Loading...
HomeMy WebLinkAbout1791-185817 10 �-1 F►wY h � ,� ✓E.vvE h i I OFF__ El /✓C y ,ri ✓�,P�iQFi rPv�t _ _ _'oN AE,C1114R11'IVO CO. / ✓EAF-NIZ W CO VICINITY MAP NO SCALE STPWPT IMPP/2ux"F=Nr GENERAL NOTES: 1. THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THESE PLANS AND TO THE AEOUIREMENTS OF THE CITY TANDARD SPECIFICATIONS, PUBLIC WORKS DEPARTMENT, CITY OF FONTANA REFER TO DEFINITIONS AND TERMS IN CITY STANDARD SPECIFICATIONS. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM FONTANA PUBLIC {V'N WORKS DEPARTMENT PRIOR TO START Of ANY WORK WITHIN THE CITY NV � �i i cr.ri nii.in nrrrnc rn rrirrni. ' PER ASL. PLANS JL//c' 41 P4 Q ✓e /4-/ /✓ Mo / 7 AIA/AX0 I I I I i3 i/ 25 25 21 iQ11 I I I 12 24 V)1 15 23 I 10 I I 1� IU 1722'4 l� i l!� � 9 2e JQI�I ---------� ( a t �u 19 20 30 rl�e A7 Al o 24 25 25 27 28 29 ,k, A/ No / 23 30 22 31 21 32 � A p V 20 33 Q 2 A � J �,I 19 18 17 15 15 3 2 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 8 7 TRACT N0. /P.4 •4 \/ C- - - - 1 No A/d _5 /y 41 Nd 2 i 30 29 18 1 16 15 14 15 14 13 lg152-3 12 11 to 9_ e C 20. NO LATERALS SHALL BE PLACED UNDER DRIVEWAYS. 31 28 FONTANA STANDARD DETAIL 112, I00J I t4f 10 �-1 F►wY h � ,� ✓E.vvE h i I OFF__ El /✓C y ,ri ✓�,P�iQFi rPv�t _ _ _'oN AE,C1114R11'IVO CO. / ✓EAF-NIZ W CO VICINITY MAP NO SCALE STPWPT IMPP/2ux"F=Nr GENERAL NOTES: 1. THE CONSTRUCTION OF ALL PUBLIC IMPROVEMENTS SHALL CONFORM TO THESE PLANS AND TO THE AEOUIREMENTS OF THE CITY TANDARD SPECIFICATIONS, PUBLIC WORKS DEPARTMENT, CITY OF FONTANA REFER TO DEFINITIONS AND TERMS IN CITY STANDARD SPECIFICATIONS. 2. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM FONTANA PUBLIC {V'N WORKS DEPARTMENT PRIOR TO START Of ANY WORK WITHIN THE CITY NV � �i i cr.ri nii.in nrrrnc rn rrirrni. ' PER ASL. PLANS JL//c' 41 P4 Q ✓e /4-/ /✓ Mo / 7 AIA/AX0 I I I I i3 i/ 25 25 21 iQ11 I I I 12 24 V)1 15 23 I 10 I I 1� IU 1722'4 l� i l!� � 9 2e JQI�I ---------� ( a t �u 19 20 30 rl�e A7 Al o 24 25 25 27 28 29 ,k, A/ No / 23 30 22 31 21 32 � A p V 20 33 Q 2 A � J �,I 19 18 17 15 15 3 2 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 8 7 TRACT N0. /P.4 •4 \/ C- - - - 1 No A/d _5 /y 41 Nd 2 i 30 29 18 iT 16 15 14 15 14 13 lg152-3 12 11 to 9_ e C 20. NO LATERALS SHALL BE PLACED UNDER DRIVEWAYS. 31 28 FONTANA STANDARD DETAIL 112, I00J I t4f -11e,*, ���, ye a.4 PLANS AND TRANSFER -BUILT' INFORMATION PRIOR TO 7 6 ' sr�lE 01VI ��P CITY ACCEPTANCE OF THE SEWER SYSTEM. 32 1i 27 i9 C70LrTN .S 7,ZEL"T �I�o� � bf�w I ►� MCCUTCHAN CO., INC. CITY OF FONTANA , CALIFORNIA / s,I 265 N. SAN GABRIEL BLVD. (818) 795-5162 PUBLIC WORKS DEPARTMENT - - 0 - ` GERALD E. TUTT R. C. E. O3 INSTALL 8" IG -x1 -F -,A VITRIFIED CLAY 83 v 2s 20 Checked by: 4-ZC' 'li� -,�� Dwq. No. Approved 'APP. PIPE PER CITY OF FONTANA STANDARDS AND 710 �� 8 �8 �,-� 4 SPECIFICATIONS./y/ O 27 7'6-5' / X 0 e,V Z5744/ 72'� �y FONTANA STANDARD DETAIL 125. 28 16 15 f/ 25 24 23 22 21 11 12 13 16 i 1 �` 26 -4 Q 29 10 18 ` I 2530 A � O 19 24 1 I 20 23 31 KJA Y 13 14 f 2 3 4 5 g 1 8 2232 SEE' J I,/ T Z a 2f MAI � INDEX MAP SC4 L r / "= / oo 1 PRIVATE ENGINEERS NOTICE TO CONTRACTOR 1. ALL UNDERGROUND UTILITIES OR STRUCTURES REPORTED BY THE OWNER OR OTHERS, AND THOSE SHOWN OF THE RECORDS EXAMINED ARE SHOWN WITH THEIR APPROXIMATE LOCATION AND EXTENT. 2. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE NATURE OF EXISTING GROUND AND/OR THE FINISHED GRADE IN THE VICINITY OF THE PROPOSED CONSTRUCTION AREA IMMEDIATELY PRIOR TO CONSTRUCTION. 3. THE CONTRACTOR IS L EQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES OR STRUCTURES FOUND AT THE SITE. IT SHALL BE THE CONTRACTOR'S REPSONSIBILITY TO NOTIFY THE OWNERS OF THE UTILITIES OR STRUCTURES CONCERNED BEFORE STARTING WORK. 4. THE CONTRACTOR SHALL UNCOVER ALL UTILITIES THAT HE MAY BE JOINING, CROSSING OR PARALLELING PRIOR TO ANY CONSTRUCTION TO VERIFY BOTH HORIZONTAL AND VERTICAL LOCATIONS. ANY CONFLICT OR DISCREPANCY SHALL BE BROUGHT TO THE ENGINEER'S ATTENTION PRIOR TO CONSTRUCTION, OTHERWISE THE CONTRACTOR ACCEPTS FULL RESPONSIBILITY FOR ANY COSTS OF RELOCATION OR ADDITIONAL COSTS OF CONSTRUCTION. 1415214152-1 14152-2 14152-3 ALL STATIONING REFERS TO CENTERLINE OF SEWER. 4. ALL UNDERGROUND WORK SHALL BE COMPLETED PRIOR TO PAVING OF STREETS. 5. EXISTING UNDERGROUND UTILITIES ARE AS PER AVAILABLE RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE ACTUAL LOCATION AND ELEVATION IN THE FIELD. 6. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE EFFECTIVELY GUARDED BY A SHORING - SYSTEM, SLOPING OF THE GROUND OR OTHER EQUIVALEN MEANS. TRENCHES LESS THAN FIVE (5) FEET IN DEPTH SHALL ALSO BE GUARDED WHEN EXAMINATION INDICATES HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED. 7. THE CONTRACTOR(S) SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK AS DESCRIBED IN NOTE 6 ABOVE FROM CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. SEE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SECTION 306-1.1.6. 8. REFER TO CITY OF FONTANA, UNDERGROUND UTILITY LOCATION STANDARD DETAIL 129. 9. ADEQUATE STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORKS TO THE PLAN GRADES. CONTRACTOR SHALL NOTIFY THE ENGINEER 48 HOURS PRIOR TO THE CONSTRUCTION NOTES AND 4UM ITY ESTIMATES ANTICIPATED START OF CONSTRUCTION. N0. ITEM 11415.2 I4I152-•1 114152.2 lg152-3 Ol INSTALL STANDARD KANHOLE PER CITY OF C 20. NO LATERALS SHALL BE PLACED UNDER DRIVEWAYS. NO. 14376 FONTANA STANDARD DETAIL 112, I00J I t4f -11e,*, ���, ye a.4 PLANS AND TRANSFER -BUILT' INFORMATION PRIOR TO • ' sr�lE 01VI ��P CITY ACCEPTANCE OF THE SEWER SYSTEM. Of CAl � e,J s -r q �. t_ 8 " C I F' � C'o H c � e �e �h crt�c�-► � � `� �I�o� � bf�w I ►� MCCUTCHAN CO., INC. CITY OF FONTANA , CALIFORNIA 0 265 N. SAN GABRIEL BLVD. (818) 795-5162 PUBLIC WORKS DEPARTMENT PASADENA, CALIFORNIA 91107 ---- Drown by: �OUTHRIDGE VILLAGE Scale/f Nd4Cdt 0 �. r A s , TRACT NO. 141521-11-21-3 GERALD E. TUTT R. C. E. O3 INSTALL 8" IG -x1 -F -,A VITRIFIED CLAY Checked by: 4-ZC' 'li� -,�� Dwq. No. Approved 'APP. PIPE PER CITY OF FONTANA STANDARDS AND 710 �� 8 �8 �,-� 788�f SPECIFICATIONS./y/ O INSTALL 4" SEWER LATERAL PER CITY OF 7'6-5' / X 0 e,V Z5744/ 72'� FONTANA STANDARD DETAIL 125. 10. AS BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE CITY OF FONTANA. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE RESETTING OF ANY SURVEY MONUMENTS, STREET CENTERLINE MONUMENTS, OR BENCH MARKS WHICH ARE DISTURBED DURING CONSTRUCTION WHETHER THEY ARE SHOWN ON THE PLANS OR NOT. 12. ALL MANHOLE AND CLEANOUT FRAMES AND COVERS SHALL BE CONSTRUCTED 6' BELOW FINISHED GRADE BY SEWER CONTRACTOR AND SHALL BE RAISED TO GRADE BY PAVING CONTRACTOR AFTER COMPLETION OF PAVING. - 13. ALL 4' HOUSE SEWER LATERALS SHALL BE INSTALLED ON A 2% MINIMUM GRADE UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. INSTALL SEWER CLEAN OUT AND CLEAN CUT ®OX FOR ALL HOUSE LATERALS PER STD. 125 AND STD. 125-A RESPECTIVELY. 14. TERMINATE ALL 4' HOUSE SEWER LATERALS 3' INSIDE THE LOT WITH A PLUG. SHOULD A PUBLIC UTILITIES EASEMENT LIE CONTIGOUS TO THE STREET R -O -W, THE LATERAL SHALL EXTEND ACROSS THE EASEMENT AND TERMINATE 3' INS;DE THE LOT AS MEASURED FROM THE UTILITIY EASEMENT LINE. I..IDATC- P.AL TO r3LL COKST ulJDk;_:-2 DPwy, 15. CHIS. 'X' SHALL BE PLACED ON THE CURB OVER LOCATIONS OF SEWER LATERALS BY THE SEWER CONTRACTOR. 16. IT SHALL BE THE CONTRACTOR'S -RESPONSIBILITY TO VERIFY THE HORIZONTAL LOCATION AND VERTICAL ELEVATIONS OF ALL UTILITY " Y . TY I N 4 BAR LaNGIT (TYP. OF 4� NOTES (CASE 2) CROSSING FOR ALL UTILITIES CONSTRUCTED PRIOR TO THE SEWER. -- -� i