL TO BE CERTIFIED BY SOILS ENGINEER.
S. Jelw
Al. e1W
sole
9.
ALL MATERIALS AND METHODS TO BE SUBJECT TO THE APPROVAL OF
THE CITY ENGINEER.
7
N
K
10.
BACKFILL TO HAVE A S.E. OF 30 (MIN) AND MIN. COMPACTION OF
cz
/0
4.6
90%.
-Futzlie-e
EX/5"Pill R;Mw-
14C
0. 56�
0. 16�
oza
000'
N)
11.
ALL NEW OR EXISTING VALVE CANS AND MANHOLES� SHALL BE
ADJUSTED TO GRADE DURING PAVING.
so
/&Vdl/ 11�7e
r
12.
CONTRACTOR TO INSTALL PAVEMENT MARKINGS AND STRIPING AS
REQUIRED BY THE CITY ENGINEER.
13.
CONTRACTOR SHALL NOT OPERATE ANY MAIN LINE WATER VALVE ON
40
4
/0
EXISTING WATERLINES.
14.
IF EXISTING UTILITIES OR OTHER FACILITIES CONFLICT WITH THE
CERRITOS
S- REET
IMPROVEMENTS, WORK SHALL STOP AND THE ENGINEER NOTIFIED
IMMEDIATELY.
I
r/. Z3.0
15.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY
THE ENGINEER AFTER THE BASE COURSE HAS BEEN CONSTRUCTED AND
BEFORE THE PAVING HAS BEEN INSTALLED SO THAT THE ENGINEER
MAY INSTALL THE STREET CENTERLINE MONUMENTS AS REQUIRED BY
THE CITY CODE OF THE CITY OF FONTANA.
CONSTRUCTION ITEM AND QUANTITY ESTIMATE
PAVING NOTE
ACTUAL THICKNESS OF BASE MATERIAL TO BE DETERMINED.BY SOIL TEST AND RECOMMENDED BY THE SOiLs
ENGINEER R. VALUES , SAND EQUIVALANTS AND STRUCTURAL SECTION, *OF STREETS SHALL BE SUBMITTED
TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION- OF ROUGH GRADING.
CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES AND SWALE$ FROM UNDERMINING STREET IMPRO-
VEMENTS UPON INSPECTION OF THE SITE , THE CITY ENGINEER MAY REQUIRE TEMPORARY GUNITE' SWALES ,
ENTERING OR LEAVING IMPROVEMENTS .
PRIVATE ENGINEER'S NOTE
THE PRIVATE ENGINEER SIGNING THESEPLANS IS RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTA-
BILITY OF THE WORK HEREON. IN THE EVENT OF DISCREPANCIES ARISING DURING CONSTRUCTION, THE
PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINJNG AN ACCEPTABLE SOLUTION AND REVISING
THE PLANS FOR APPROVAL BY THE CITY. THIS NOTE REQUIRED ON ALL PLANS.)
PAVEMENT SECTIONS SHOWN ARE MINIMUM AN D SUBJECT TO REVISIONS AND APPROVAL OF THE CITY AS
REQUIRED BY SOILS TEST TAKEN AFTER COMPLETION OF ROUGH GRADING.
8 E -/V 01 M PO( NO - 3`56o
liFY VRIL nkID FLAS14EIZ IM POLE. MO. 801-181E F)T MiDIM-1ER5T
CORNES? OF: OLEPNVET RIJO RMSELINE_
'01 -V
ELE IAOID.86
CALIFORNIA
11 oil" ESS/ CITY OF FO-NTANA,
oQ6 1/1610AIS:
M.LVIN W.
Sierra En Ineer-Ing PUBLIC WORKS DEPARTME,',NT.
Ca THATCHER III A10, DESCRIP7710AI A94q7-E ESSI DRAWN BY I
AARi:;?..ov,4e_ Doll?r46 CIVIL ENGINEtRS,- LAND SURVEYORS - LAND PLANNERS SCALE:
No.39964 KENNETH A. BAT TRACT NO* 13411
4.5 ShOwn
CIVIL POWERS DESIGN
1714-7 852-9400. BY
ENGINEERM',X 3 27007 East FI*fth Street �A A_ IMPROVEMENT PLAN
je Ni. 03 820
Exp, 06-30-90 High'I nd1V DATE:
C HECK BY:
CIVIL KT TITLZ SHEET 1-11q- C//
L Z7 Arl>47;1 UC 7,,-2 4" 0 or
V1,V PVw 1W, -,97,0,Y C �_, J OB NO: APPROVED: NO.
Zn1n, C
eo R. NO SHT
0yr It
19 45
DA 382Q 6/30/90 IIIV725�FI14_1 -,ENGINEER
6mmmmeni o. j,
(j
ITEM
QUANTITY
0
Construct 411 A.C. pavement over compacted Native Soil
f7(p 56 SF
OZ
1049 411%
Transition curb ( 6" G.F to 8 " C). F.) THRMUG" CURB 7,MZN
2. P
510 6X
0-6-
CO/v�gre,�yc,7- 4` /-11N W.& �0-11"7_ 064ZZ /9# 20",v- kwrlo,� go//-
/0 40 bor
Construct 6" curb w/18" gutter per City of Fontana Std. 101
596 LF
0
Remove exist. water meter by Alalare
I EA.
@)i
Construct 8" curb w/18" gutter per City of Fontana Std. 101
170 LF
construct cross gutter per City of Fontana Std. Detail 104
2 EA.
Construct 4" thick p.c.c. sidewalk
3060 SF
Construct ramped curb return per City of Fontana Std. 104-A
2 EA
4.,
4
Relocate exist. RR and guy wires (S.Cal.Edison)
lEA.
Remove 24 0. S. R
J50 Z.
Install Rl "STOP" Sign
EA]
Cons7lruct drivewoy r.?pproacI7 per Cl,,y orFon7lc?,o-w 6?V. /0.2 /dw/ill
3 7eoO 5)c
400
e-orell 16W1Vz11V IVI-10. Jdf1/Z/ 01�004FAGD PEE DETI-711- lq�IT4)
&4.
7701,ol,,le,06� LAOINS 7_0 Al
10101VS17MIC.1- A14WIVII-4w IeIA0111OV200 "IneVIV, 1*/V10 OM"44Y AIWINS ,Ve
//V
PAVING NOTE
ACTUAL THICKNESS OF BASE MATERIAL TO BE DETERMINED.BY SOIL TEST AND RECOMMENDED BY THE SOiLs
ENGINEER R. VALUES , SAND EQUIVALANTS AND STRUCTURAL SECTION, *OF STREETS SHALL BE SUBMITTED
TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION- OF ROUGH GRADING.
CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES AND SWALE$ FROM UNDERMINING STREET IMPRO-
VEMENTS UPON INSPECTION OF THE SITE , THE CITY ENGINEER MAY REQUIRE TEMPORARY GUNITE' SWALES ,
ENTERING OR LEAVING IMPROVEMENTS .
PRIVATE ENGINEER'S NOTE
THE PRIVATE ENGINEER SIGNING THESEPLANS IS RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTA-
BILITY OF THE WORK HEREON. IN THE EVENT OF DISCREPANCIES ARISING DURING CONSTRUCTION, THE
PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINJNG AN ACCEPTABLE SOLUTION AND REVISING
THE PLANS FOR APPROVAL BY THE CITY. THIS NOTE REQUIRED ON ALL PLANS.)
PAVEMENT SECTIONS SHOWN ARE MINIMUM AN D SUBJECT TO REVISIONS AND APPROVAL OF THE CITY AS
REQUIRED BY SOILS TEST TAKEN AFTER COMPLETION OF ROUGH GRADING.
8 E -/V 01 M PO( NO - 3`56o
liFY VRIL nkID FLAS14EIZ IM POLE. MO. 801-181E F)T MiDIM-1ER5T
CORNES? OF: OLEPNVET RIJO RMSELINE_
'01 -V
ELE IAOID.86
CALIFORNIA
11 oil" ESS/ CITY OF FO-NTANA,
oQ6 1/1610AIS:
M.LVIN W.
Sierra En Ineer-Ing PUBLIC WORKS DEPARTME,',NT.
Ca THATCHER III A10, DESCRIP7710AI A94q7-E ESSI DRAWN BY I
AARi:;?..ov,4e_ Doll?r46 CIVIL ENGINEtRS,- LAND SURVEYORS - LAND PLANNERS SCALE:
No.39964 KENNETH A. BAT TRACT NO* 13411
4.5 ShOwn
CIVIL POWERS DESIGN
1714-7 852-9400. BY
ENGINEERM',X 3 27007 East FI*fth Street �A A_ IMPROVEMENT PLAN
je Ni. 03 820
Exp, 06-30-90 High'I nd1V DATE:
C HECK BY:
CIVIL KT TITLZ SHEET 1-11q- C//
L Z7 Arl>47;1 UC 7,,-2 4" 0 or
V1,V PVw 1W, -,97,0,Y C �_, J OB NO: APPROVED: NO.
Zn1n, C
eo R. NO SHT
0yr It
19 45
DA 382Q 6/30/90 IIIV725�FI14_1 -,ENGINEER
6mmmmeni o. j,
(j