HomeMy WebLinkAbout1932-1SCALE: 1 a =40,
40 20 0 40 80 120
SCALE IN FEET
R/W R/W
I I I
120'
13' 38 18 owns 380
12' 12!wl
12' 121 + --a*- 14'
FUTURE S 40 all
CURB 1 0.51
L S)79PEJ v r ,
TYPICAL SECTION
N.T.S.
EXIS11NG UNDERGROUND
STRUCTURES:
THE EXISTENCE AND LOCATION OF THE ANY UNDERGROUND UTILITY PIPES, CONDUITS,
OR STRUCTURES SHOWN ON RIESE PLANS ARE OBTAINED BY SEARCH OF THE AVAILABLE
RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES
EXCEPT AS SHOWN ON THE THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE
PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN AND ANY OTHER NOT
OF RECORD OR NOT SHOWN ON THESE DRAWINGS. ITS SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO NOTIFY THE OWNER'S OF THE UTILITIES OR STRUCTURES CONCERNED BEFORE
STARTING THE UNDERGROUND UTILITY PIPES, CONDUITS, STRUCTURES SHOWN OR NOT SHOWN ON THE
DRAWINGS.
HOLD HARMLESS AND
INDEMNIFICAT110N CLAUSE:
CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE NTH GENERAL ACCEPTED CONSTRUCTION
PRACTICES, CONSTRUCTION CONTRACTOR WILL REQUIRED THE ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE
PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE
MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND
CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNITY AND HOLD DESIGN
PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH
THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE
NEGLIGENCE OF THE OWNER OR DESIGN PROFESSIONAL.
UNAUTHORIZED CHANGES & USES:
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR,
UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS MUST BE IN
WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS.
1411
1409
1407
1405
1411
RIGHT
1409
1407
1405
10.
mmomommmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
156 LF.
PCC SIDEWALK
�
AC PAVING
8
1" AC PAVING
5390 SF.
DRIVEWAY APPROACH
8
T
5 EA.
R28S(RT)
1 EA.
R28S(LT)
1 EA.
ci
3
0 0
a 6 E)GST. R/W
E)aST-WAJEF LINE_
. MMMMMMM1MMMMMMM
mmmmmmmmmmmmmmmmmmmmmmommmmmmmommmmmmmmmommrm3mmmm
MMMMMMMMIMMMMMMOMMMMAMMMERMMMEMMMMEMMMMO
ML
Emmmmm
MMME
MMMMMMMM
EMMMENE
mo
311111111011
NONNI N.,
I
MEMMUN
MEN
ME
MMMMMMMMM3m3MMMM
MEMO
SCALE
HORZ. 1* ,ws
VERT. 101111114!
9
C4
L
_j 8
v -
L
STA 10+00
20 I.P. T.-B.CO.
SURVEYOR
LL
CYPRESS AVE.
1* OVEFdAY M
2' PAST CENTERUNE
(SEE TYP. SECTION)
1411
1409
1407
1405
RIGHT
1409
1407
1405
5IN
0
156 LF.
PCC SIDEWALK
�
AC PAVING
8
1" AC PAVING
5390 SF.
DRIVEWAY APPROACH
8
T
5 EA.
R28S(RT)
1 EA.
R28S(LT)
1 EA.
ci
3
0 0
a 6 E)GST. R/W
E)aST-WAJEF LINE_
"W *W tAb 1. W FD SPIKE
11+00 12+00 13+00 15+00 16+00
BASELINE A E.
... .. .... ..
1 00
50.
101� + 00ST. EP
PR 0 P 0 SSMEMD E)OST. R/W
GRADE +t WM
TO DRAIN I
EAST. DRIVEWAY
STA. 13+69
STA. 1'3+7&58
mmillillill1illil
4
Ilk q.
RELOCATE E)aST BEGIN TAPER
EYJST. CL
TELEPHONE POLE FENCE
# 100011H APN#241-041-45 241-0\ 241-041-47
BY PACIFIC TELEPHONE E)(IST. R/W 41-46 RELOCATE E)(IST
PRIOR TO CONSTRUCTION TELEPHONE POLE
PROPOSED # 102464H
DRIVEWAY BY PACIFIC TELEPHONE
PRIOR TO CONSTRUCTION
"r
DELINEA10N DE US
LINES
VMITE
YELLOW
DIRECTION OF TRAVEL
DETAIL 27A
2*-[ EDGE OF TRAVELED WAY (A.C.)
40
0
8" CURB & GUTTER
156 LF.
PCC SIDEWALK
910 SF.
AC PAVING
8485.50 -SF.
1" AC PAVING
5390 SF.
DRIVEWAY APPROACH
193 SF.
TYPE L MARKER, CLASS 1
5 EA.
R28S(RT)
1 EA.
R28S(LT)
1 EA.
TRAMC STRIPE (LF)
DETAIL
12'8 WHITE
4* YELLOW
8* WHITE
4## WH I TE
27A
r,-7
21
1
1 914
NO.
NOTE: TRAFFIC STRIPE AND PAVEMENT MARKINGS SHOWN I�RE FOR
INFORMATION PURPOSES ONLY. ANY CONTRACTOR WISHING
TO PROVIDE OWNER NTH BID SHALL MAKE THEIR OWN
ESTIMATE AND PRESENT THEIR BID ACCORDINGLY.
STRIPING GENERAL NOTES:
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH -THIS PLAN AND THE
STANDARD SPECIFICATIONS DATED JANUARY, 1988 AND THE STANDARD
PLANS D7ATED --JANUARY, 1988 OF THE STATE OF CALIFORNIA, DEPARTMENT
OF TRANSPORTATION
2. ALL EXISTING DELINEATION SHALL BE REMOVED V41THIN THE PROJECT LIMITS.
REPLACE AS SHOWN WITHIN THE PROJECT LIMITS.
3. ALL WORK, MATERIAL AND EQUIPMENT FOR TRAFFIC SIGNING AND STRIPING
SHALL CONFORM TO THESE PLANS AND THE STANDARD SPECIFICATIONS
FOR THE CITY OF FONTANA AND THE STANDARDS AND SPECIFICATIONS OF
THE STATE OF CALIFORNIA.
4. PAINTING PROCEDURE SHALL CONFORM TO THE STANDARD SPECIFICATIONS
AHD THE REQUIREMENTS OF THESE GENERAL NOTES.
5. TRAFFIC STRIPES AND PAVEMENT MARKINGS ON NEW SURFACING SHALL
BE APPLIED IN TWO (2) SEPERATE COATS. THE,SECOND COAT TO BE
APPLIED WITHIN 30 DAYS.
6. THE CONTRACTOR SHALL FURNISH THE NECESSARY CONTROL POINTS FOR
ALL STRIPING AND MARKING AND SHALL BE RESPONSIBLE FOR THE
COMPLETENESS AND ACCURACY THEREOF TO THE SATISFACTION OF THE
C;TY ENGINEER.
7. TRAFFIC SIGN DIMENSIONS, COLOR AND LETTERING SHALL CONFORM TO
CALTRANS APPROVED SIGN SPECIFICATION SHEETS. SIGN CODES SHOWN
HERREON CORRESPOND TO THE CALTRANS SPECIFICATION SHEET CODES.
SIGNS SHALL BE THE STANDARD SIZE UNLESS OTHERWISE INDICATED.
8. MATERIALS FOR SIGNS, POSTS AND MOUNTING HARDWARE, SIGN
CONSTRUCTION AND SIGN PANEL INSTALLATION SHALL CONFORM TO
SECTION 56-2 OF THE CALTRANS STANDARD SPECIFICATIONS.
9. SIGNS SHALL BE MOUNTED ON METAL BOX SECTION POSTS UNLESS
OTAERWISE INDICATE.). POSTS AND INSTALLATION SHALL MEET CITY
REQUIREMENTS.
10. CAT TRACKING TO BE APPROVED BY CITY PRIOR TO PAINTING.
REVISIONS FNGR'S
APPROVAL I DArE CITY DATE
APPRCVAL
BENCHMARK: BM# 407
PK NAIL WEST END SW CURB RETURN
0 MILLER & CYPRESS
ELEVATION: 13M.59
VICINITY MAP
N.T.S.
F SITE
GENERAL NOTES:
1. ALL WORK SHALL BE DONE IN ACCORDANCE NTH THESE PLANS AND THE CITY OF FONTANA
PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS DATED 1975.
2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE PUBLIC WORKS DEPARTMENT PRIOR TO
THE START OF ANY WORK.
3. MANHOLE FRAMES AND COVERS SHALL BE CONSTRUCTED TO 6" BELOW FINISHED PAVEMENT GRADE
BY THE SEWER CONTRACTOR, AND SHALL BE RAISED TO GRADE BY THE PAVING CONTRACTOR,
AT THE COMPLE11ON OF PAVING.
4. WATER VALVE COVERS SHALL BE RAISED TO GRADE BY THE PAVING CONTRACTOR.
5. ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT
THE WORK TO THE PLAN GRADES.
6. AS -BUILT PLANS SHALL BE PROVIDED TO THE CITY BY THE CONTRACTOR.
7. ALL PIPES OR SUBSTRUCTURES OF ANY KIND AND ALL TELEPHONE OR POWER POLES, WATER
METERS, VALVES, HYDRANTS, IRRIGATION STRUCTURES, ETC, SHOWN OR NOT SHOWN ON THIS
PLAN AND LOCATED WITHIN AREAS TO BE IMPROVED AND INTERFERING WITH CONSTRUCTION,
SHALL BE RELOCATED BY OTHERS; IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY
ALL OF THE AGENCIES CONCERNED BEFORE CONSTRUCTION BEGINS.
8. ALL UTILITY COMPANIES SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO WORKING AROUND THEIR
FACILITIES.
9. ALL BACKFILL TO BE CERTIFIED BY SOILS ENGINEER.
10. ALL MATERIALS AND METHODS TO BE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
11. BACKFILL MATERIALS TO HAVE A S.E. OF 30 (MIN) AND A MIN COMPACTION OF 90%.
12. CONTRACTOR TO INSTALL PAVEMENT MARKINGS AND STRIPING AS REQUIRED BY THE CITY
ENGINEER.
13. CONTRACTOR SHALL NOT OPERATE ANY MAIN LINE WATER VALVE ON EXISTING WATERLINES.
14. IF EXISTING UTILITIES OR OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS,
WORK SHALL STOP AND THE ENGINEER NOTIFIED IMMEDIATELY.
15. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEERING AFTER
THE BASE COURSE HAS BEEN CONSTRUCTED AND BEFORE THE PAVING HAS BEEN INSTALLED SO
THAT THE ENGINEER MAY INSTALL OR REINSTALL THE STREET CENTERLINE MONUMENTS AS
REQUIRED BY THE CITY CODE OF THE CITY OF FONTANA.
16. ACTUAL THICKNESS OF BASE MATERIAL IS TO BE DETERMINED BY SOIL TEST AND RECOMMENDED
BY THE SOILS ENGINEER R. VALUES, SAND EQUIVALENTS AND STRUCTURAL SECTION OF
STREETS,AND SHALL BE SUBMTTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION
OF ROUGH GRADING.
17. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES AND SWALES FROM UNDERMINING STREET
IMPROVEMENTS UPON INSPECTION OF THE SITE, T.HE CITY ENGINEER MAY REQUIRE TEMPORARY
GUNITE SWALES, ENTERING OR LEAVING IMPROVEMENTS.
ANDEZ, KROONE & ASSOCIATES
Planning - Design - Surveying -
435 Orange Show Lane, Suite 203
San Bernardino, CA 92408
(714) 884-3222
CONSTRUCTION NOTES:
CONSTRUCT 8" CURB & GUTTER PER CITY OF FONTANA STD. 101.
Q CONSTRUCT CONCRETE SIDEWALK PER CITY OF FONTANA STD. 105-A.
CONSTRUCT ONE COMMERCIAL DRIVEWAY ENTRANCE PER STD. 102-C, W=24'.
CONSTRUCT 6 1/2" A.C. OVER 95% 12" COMPACTED NATIVE MATERIAL.
(a) SAW CUT TO NEAT STRAIGHT EDGE PER GENERAL NOTES.
INSTALL 'TYPE L OBJECT MARKER ON "C
CHANNEL PER CITY STANDARD.
1- MIN. OVERLAY TO 2' NORTH PAST CENTERLINE OF BASELINE.
PAINT DOUBLE YELLOW TRAFFIC STRIPE PER STATE
STANDARD DRAWING A20 -A, DETAIL 21.
PAINT 4" WHITE STRIPE PER STATE STANDARD DRAWING
A20-8, DETAIL 27A.
@ INSTALL CLASS 1 FLEX113LE POST DELINEATORS PER
STATE STANDARD DRAWING A74 -A.
INSTALL R28S(RT OR LT)
CITY OF FONTANA, CALIFORNIA
PUBLIC WORKS DEPARTME-NT
STREET PLAN SCALE
VM I BASELINE AVENUE 1 to =40'
DESIGNED BY FROM 188' EAST OF CYPRESS AVENUE TO DATE
RH 345#___�AST OF CYPRESS AVENUE 10-15-90
j%y PROVP
DRWG SHEET
IRI C, /0)32
',T�RICHARD R. HERNANDEZ R.C.E. 42246 DATE IN'TE-RI CITY ENGINEER- R.C.E. 25131 OF