Loading...
HomeMy WebLinkAbout1654-35GLIST OF INSPECTIONS T%e Contractor shall contact the City's General Services Agency and the Owner's Representative in advance of the following inspections (but not limited to) in the- time indicated: 1. Pre -job conference - 5 days. 2. At completion of finish grading - 72 hdurs. 3. Layout of walkways but prior to installation - 72 hours. 4. Layout of header but prior to installation - 72 hours. 5. Layout of walls, sign walls, pilasters but prior to installation - 72 hours. 6. When trees and shrubs are spaced for planting but before holes are excavated - 72 hours. 7. At delivery of all plant materials to the site - 72 hours. 8. During entire irrigation installation to verify and inspect the following (but not limited to): a. Point of. connections - 72 hours. b. Backflow prevention devices - 72 hours. C. Trenching for pipes - 72 hours. d. ,•:lectrical connections - 72 hours. e. Control valves - 72 hours. f. Coverage -•72 hours. 9. At pre -maintenance inspection - 5 days. 10. At final inspection - 5 days. r PROJECT LOCATION MAP —� Align I.D. PROJECT AUTO Automatic MAX SITE_N,y (L Center Line MIN. Minimum C.M.U. Concrete Member Unit N.I.0 of CONC. Concrete O.C. o•+ CONT. Continuous P.E. ��o C.O. Conduit IL Highland Ave C.P. Corner Pilaster P.O.B. Point Of Beginning D.G. Decomposed Granite e Pounds per Square Inch DIA: Diameter PT. Point uthern Pacific Ralifoa PVC. �o 0 EQ. Equal < Radius EXIST. Baseline Road SCH. Schedule x e Finish Grade SQ. W F.O.W. Foothill Blvd T.P. Top of Pilaster F.S. Finish Surface o Top of Wall GND. Ground Arrow Hwy 0 � • Gallon Per Minute o HORIZ. Horizontal r • C e M C .0 > Y A O < i i w w c`� m San Bernardino Freeway 1-10 11 ABBREVIATIONS AWN. Align I.D. Inside Diameter AUTO Automatic MAX Maximum (L Center Line MIN. Minimum C.M.U. Concrete Member Unit N.I.0 Not In Contract CONC. Concrete O.C. On Center CONT. Continuous P.E. Pad Elevation C.O. Conduit IL Property Line C.P. Corner Pilaster P.O.B. Point Of Beginning D.G. Decomposed Granite P.S.I. Pounds per Square Inch DIA: Diameter PT. Point ELECT. Electrical PVC. Poly Vinyl Chloride EQ. Equal R, RAD. Radius EXIST. Existing SCH. Schedule F.G. Finish Grade SQ. Square F.O.W. Face Of Wali T.P. Top of Pilaster F.S. Finish Surface T.W. Top of Wall GND. Ground TYP. Typical G.P.M. Gallon Per Minute HORIZ. Horizontal SHEETINDEX SHEET NO. SHEET TITLE SHEET NO. SHEET TITLE 35 G COVER SHEET �#QQ. LANDSCAPE CONSTRUCTION FLAN -- �P •I � II it ii m it It W,7 it It 3s K it It It Fines It 11 11 it t I it 35 L LANDSCAPE CONSTRUCTION DETAILS 4- DIM i LANDSCAPE CONSTRUCTION DOCUMENTS VILLAGE, ()F 11.1 -17rlf J(11 = WEST NEIGHBORHOOD L. No. S1 343 Robert Lawson Structural Engineer is responsible for the design of detail 1, 2 & the re,ning w 11 detail 13 of shee Lp41= o y. Las Rdddrt,LaVson, 51343 Datle PHASE 1 B City of Fontana, Ca'. io Z PREPARED FOR: a FONTANA HERITAGE The City of Fontana has reviewed and approved the structure$ within the public right-of-way which are WEST END ASSOCIATES contained in the landscape con- struction plans (sheet # 3S'HZ,T 6101 CHERRY AVENUE/FONTANA, CA 92335/(714)899-2581 f K) and details 1, 3, 7, 8, 4, 13, 14, 16 & 17 (sheet #3S (,.). Said approved does not include any on-site/ PREPARED BY. private facilities. A roved City Engineer R.C.E. 18932 Date Land Group 230 NEWPORT CENTER DRIVE, SUITE 200/NEWPORT BEACH, CA 92660/(714)720-1198 iZr=v1SIOtis ISNGR'S DATE - crrY PA's APPAOVAr - APp oVAI- DATE: OCTOBER 99 1987 ---3 T No. � 35 G