Loading...
HomeMy WebLinkAbout1788-1GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THESE PLANSI AND THE CITY OF FONTANA PUBLIC WORKS DEPARTMENT STANDARD SPECIFICATIONS DATED 1975, WF}I3M i1'BD8741FOii411FSRSFD® D9PA'RTM13NT- OIt�--PUR&-IG�:-WORIf9°`'°'S'P'ANDARE>"DRA*INGO-RH'A]brb -BB FOFrbOWN&o ANO SPEC/F/CA7'tON5. 2. CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILI- TIES, ALL PERMITS SHALL BE OBTAINED AND PAID BY CONTRACTOR. 3. ALL PIPES OR STRUCTURES OF ANY KIND AND TELEPHONE, OR POWER POLES, WATER METERS, VALVES, HYDRANTS, IRRIGATION STRUCTURES, ETC., SHOWN OR NOT SHOWN ON THESE PLANS AND LOCATED WITHIN AREAS TO BE IMPROVED AND INTERFERING WITH CONSTRUCTION SHALL BE RELOCATED AT NO COST TO THE CITY OF FONTANA. IT SHALL BE THE CONTRACTOR'S RESPONSI- BILITY TO NOTIFY ALL AGENCIES CONCERNED. 4. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN 5' IN DEPTH SHALL BE EFFECTIVELY GUARDED BY A SHORING OR SHIELDING SYSTEM. TRENCHES LESS THAN 5' IN DEPTH SHALL ALSO BE GUARDED WHEN EXAMINATION INDICATES HAZARDOUS GROUND MOVEMENT MAY BE EXPECTED. PUBLIC SAFETY SHALL BE CONSISTENTLY GUARDED AT ALL TIMES, AND NON-COMPLIANCE WITH THIS NOTE SHALL BE CONSIDERED THE CONTRACTOR'S RESPONSIBILITY. 5. THE CONTRACTOR(S) SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK AS DESCRIBED IN NOTE 4 ABOVE FROM CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. SEE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUC- TION, SECTION 306-1.1.6. 6. CONTRACTOR SHALL FILLET BOTTOM OF MANHOLES AND OTHER STRUCTURES WITH CLASS "A" CONCRETE SO AS TO ALWAYS PROVIDE A SMOOTH TRANSITION ON FLOWLINES BETWEEN INLETS AND OUTLETS. 7. EXISTING UTILITIES SHALL BE MAINTAINED IN PLACE BY THE CONTRACTOR UNLESS OTHERWISE NOTED. CONTRACTOR SHALL BACKFILL WITH SAND A MINIMUM OF 24" AROUND UTILITY LINES. 8. ALL PIPE TO BE INSTALLED WITH BEDDING AS -SHOWN ON-THESS) A PLANS)AND D -LOAD AS SPECIFIED. 9. COMPACTION OF BACKFILL SHALL BE VERIFIED BY CONTRACTOR AND APPROVED BY THE DEPARTMENT OF PUBLIC WORKS PRIOR TO THE PLACEMENT OF THE PERMANENT PAVEMENT. F6RMANEN7i 'PAVEMENT` SHALE- BE °RKPLACBD WITI+lN--10} DAY3„OP�-•BXCAVAT-ION) =*-4-MINIMUM °^OF •s3. INE HM OF'---ASPHA PAVINt3-'8HAL115r-BWVPtAe8I1 3 `SAND 'COMPACTED 114 --SUCH- A- MANNER AS- TO. PROVIDE -A _'SAFR-AND SMOOTH .VRAVBLEIT �8URFACK., 10. PRIOR TO PLACEMENT OF PERMANENT PAVING, EXISTING PAVE- MENT SHALL BE CUT TO A NEAT STRAIGHT LINE. PAVEMENT CRACKED ADJACENT TO THE TRENCH SHALL BE REMOVED. 11. ALL EDGES OF EXISTING PAVEMENT BEING JOINED AND SURFACE BEING OVERLAID SHALL RECEIVE A TACK COAT OF ASPHALT EMULSION WHICH SHALL BE APPLIED AFTER WATER CLEANING. 12. TRENCHES OF 300 FEET OR MORE TO BE PAVED WITH A SELF- PROPELLED PAVING MACHINE. 13. TRENCH FAILURES SHALL BE REPAIRED BY THE CONTRACTOR IMMEDIATELY. UPON FAILURE OF THE CONTRACTOR TO PROMPTLY COMPLY, AND UNDER ORDER OF THE CITY ENGINEER, TRENCH FAILURES SHALL BE REPAIRED AT THE CONTRACTOR'S SOLE EXPENSE. 14. IN ALL PIPE CROSSINGS CONTRACTOR SHALL COMPACT BACKFILL BY LAYERS, AT OPTIMUM MOISTURE CONTENT. COMCAST CABLEVISION 1257 W. BROOKS ONTARIO, CA 91761 (714) 350-2344 FONTANA WATER COMPANY 16803 SPRING STREET FONTANA, CA 92335 (714)822-2201 CITY OF FONTANA ENGINEERING SERVICES 8353 SIERRA AVENUE FONTANA, CA 92335 (714)350-7610 SOUTHERN CALIFORNIA EDISON COMPANY 300 NO. PEPPER AVENUE RIALTO, CA 92376 (714)820-5598 PACIFIC BELL TELEPHONE 3939 CORONADO STREET ANAHEIM, CA 92807 (714)999-5514 SOUTHERN CALIFORNIA GAS COMPANY 1981 W. LUGONIA AVENUE REDLANDS, CA 92374 (714)884-9411 Q NOTE . SEE P,eO EJECT SPEC/F/CA T/OA/S FO,p CO,^-7OG 6- 7-6 L/T/L / TY L IST/A/i!� Wal .q ArorAdd J$iltj nds k2-0 ^ Bom e Mesh A PLAN 3/40 Die. Galvanized Steel Bar NO *CALK Protection Bar -� • 1 e"ca 12"cir F1 y 1577 arawlEkr ~ 4�4 Bars e" O.C. e Moth we" •Go Ste Su0/ort lf W Slope. IN"per ft, f 3" PROTECTIONI BAR DETAIL i Protection Bar No Scale Detail Relate • 442 DOW a � " (s♦» Detail)1�" ft• g .�= 4 SIoOe' titNwnixM ,•, ' e• or Clew i' !tool Mate Curb s■ladkaF*_;;��'o Bar- ATho"tkro d: ~_ E ac �.' ( a" MM By} , qufMl PIN or qtwl Support 30 Radius IMey So In Any Well) Boit M 6' or "Cies. AddIA4 Bars Distonelly Lamer Inlet Araeld Pipe �: e� SECTIQN A -A• SUPPORT BOLT DETAIL NOTES, -NO $CALK No Scale AEMODIFIED DIMENSIONS. L Outlet Pipe Shell Be Trimmed To Final Lentith And Shape Before Concrete Is Plan" IL Floor of BeeN Shill Se Olven A Steel Trona Finish And Shell $too Fran All Dkrlaflons Towards The Outlet Pipe. &Wells And Floor Shell Be Reinforced With IF4 Doforwad Bars ell" O.C. Both Mays. 4, Concrete Shell Be Ctrs "A" 16 Seeks Portland Conant Por Cubic Ysrd). B. Verbs to stats% be ek of slNowollt rrboR snNo4116 ' .R.tvteaP•tt-et:,..t.l.lwefie.5 RJS MODIFIED CITY__ Of FONTANA, CALIFORNIA DirChocked By wn By RE" MODIFIED (/�JOD/�'/E'D } Approved- ' DETAIL CURB INLET STRUCTURE 'r Dot.. 121 STORM DRAIN PLANS JUR UPA INDUSTRIAL PARK NORTH FONTANA, CALIFORNIA STORM DRAIN MAIN STORA DRAIN LATERAL 30•! 40. 50•! t30•� 70. 90• 9 ' 30.1 40.150• e0• -T-7--60.0 A INDEX MAP 0 . 40 SET 51-/ EET 1A1,0Q,1 BEECf7l A VEA/UE 44 EG 1, L A 05it/4/E 7/8,3 NOTES was r,•f s19■w) NOTES APPROVEO oAT7f LIC WORKS DIRECTOR •R.C. 8793 I� 12' 1.4 14 t. 1 ' m-� I ' afllen•I°"hid• d _ 15"1. ' is Fa„ Aral U DER > t' Deas 1 fro rf c.na�. T'c- I - TABLE of ube3 for F am on this standard Drawing, Sheet I. ,.•`1 1 2 09 0A 04 1. 1. 1.7 i S' .1 1 1. • 1. 1.1 I I .;,�• :�;.• :•. :,T 1 - VALUES f o r A B C' D 1 D 2 E' L' Elevation R and Elevation S are ® shown on Improvement Plan (see sheet 3 of 3). TABLE of values OTHERS - P , 30'IMj 2 - CENTER OF MANHOLE SHAFT shah be located owe. cater fine Of storm drain when 4writter D, is 40'or less. nwhidtcaseplaceEborssymmetricaq)raroundshaFtai4s•rithce"hrline. . 1 Bs • 21. 0 1 1 • 1. i:o 1.4 0.2 1.• ♦. ,.9 ,. ,• �.•;;r •' ! •,: for F and T shown on this Standard Drawing, Sheet 1. {•, ' '' 19" z. 1.• I 1. 1. 1' 24' 1 A -3- LENGTH L shaN be- 1-fu11133 shorn otherwise on' . At of Contractor L be Nen". ;/� 1.e 1. 1. 27' ' ' • 21" 1. : 1 • , . a S.2 4.0 .4 .0 z.7 , x.• '•'''r f B T 2 - OPTIONAL CONSTRUCTION: When Juction Structure B is specified P improvement the Contractor shall have the s- PUN o '• Qlsnp aid cow 0* Aws) E ba7 incmased a location of MWhok shifted 10 Mee 47 DETAIL 111: When depth of ma kIe from street Inde to top of ball 41133 than Y -10P for pared strIlth or gv\ 30• 1 1 I . I 1. 1. o. 24• 3.a :a zo I. 1.. I. s on plan, option of in 1 • rirMs 4-4'' a n*t Y- V for ulpared strteb, construct monolithic shaft as per Detail M. The Contractor shag hm the ' 33' {' 43.0 constructing Junction Structure C which case construction g data will be furnished b the Cit; Engineer. s•? _. _ -- option of cautrudinj shaft as per Detail M for any depth of ma k1e. When ciameter a is Wer i „en 3e' • 4 I • 1.1 .7 0. �■ 4 I ' 1 • 1 1 e I. 1.2 0.• 0L 1 .{ r 'T ' y y g I �+ ( " ., ,. Isis. center of shaft Elmet be located 13 per Note 2.3. - ' '^:. • ';;' 3 - CONCRETE s h a 11 b e i n accordance with the tab 1 e o n Sheet 1. Or �--- C S THIG(tr�SS OF DECK Shnl nary when necessary ro proride krd pipe seal, but shall rat be 11ss than tabular 39" C •' • 30' I. 1. •''.' �, ; i f. F F f.r,sled stab D�--I �2• robes far F Shorn an this planfor. , 17 •• 4 - FLOOR of structure shall be steel -troweled to 1' 11�•Y.d PLAN (3A•ff �1= } E 6- REN IFMING STEEL 3611 be round.dah nled ban, 11i -Clear from fate Of C011Cmte 1M1e33 $11 M Otherwise. t" 1 N 1.4 0.4 i9 .1 I. 1. o springing ins. .1 33 •1 tsars 4.4 0 21 I. 0.9 .4 l .1 .1 4• 4. 4. ® - Sats alld Ienath3 are slsorn sl table belor' ' SECTION G -G 4. 4. lnetGrad Yaliti• Ines ad error Al w"" Foundry ; A -149x, 5 - REINFORCING STEEL shall be round, deformed, straight bars, 48" +.• 3. z. 1.3 1.0 0. Sg• 4 or 9Cua appraedby City �"Oban 7 -CONCRETE shoe be in -accordance with the Coble of Conaet• Sp.citicotions. ■ s.l •.e ♦.1 .7 3. 1iIIjS aril redulx ® 8- STEPS shah be �"mw4jahratked steel and anchored not 63s than 6 inches in the wags of structure. Unks3 1 1/2" clear from face of concrete unless otherwise shown. 51 4. 1. 1 c •. ♦ ' I. 3MStt1•dard `' ■ c ..s 3.z 4.4 CO 37 3.3 aq No 431. edp dherwise shown the spacing shah bo i'-S'on ceders. The Iolrest step shah be not more than 2'-6' 1ABLE Of 4"S FOR F AND T n .. 1.7 LI o.3 .p}•� Pi/•d 111 3 abort the irNert (N/wrtbn Fdy. A-3320 Or equal opP d by alit) Q Tie b Our S s ha 11 b e No . 3 and spaced 18 on centers or c 1 o s e r . �■ • ♦ + • •. 3f-6' g- Rte, REDUCER.Am PIPE far access shaft shag be seated Int mortar and neatly Fardel or wiped T 3.4 3.7 2.. 1.• I.1 0.. 42 4. .• See II•Is 4 , •J, inside the A A. rz 4 7 4.7 4 4 I Y� ''Tl :,. lh;A A and B bars need not be longer than the outside diagonal s 3.• 7 1.9 1_J 4f.: o.. 45■ `1 ♦:o z9 1 { : .� i •dc ��.,Y<Y}4 IO -STATIONS of manMla shown an inprovemalt pbn appfy at caaltra of shafk Eleralions sho.n at sMions refer I* width of the lateral sur. a3" s'■2"o�•s� prolon�ed'nwrt�radefines Q ' P �. 4.1 3 • 4. • I :3 1.1 L I . I '. L ♦ ' I. r-a•QC. E az ,.3 3.o 48" E s.3 ,.1 3. i 1 7 bars DETAIL U 1 I - FLOOR of marJwk shah be Stell -troweled to sprbog W. 6 - STEEL SCHEDULE detailed on improvement plan. 69• C 7.9 s.3 3. 4.• 4.{ ♦. � *k 4) �theCOftWW3W hMthf Of 4 4-4 1 ■ ,;,Y, �. Clam 12- BODY of ma hk shall be pourW in ane cmdi *w operAW.auepl aplion 7 - ELEVATION S applies at center of main line on prolongation of 72" •.7 1.{ 0.7 51 E II `:T 7. 2 5.9 3.1 i! a■A at #0 Gieatonstnlctiolt"JIliw TA PLAN • c as 6.• s.s 3.z ♦s • • 54" c .7 4.1 1 _� kl �Ai•. •' invert of spur. 75 _ _ �■ Fs .0 3.9 44 411 L 12.0 9.3 7.• I , 8 - JUNCTION- STRUCTURE shall be poured in one continuous operation EXAMPLE: �.: 3.0 . Ss z.4 I.s o.7 c .PL., • 91 • 1 7 I ♦ 57 4 except that the Contractor shall have the option of placing at Given: E 7.4 3.1 3.. z.3 1.6 0.e L 1z. 9.7 e. 72 s.7 • _; • c as 7.s •.4 3. s.3 s.1 ..•. �• •!alis the springing line a construction joint with a longitudinal D2 = 60" e4 • I. 60" 1 4 ': •? �'�:'�" a iki•satlttt e" To errs- bre �!-A bars / staltderd pP• ICeyW ay' = 97" .♦ i I .1 7. '.e..1: t; • .,a ;�: •.; ..,••. w. .�1 39" E •.0 39 .�.��j� ��. �•1``',. .. ,,:k , ,' i •%:: :'� •.�. •! . y • i�; �, I� = O W 2. 1. o.e 63 ,. ♦ 1. 1.1 L' .:•'�{."'r•• ;. f t ,: �::;.. = • • LE 111, 13:. 1 • . TA6LE Cf VALUES FOR f O E .z 7 4o i 1.7 0. 0.• oro • 7.s 702 F L't;;. •r;t�;; •.• 9 - LENGTH L (shown on improvement plan) may be increased at option of ind: C' r' • 1 • • s. 3. c •., ♦,• • ,,• ,•, SECTIONA-A- ••;•► I - ► Contractor to meet pipe ends, using C bars in extended portion of • • • 1• 09 66" 7. • {:7 ♦.I • I ♦ P. .4 .• L 14.3 11.1 9.♦ •.3 7.. 7.3 same diameter and spacing as specified on improvement plan, but any 3 LUTI�^N: E ore ..1 4. 1.9 0.9 • ,.9 . I. i. E >rl•wLseeMrlrS1W 7P AY change in location of SPUR must be. approved by the City Engineer. 1• n 7.4 ' s• Ae • 43 3.9 • L_ I Enter S"orn Drain Main Table with Given it � -AW F � F I i D2 & A. Cm= 4. 7 f t EM= 2.7 f t 72' [ i• s.l 3.e •. I. i I V �se 41 1 t 10- STATIONS of manholes shown on improvement plan apply at inter- ,.7 , , • l� section of main line and spur. Elevations shown at this point ,• lie Isn ';:'• T ban i refer to prolonged invert grade lines ' except that when inter- 2. Enter Storm Drain Lateral Table with Given 75 L lel `'3 106 :7 i'. .. n S► CIFICAT N as APPROVEO oAT7f LIC WORKS DIRECTOR •R.C. 8793 CITY OF RIVERSIDE PUBLIC WORKS DEPT. - ENGINEERING DIV. �• -t• see -e -use d _ MAX QA- r :''•:` s'ra " section of center lines falls outside•of structure the eleva- B & A. C = 2.4ft E 2.9ft L = 5.8ft Te ' t a spaced :; : ,:: • •. 7. '• r ss . L L •. e. 3.4 • • •.♦ ,.z 1 D hers shah be spaced Snore E cars sliaN Int spaced 4"o t Tie bars shall be IVo 3 IB" ac •. ;:; . ,.• :,°:.::_;:.' :t •' , 4'-, s -c-iii• tions are shown and apply at extreme lower end of the structure. I I I adorer w't ' ; �.�" ':::•: " : - : % ' • ' , -„' • - 4-3250 3. C' - CM + CL - 4.7 f t + 2.4 f t - 7.1 f t B i ■ • 9 4.1 4.1 I Who L Item than 546 speci(Ied on 6KIi remail plan, cal►ni w D ban at 6"at. •. :• �. ie.:.•:.:+:•: Ceara TABLE .OF BAR SIZES 11- LATERALS - Where laterals enter on both sides of structure, they ' ' ♦ 11 9 .' •..�� �=::- '� 1� tb3sbarl►inta6kareforbnat sWhere shorterbanare required,kndorat shall be designated on the improvement plan as right or left, 4. E' - E + E - 2.7ft + 2.9ft = 5.6ft e4" 9. 7. • ♦.3 3-11 ::s r,,, rti •"b a � jf-N• O2 or B A t13 born Dor F ban M L 16. 4 4 . 1 IO met r remMt3• facing in the direction of stationing. T ped, � pb' an M -M N" 12'•39' No s of 3" No a ot6" 5. L L + 2ft 5.8ft + 2 ft 7. Sft 4• I ' 87 •' q SECTION 8-B 13- COVER •Ito11 have !otter D in center.. 42=84" Mo.6at3" No.S016' L 1•. ; 1•w 1 .1 ' w. 9.• • 9.• .•'-��//tel.-. r '� • , .. • �� ', ii ' K 1 ' PTIONAL TR CASE I FONTANA VICINITY MAP N. T, 5, DROJECT 4REA AN WMAROINO CO. IVERSIDE CO. PRIVATE ENGINEERS NOTE TO CONTRACTOR THE EXISTENCE AND LOCATION OF ANY UNDERGROLM UTILITY PIPES. CONDUITS OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHCWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAXE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS REOUIREMENT SHALL APALY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURSt AND THAT THE CONTRACTOR SHALL. DEFEND. INDEMNIFY AND HOLD THE COUNTY THE OWNER -AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJEC�. EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. FELIPE R. CABRAL R.C.E. 20001 DATE MA)C/MC//"1 G✓/OTh� fOR fAY/"lENT FO/2 3Q-RtVA6 E ,Q�cPG,4 CEMEit/T:OF ,4• C. �,4VE/'/ENT EX/sT A_ C.Z _ -- -7 - H - i h Q 01A 0 A■C. PAVEMENT PAY LIMIT DETAIL BENCHMARK NS 288 R.R. SPIKE IN PP N2 71833 AT N.E. CORNER OF POPLAR AND SANTA ANA. ELEVATION 1019.83 RC (SEE NOTE 1) APES FOR W SEE TABLE BELOW CASE 3I P PIPE CONCRETE SLO S CASE I>Z CASE= (FOR EXISTING PIPE) W E COVER 90�f44' No.Tal3 No.6at6 PI P APPROVEO oAT7f LIC WORKS DIRECTOR •R.C. 8793 CITY OF RIVERSIDE PUBLIC WORKS DEPT. - ENGINEERING DIV. _/ /, APPROVED DATE . P LIC WORKS DIREGTOR•R.C.E. 1.793 CITY OF RIVERSIDE - PUBLIC WORKS DEPT. ENGINEERING DIV. APPROVE DATE _ ��, //x/78 BLIC WORKS DIRECTOR • R.C.E. 1.791 MAX IN Aral U DER > t' APPROVED LIC W104KS DIRECTO R•R.C.E1� E" 15"V OVER CP > JUNCTION STRUCTURE C Not. 25• e=a11r.-aApproval - 4-7-81 - - - -- - MARK' REVISIONS APPR.. GATE OTHERS >8 10". s" ALL 'ddln.d .pPrw.I ,19.�R •f•9-82 B�_ �� R'v«�•%fd t•-.A�� b �- ?-7.84_ � --- __ __ MARK' REVISIONS APPR. DATE 12" {•, 90�f44' No.Tal3 No.6at6 (Adapted from Cit of Los Angeles Std. Plan N - APPROVEO oAT7f LIC WORKS DIRECTOR •R.C. 8793 CITY OF RIVERSIDE PUBLIC WORKS DEPT. - ENGINEERING DIV. _/ /, APPROVED DATE . P LIC WORKS DIREGTOR•R.C.E. 1.793 CITY OF RIVERSIDE - PUBLIC WORKS DEPT. ENGINEERING DIV. APPROVE DATE _ ��, //x/78 BLIC WORKS DIRECTOR • R.C.E. 1.791 (Adapted from Cit of Los An .I•s std len no. 0* flow CITY OF RIVERSIDE PUBLIC WORKS DEPT. - ENGINEERING DIV. 1.9 A►PRWE E� uc WORKS o1RItCTOR•R.0 E CITY OF RIVERSIDE DEPT. DIV. APPROVED LIC W104KS DIRECTO R•R.C.E1� CITY OF RIVERSIDE'` PUBLIC - ENGINEERING DIVRevision-1 APPROVE 2.7 JUNCTION STRUCTURE C Not. 25• e=a11r.-aApproval - 4-7-81 - - - -- - MARK' REVISIONS APPR.. GATE MANHOLE AX tp9s �WrI 46/4 u - .i•■ PUBLIC WORKS -ENGINEERING JUNCTION STRUCTURE C Defined Engineer �,¢ 4c-7-8 WORKS.DEPT. JUNCTION STRUCTURE C 'ddln.d .pPrw.I ,19.�R •f•9-82 B�_ �� R'v«�•%fd t•-.A�� b �- ?-7.84_ � --- __ __ MARK' REVISIONS APPR. DATE MANHOLE A oN �;'"° N,r mro-« ® added Sheet 3 STANDARD DRAWING NO. 42 2 Shoot 7 of 3 1 STANDARD DRAWING NO. 3O Sh..t 1 of ! STANDARD DRAWING NO. 3 Sheet 2 i STANDARD DRAWING NO. 422 STANDARD DRAWING NO. 4 •' ' MARK RLVISIONS APPR.1 DATE REVISIONS SCALE : PLANS PREPARED BY$ sEal No. DESCRIPTION APPR. DATE " _ AS JOHN EGM' and ASWCIATES, INC. �2t`. .``�l!�rfic� JOHN EGAN & ASSOCIATES, INC. 1 =SHOWN ;k`', � `;= Consultin Engineers DATE, r`;�' `'� `f': ,t,,. 9 9 FELIPE R ABRAL R.C.E.No 29001 "' ``•' G s-/ANGc //✓� EX-M�� • ,�,.- , �_ � ''I (5�'jf1 t cx; ��,r; TITLE, CHIEF ENGINEER DATE / I 1{) a �\ .� Ex� 366 ORANGE SHOW LANE JOB No. DRAWN BY, DESIGNED BY, CHECKED BY, �, ,� „ / ; � SAN BERNARDINO, CALIFORNIA 92408 0 90-18-88 J.P.G. F. R. C.Rry 1, as g 3 r' a 'J� f 714) 889-0676 t 714) 825-1550 NOTICE: CONTRACTOR SHALL NOT' FY Q UNDERGROUND SERVICE ALERT 48 HO'.IRS PRIOR TO E'CAVAT IN( AT 1- -*00`'422-4133 CASE M CASE N LOAD FACTOR _ - 1.s Q - 1.9 2'.1 ori 314 D' 2.7 ZZL D'+ 1" 3.2 S - 4.5 Y - 2.e ` RIGID PIPE DESIGN DATA #SEE NOTE e. Z% NOTES FOR PIPE BEDDING 1 1. UNCLAS IED BEDDING MATERIAL SHALL BE AS FOLLOWS; A. NATI SOIL MAY BE USED FOR RIGID PIPE INSTALLA ONS UNLES OTHERWISE SHOWN ON JHE PLAN. B. GRANULA MATERIAL SHALL BE USED FOR FLEXIBLE 'IPE INSTALL A ONS (SEE NOTE 2). UNCLASSIFI BEDDING MATERIAL SHALL BE FIR OF LUMPS, ROCKS', AND OKEN CONCRETE OR ASPHALT. RE SHALL BE' TAKEN TO PRO, CT THE PIPES FROM DAMAGE DEFLECTION DURING PLACE T AND COMPACTION OF BED G. GREATER COMPACTION, W REQUIRED TO LIMIT D ECTION OF FLEXIBLE PIPES, SHALL BE SHOWN ON T PLAN. O 2. GPOWULAR MATERIAL S BE SAND, GRA DISINTEGRATED GRANITE, Ct?t/SHED SLAG CRUSHED AGGRE TE OR NATIVE SOIL WITH A SAND EQUIVALENT OF N LESS THAN . 3. WHERE GROUND WATER IS EN UNTERED THE TRENCH THE CONTRACTOR m SHALL, AT THE DIRECTION 0 THE Cr Y ENG, EXCAVATE TO A DEPTH OF 6 INCHES BELOW THE PROP ED 1[PE AND PLACE A BEDDING OF 3/4 INCH CRUSHED ROCK OR CR H SLAG. 4 C ONCRETE_SHALL CONFORM TO SE ION 306 OF THE LATEST APPROVED EDITION OF STANDARD SPECIFI ONS FOR PUBLIC WORKS CON- STRUCTION. 5. TRENCH WALLS SHALL BE VE!ICAL W HIN THE BEDDING AREA, ® UNLES$ IMPROVED BEDDING AS APPRO D BY THE CITY ENGINEER. IS USED. 6. THE LOAD FACTOR MAY INCREASED FOR ASE V BY USE OF RE- INFORCING STEEL. T 3 LOAD FACTOR IS 2 FOR P=0.4%, 4.6 FOR P=1.0$, IN WH P IS THE RATIO OF HE AREA OF STEEL TO THE AREA OF CONCR TE ABOVE THE CROWN •OF•THE PIPE. Ya BEDDING 0 GRA LAR MATERIAL ® UNCLA IFIED REDOING MAT 4 BACKFIL , ® NATIVE S DATECITY OF' RIVERS E'APPROVE DATFSB-%3 CITY OF R _ ERSIDE ._ WORKS DIRECTOR• R.C.E. 19793 PUBLIC WORKS DEPT. - ENGINEE G DIV C ORKSDIRECTOR •RC.E 8134 PUBLIC WORKS. DEPT, GINEERING DIV. LO ADDrif CRuJNEO suw . .,."Il, .(,•5.81 PIPE BEDDING _.8: D� ined Engineer ,ems ,4c78z PIPE BEDD G STANDARD DRAWING NO. 4 - �. STANDARD DRAWING NO.A- 5 2 VISIONS APPR, DATE SMT t OF 2 MARK REVISIONS APPR DATE I T. 2 OF 2 CITY OR FONTANA, CALIOW rO'INIAA PUBLIC WORKS DEPARTMENT Df AWN BY JURUPA INDUSTRIAL PARK SCALE AS SHOWN DESIGNED BY TITLE S H EET DATE STORM DRAIN PLANS 12- 14-88 CHECKED BY ► y DR. N 0. S HT. NO. APPROVED .-� (,t; I O F 9 CIVIL ENGINEER' R.C.E. 9(o4 I78$� BIS SET SHEET