Loading...
HomeMy WebLinkAbout1726-1VILLAGE OF. HERITAGE SIGNING AND STRIPING FOR PRENTISS PROPERTIES BAR HARBOR ROAD , McGUIRE AVENUE , MILLER AVENUE EDISON AVENUE AND CARNEGIE AVENUE CHERRY AVE, SEE DETAIL SHEET 4 —SEE CHERRY AVE. PLAN FOR SIGNING 8 STRIPING ALONG CHERRY AVE. 544 MIZZ2.f,4W'. SEE DET SHEET SEE D E T P SHEET 4 BASELINE AVE. SEE BASE LINE AVE. PLA FOR SIGNING S STRIPING ALONG BASE LINE AVE. ,EE DETAI SHEET 2 SHEET 2 NO. REVISIONS SEE MILLER AVE. PLAN FOR SIGNING 8. STRIPING ALONG MILLER AVE. ii 6 ' ,//I,/ /I CONSTRUCTION NOTES: 1a----- R-1 "STOP SIGN" �--- , t R - / 7 0` e— / 7,9 NO LfX'T TUTS- /V ,3 S " Why/rE Hw TCh'ED MED/, A/- C�---R-26 "NO PARKING ANYTIME" SIGN AT 250' TNTERVALS 5 -"DIRECTIONAL ARROW" AND/OR "STOP" PAVEMENT MARKING 6� -- CROSSWALK a9 -- T'WO W,9Y LEFT nlliw PEEP D1 r,41Z 3. PAVEMENT MARKERS AND TRAFFIC LINES (STRIPING) DIMENSIONS 11 W-56 SIGN 12 R-41 "RIGHT TURN ONLY" SIGN 14 W-11 (RT.) /5 YELLONi H.9TCyE'D P�llvr" MED/.9/V . 1V0r,e:':' ALL CaA197"- er/O/V DETi9& 19iPE PES "Z - rl"Wg grWAl"IW5 a NN ' m @ �s ,ems= ALIGN BAR WITH CURB CURB PROLONGATION ROLONGATIO 0P MAJOR WITH CURB �4 _ STOP BAR AND LEGEND STOP _q1 STOP SIGN LOCAL STREETS TYPICAL SIGNINGrAND STRIPING SEE DETAIL SHEET 3 LIVE OAK AVE SEE LIVE OAK AVE. PLAN FOR SIGNING & STRIPING ALONG LIVE OAK AVE.. CITY OF FCA IFORNIA PUBLIC WORKS DEPARTMENT DRAWN BY `SI�NIN% AND ST P� SCALE B.G. R! ING PLANS FOR HO RI Z. : I'� =100 got3170 REDHILL AVENUE • C09TA MESA, CA 92626-3428 • (714) 641-8777 DESIGNS 83AR HARBOR RD, , MCGUIRE AVE. ,MILLER AVE. , jK.W�B,G, CIVIL ENGINEERING - LAND PLANNING • LAND SURVEYINGCHECKED 8Y EDISON AVE., AND CARNEGIE` AVS . DATE: PREPARED UNDER THE SUPERVISION OF: J"C,_H,. -i JOB N0. DR. NO, SHT. N0, APPROVED Cr /�i -� GCS Lt%� G/i�� ENGR S. DATE CITY / _%/ DATE 410¢ I 0 F 4 ►PPR RO MES R. MAITLAND R. C. E. 33292 DATEc..c� CITY ENGINEER R. C. E. 18932 GENERAL NOTES 1. ALL WORK, MATERIAL AND EQUIPMENT FOR TRAFFIC SIGNING AND STRIPING SHALL CONFORM TO THESE PLANS AND THE STANDARD SPECIFICATIONS FOR CITY OF FONTANA AND THE STANDARDS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA. 2. PAINTING PROCEDURE SHALL CONFORM TO THE STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF THESE GENERAL NOTES. 3. PAVEMENT MARKERS AND TRAFFIC LINES (STRIPING) DIMENSIONS SHALL CONFORM TO CALTRANS TRAFFIC MANUAL. 4. PAVEMENT LEGENDS AND ARROWS SHALL CONFORM TO CITY STANDARD MAINTENANCE STENCILS. 5. TRAFFIC STRIPES AND PAVEMENT MARKINGS ON NEW SURFACING SHALL BE APPLIED IN TWO (2) SEPARATE COATS. THE SECOND COAT TO BE APPLIED WITHIN 30 DAYS OF ACCEPTANCE OF STREETS. 6. PAINT FOR TRAFFIC STRIPING, CROSSWALKS, LIMIT LINES, ARROWS, PAVEMENT LEGENDS, AND CURB MARKINGS SHALL BE RAPID DRY TYPE PER SECTION 84-3 OF THE STANDARD SPECIFICATIONS. REFLECTIVE MATERIAL SHALL BE APPLIED TO ALL TRAFFIC STRIPES (EXCEPT BLACK PAINT) ON THE FINAL FINISH COAT PER SECTION 84-3 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA AND CITY OF FONTANA. 7. THE CONTRACTOR SHALL FURNISH THE NECESSARY CONTROL POINTS FOR ALL STRIPING AND MARKING AND SHALL BE RESPONSIBLE FOR THE COMPLETENESS AND ACCURACY THEREOF TO THE SATISFACTION OF THE CITY ENGINEER. 8. TRAFFIC SIGN DIMENSIONS, COLOR, AND LETTERING SHALL CONFORM TO CALTRANS APPROVED SIGN SPECIFICATION SHEETS. SIGN CODES SHOWN HEREON CORRESPOND TO THE CALTRANS SPECIFICATION SHEET CODES. SIGNS SHALL BE THE STANDARD SIZE UNLESS OTHERWISE INDICATED. 9. MATERIALS FOR SIGNS, POSTS AND MOUNTING HARDWARE, SIGN CONSTRUCTION AND SIGN PANEL INSTALLATION SHALL CONFORM TO SECTION 56-2 OF THE CALTRANS STANDARD SPECIFICATIONS. 10. SIGNS SHALL BE MOUNTED ON METAL BOX SECTION POSTS UNLESS .OTHERWISE INDICATED. POSTS AND INSTALLATION SHALL MEET CITY REQUIREMENTS. 11. THE QUANTITY OF TRAFFIC SIGNING AND STRIPING SHALL BE CONSIDERED ONE LUMP SUM ITEM COMPLETE IN PLACE. THE LUMP SUM PRICE IN THE BID SHALL INCLUDE FULL COMPENSATION FOR FURNISHING ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT FOR DOING ALL WORK INVOLVED IN, OR APPURTENANT TO , THE INSTALLATION OF TRAFFIC LINES AND/OR MARKINGS AND/OR MARKERS AND TRAFFIC SIGNS AS REQUIRED BY THESE PLANS. ALL COSTS FOR TEMPORARY PAVEMENT PAINTING, INCLUDING COSTS FOR SANDBLASTING OF EXISTING LINES AND MARKINGS, AND THE REMOVAL OF PAVEMENT MARKERS, SHALL BE AT THE CONTRACTORS EXPENSE. SEE DETAIL SHEET 3 LIVE OAK AVE SEE LIVE OAK AVE. PLAN FOR SIGNING & STRIPING ALONG LIVE OAK AVE.. CITY OF FCA IFORNIA PUBLIC WORKS DEPARTMENT DRAWN BY `SI�NIN% AND ST P� SCALE B.G. R! ING PLANS FOR HO RI Z. : I'� =100 got3170 REDHILL AVENUE • C09TA MESA, CA 92626-3428 • (714) 641-8777 DESIGNS 83AR HARBOR RD, , MCGUIRE AVE. ,MILLER AVE. , jK.W�B,G, CIVIL ENGINEERING - LAND PLANNING • LAND SURVEYINGCHECKED 8Y EDISON AVE., AND CARNEGIE` AVS . DATE: PREPARED UNDER THE SUPERVISION OF: J"C,_H,. -i JOB N0. DR. NO, SHT. N0, APPROVED Cr /�i -� GCS Lt%� G/i�� ENGR S. DATE CITY / _%/ DATE 410¢ I 0 F 4 ►PPR RO MES R. MAITLAND R. C. E. 33292 DATEc..c� CITY ENGINEER R. C. E. 18932