Loading...
HomeMy WebLinkAbout1854-1Esc. = EY Is Tin/ G / OL C FOR FUTURE USE -j6-* INSTALL 3" GRC /N E)C. (o"PVC SLEEVES FOOTHILL - - SEX. R/w 416U IS.S7�' 1112 9 3 "C 3 #2 T YPe 171o7 CON79' , ^L L ER IN TYPE 332 C461/VET; T YPE" -m- CF 5VC. CAB,wle�T I S V C. Pr 2 b PP.6 QS to P 4 414U NNW L0696 /N TyE5,6TWO /ANSS (8 7'6r4L) V N D/S CONNECTED DOR/NG LANE CLOSURE . 4160 o � C � f j.4. 4-T6U Q CQ N � ' N I i ' o Q 2= 3 L 213L Lk cv 4/D' To STOP BAR 205' TD STOP BAR E: Cn cV N04 464 " l�/Z"C ?,OL N / 2 C, /DLC / 112"C) 3 DLC _ 6T � X. R/ W P�'f3 � 4G TEMPORARY SOL C PHASE DIAGRAM 3 "GRC CONDO/T /NSTAL L ED /N 6" PVC , SLEEVE, RA/SbD TD 24 of I2EPrIl AT /2 l S OFF CF. TO ACCOMOD4TC EX . WATER L /,/E . >=rr o 4t S 09f 06 W STEADY DEMAND SEQUENCE Now INIIIIIIIIIII T I 11m, FD�NOAr�oN POLE SCHEDULE CONDUIT AND SCHEDULE P.PB. SAFETY LIGHTING POLE CIRCUIT FA111LVVAVWAVWAVWAVWAVM- 0 QUAD I 29-5-60 5' /2' SV- /-T I - M45 110131WA, WAA 4 E 200W_ws 2 /-A 00') - - TV- 2 -T - - SP- I -T 6 S - 3 29- 5-80 20' 8 ' 5V -1-T I -MAS SP- I -T (c S 200W -4P5 J TV- 2- T - SP- I - T 8 w - 5 29-5-80 c.: �ov�o©■�vo©© /2' 5V -1-T i -MAS 5P-1-7 8' W 2J /V/0S b I -A (/O') - - 7-V- 2-7 - SP- l - T 2 0 - 7 04-4-80 20' - SV - l - T " " = • • �0000v0v00� 2 A/ - (S� /-A (l0') - - TV- 2-T - SP- /- T 4 W -- • - • 000000�000�MMFM Esc. = EY Is Tin/ G / OL C FOR FUTURE USE -j6-* INSTALL 3" GRC /N E)C. (o"PVC SLEEVES FOOTHILL - - SEX. R/w 416U IS.S7�' 1112 9 3 "C 3 #2 T YPe 171o7 CON79' , ^L L ER IN TYPE 332 C461/VET; T YPE" -m- CF 5VC. CAB,wle�T I S V C. Pr 2 b PP.6 QS to P 4 414U NNW L0696 /N TyE5,6TWO /ANSS (8 7'6r4L) V N D/S CONNECTED DOR/NG LANE CLOSURE . 4160 o � C � f j.4. 4-T6U Q CQ N � ' N I i ' o Q 2= 3 L 213L Lk cv 4/D' To STOP BAR 205' TD STOP BAR E: Cn cV N04 464 " l�/Z"C ?,OL N / 2 C, /DLC / 112"C) 3 DLC _ 6T � X. R/ W P�'f3 � 4G TEMPORARY SOL C PHASE DIAGRAM 3 "GRC CONDO/T /NSTAL L ED /N 6" PVC , SLEEVE, RA/SbD TD 24 of I2EPrIl AT /2 l S OFF CF. TO ACCOMOD4TC EX . WATER L /,/E . >=rr o 4t S 09f 06 W STEADY DEMAND SEQUENCE Now INIIIIIIIIIII T I 11m, FD�NOAr�oN POLE SCHEDULE LOCA- TIONTYPE MAST -ARM LENGTH SIGNAL LUMINAIRE SIGNAL MOUNTING P.PB. SAFETY LIGHTING POLE MAST ARM PED 0 QUAD I 29-5-60 5' /2' SV- /-T I - M45 SP- /-T 4 E 200W_ws 2 /-A 00') - - TV- 2 -T - - SP- I -T 6 S - 3 29- 5-80 20' 8 ' 5V -1-T I -MAS SP- I -T (c S 200W -4P5 J TV- 2- T - SP- I - T 8 w - 5 29-5-80 35 /2' 5V -1-T i -MAS 5P-1-7 8' W 2J /V/0S b I -A (/O') - - 7-V- 2-7 - SP- l - T 2 A/ - 7 04-4-80 20' - SV - l - T I - MAS S P- I -T 2 A/ - (S� /-A (l0') - - TV- 2-T - SP- /- T 4 W -- 4 /NS TA L L T�MPae4R Y ,BASE PZ A TE S A S NACE554,PY TO ACCOMODATE r4Af1pORA1eY 10,OLE5 . NOTES: 1. ALL CAPS AROUND 72c_71f4P01?14R Y POLES ARE POURED /N TEMPORARY CONCRE TE FOR EASY REMOVAL.. GENERAL NOTES TEAIRoRA R Y POZ E T 24A-4-80 /-A (/0') /7-2-70 l -Q 00' ) 24-2 -80 I -A (/0") &-2-70 I- A (/0') 1. ALL ELECTRICAL WORK SHALL CONFORM TO STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS AND THE STANDARD PLANS, BOTH DATED JANUARY 1988; AND, THE SPECIAL PROVISIONS. 2. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL UNDERGROUND FACILITIES AND PROVIDE PROTECTION PRIOR TO AND DURING TRENCHING, JACKING OR BORING. CONTACT ALL UTILITY COMPANIES 48 HOURS BEFORE EXCAVATING. 3. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS. IT SHALL BE TIIE CONTRACTORS RESPONSIBILITY TO COORDINATE ALL PHASES OF CONSTRUCTION <<ITH THE VARIOUS UTILITY COMPANIES INVOLVED. 4. POLES. PULL BOXES, DETECTORS, CABINET FOUNDATIONS, SHALL BE LOCATED AS DIRECTED BY OF THEENGINEER OR STATE INSPECTOR. 5. EXACT DETECTOR LOOP LOCATIONS KILL BE MARKED BY THE ENGINEER. DETECTOR LOOPS SIIALL BE CENTERED WITHIN LANE LINES OR LOCATED THREE (3) FEET FROM ADJACENT LANE LINE. 6. %LL PULL BOXES SHALL BE NO. 5 MINIMUM. STRIPING BY OTHERS. - - PPf3 � BOULEVARD ` 3 DLC Ex. R/w ¢6P _ _ �8 b _ FUTIJRE PO. C. - - -- -- cn 1-- _� - ---- - _- -- -- - -oft XD.C- — - - --.�fUTVRE DL C / /2 ", l L C Al ---- ,N ---- - -- ------ ----- --- --EX. E.P - --I -- - -- - - � J T YPE A L !'0P (T YP) t05' TO STOP BAR 4/O ' To STOP eAR `� -N i 42 04 l I 4 1 2 cly� b ,� 2 P U \ . PPB�P TEMPORARY SIGNAL INSTALLATION ST 7U 2 /0 /Z i APPROVED: I --1112"C , 3 DLC fe CIVIL ENGINEER RCE 40964 f CITY OF FONTANA, CALIFORNIA �c�''o 5856.00.01 - / '/2"C 2 DLC T r'�''` "' '� e _ DEPARTMENT OF PUBLIC WORKS Sca I" = 20' + EXP 9 4-93 des, gr LOT, R61 R Of CAC drdwn J P FOOTHILL BUCHERRY ,AV I DLC �.�;c;�' � C�� p a � pr oved R E I 8T6 L, REv, a AS - SUlL T PLAN a RE /O�Z.S�89 date Z//5/,6(3 FREPARED FROM )p1,4N 1p'e4011/DED By E El C0A1M,4CT0R ROSCOE /I�OOfi 7/25/89 by date BAATON-ASCHMAN ASSt)( (TES, MVC, sheet no. total sheets > > is .T frU revisions 100 Fars Center Plaza Suite 450, Sin Jose, CA 95113 (408)280-6600 DwG, 1854