Loading...
HomeMy WebLinkAbout1911-1I Cn PRIVATE ENGINEER'S NOTE THE PRIVATE ENGINEER SIGNINI THEE PLANS IS RESPONSIBLE FOR ASSURING THE ACCURACY AND ACCEPTAEMLITY OF THE WORK HEREON. IN THE EVENT OF DISCREPANCIES ARISING DURING CONSTRUCTION I THE PRIVATE ENGINEER SHALL BE RESPONSIBLE FOR DETERMINING AN ACCEPTABLE SOLUTION AND REVISING THE PLANS FOR APPROVAL BY THE CITY. PRIVATE ENGINEER'S NOTE TO CONTRACTORS The existance and location of any underground utility pipes. conduits, or other substructures shown on these plans are based on - o/cIlable records. The contrceto'r Is required to take due cautionary measures to protect the utility lines shown on A:C; plans. The contractor further assumes all liability and responsibility for any utilit pipes, conduits. or other substructures shown or not shown 'Tons. T on these P The contractor agrees that he shall assume sole and complete responsibility for the ob site conditions during the course of construction of the project, Including safety of all persons and promty, that this re uIrement shollvp I continuously and not be ted o'normal work?n hours; and th � �he contractor shall defend. IndemnIfy)'ond hold the 81ty * the owner&, and the engineer harmless from any and all liability. real or alleged, In connection with the performance of work on the Project, excepting liability arising from the lrole negligence of the Owner or the Engineer. z W R W 1 1 4 MAURY LU X U D W W 0 M W C.D ad la L) L: + J) F- ko z CIL W P-Q '45 P , W z C%4 4 IZ UJV) Nt , N. 02 z CL a tn 16 15 14 0 uJ 13 M aj a: W 02 lr�'q Cn 00 a; W \4 W =E CM 0 ce Ln �z # U) in Its # i,- iL 0 CL .2 c\1 28 a. a. 10� N ow a 00 85.7� 85.74 95.75 T 95.73 R/W -777.177; :.1% ---------------------------- 'd JAI' 'I 0 LA OF A%J/ OR % 0 and U W 17 118 peq D 602 U N 89*45'20,91E GA lic =.Q 8 W W H - 12 XISTING SEWER D 504 NOT TO SCALE VIC[NITY MAP R/W 30' 12 12' 0.5 1 4 101 —10 114 1 ;1r IFF00 rr!Q_67�1 tn +O -A:4 3 7 5 XIST AC E X I ST. CURB 18' SECT ION MALLORY AVENUE NOT TO SCALE T. I =: NO. REVISION GENERAL NOTES 1. All work shall be -done In accordance with these plans and the City of Fontana Public Works Department Standard Specifications dated 1975. 2. Construction permits shall. be obtal Lned from Fontana Public Works Department prLor to the start of any work. 3. Water valve covers shall. be raised to grade by the Paving Contractor, during paving ap4�ration,, within the city fimits. 4. 'All pipes or substructures of any kind and all telephone or power poles, water meters, Valves, hydrants.. irrigation structures, etc., shown or not shown on this plan and located- within areas to be improved and interfering with construct ion, shall berelocated by ot,hers; it shall be the contrac)-Pr!s responsibility tonotify all of the agencies concerned before construction begins. 5. Adequate stakes'sh,a]l be set by the Engineer to enable the contractor toconstrtlilct, the work tQ the plan �r-ades. 6. As -built plans shall be provided to the City by the Contractor. 7 All Utility, Companies shall be given 48 hours notice prior to working around their facilities. B. All backfill to be certified by 'Soils Engineer, 9. All materials and metbools to be. subject to the ap�roval of the City Engineer. y 10. Backfll materials to have a S.E, of 30 ( min) and min compaction of 900/o. 11. Contractor to install pavement markings alnel stripping -as required by the City Eng'rnee-r- SCALE 1 40 12. Contractor shall not operate any main line wafer valve on existing waterlinea - .1 13. if existing utilities or other facilities ronflict with the proposec[- improvements, work shall stop and the engineer notified immediately. 14. It shall be the responsibility of the cantractor to notify the engineer after the base course has been constructed and before the pavIng has been lnst%e� o Wt th stall the street centerl ne monuments as engineer n1a in ty J e cite requ re y coae of cit� of fontana CONSTRUCTION NOTES& QUANTITY ESTIMATES PAVING NOTES CONST. 6 "' CURB t GUTTER PER STD. 101 19BG LF 7ctual t Fness of base mat7rial to be determined by soil test and recommended by the Soils Engineer R.Values sand CONST. PCC SIDEWALK PER STD. 105 -A 7860 SF equivalents and structural section of streets shall be subh�itted to -the C ity of Fontana for approval upon completion of rough CONST. SPANDREL. CROSS GUTTER PEfR STD.. 104. 385 SF gradin g. CONST. RAMPED C -URB RETURN PER STD -104-A Care should be taken to prevent grades., -ditches and swales from undermining street improvements upon inspection of CONST. 4" -AC OVER 12" COMPACTED NATIVE MATERIAL 570 TN the site, the City Eingi�eer may require, temporary gunite swales)entering or eavi ng improvements. CONST. DRAINAGE STRUCTURE PER DETAILS 1 EA Pavement sections shown are minimum and subject to revision and approval of the City as required by soils test taken after REMOVE ) EXIST. C � G 76 LF completion of rough grading. REMOVE EXIST. P.C.C. SIDEWALK 60 SF Trim edge of existing pavement where new pavement joins to a smooth,straight line. Construct match -up paving as shown on plan CONST, ONE RESIDENTIAL DRIVEWAY PER STD. 102 ON and overlay paving as directed in the field to produce a smooth EACH LOT. (T0.J3E_FIELD LOCAT.EDI 19 EA sec119.0,.,_ VI'Of ESS/ 'S10A Y" OA A Al SAW CUT TO NEAT STRAIGHT EDGE PER PAVING NOTES. 3G5 LF � ... ...... L4' OVERLAY REMOVE & REPLACE PAVING OVER SEWER TRE9C.H. 5M SF ULJ N INSTALL STREET LIGHT ON EXISTING POWER POLE 2 EA CC CY o. 3 3% /J -I (TYPE 5800 HIPS) 0 A. 'F FONTANA CALIFORNIA ENGR'S CITY DATE DATE APP ROVAL APPf�qVAL t biti, LAND 8URVVYORS CIVIL CNOXNE Ekd PARTMENT-__ PUBLIC WORKS DEIr_1% 495 W. vi111#y Blvd4 Colton, CA. 92324 0 14) 825-8309 DRAWN BY STREET.PLAN �CALE - JKL 10.0 40-! MALLORY AVENUE DESIGNED BY DATE JKL T R 13 671 APPROVED DRWG SHEE 'FILE Mai JAtAES K.'I_At��N'E lh.-CF-.33792 No, 114GINEEk i=4 -7 001,