Loading...
HomeMy WebLinkAbout1641-1CHERRY AVENUE I A [BRR�Y PARKWAY Eo L Ea LIBERTY PARKWAY CHERRY AVENUE CHERRY AVENUE ROANOKE ROAD n�PF ad 'i�l�iQ�lFvs MEYER CANYON DRIVE 0 TYPICAL CROSSWALK TgRO�T NOTE: SIGNS AND STRIPING FOR CHERRY AVENUE & E.LIBERTY PARKWAY ARE SHOWN ON SEPARATE PLANS; GgNERAL NOTES 1. ALL WORK, MATERIAL AND EQUIPMENT FOR TRAFFIC SIGNING AND STRIPING SHALL CONFORM TO THESE PLANS AND THE STANDARD SPECIFICATIONS FOR CITY OF FONTANA AND THE STANDARDS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA. 2. PAINTING PROCEDURE SHALL CONFORM TO THE STANDARD SPECIFICATIONS AND THE REQUIREMENTS OF THESE GENERAL NOTES. 3., PAVEMENT MARKERS AND TRAFFIC LINES (STRIPING) DIMENSIONS SHALL CONFORM TO CALTRANS TRAFFIC MANUAL. 4. PAVEMENT LEGENDS AND ARROWS SHALL CONFORM TO CITY STANDARD MAINTENANCE STENCILS. 5. TRAFFIC STRIPES AND PAVEMENT MARKINGS ON NEW SURFACING SHALL BE APPLIED IN TWO (2) SEPARATE COATS. THE SECOND COAT TO BE APPLIED WITHIN 30 DAYS OF ACCEPTANCE OF STREETS. 6. PAINT FOR TRAFFIC STRIPING, CROSSWALKS, LIMIT LINES, ARROWS, PAVEMENT LEGENDS, AND CURB MARKINGS SHALL BE RAPID DRY TYPE PER SECTION 84-3 OF THE STANDARD SPECIFICATIONS. REFLECTIVE MATERIAL SHALL BE APPLIED TO ALL TRAFFIC STRIPES (EXCEPT BLACK PAINT) ON THE FINAL FINISH COAT PER SECTION 84-3 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA AN,D CITY OF FONTANA. 7. THE CONTRACTOR SHALL FURNISH THE NECESSARY CONTROL POINTS FOR ALL STRIPING AND MARKING AND SHALL BE RESPONSIBLE FOR ThE COMPLETENESS AND ACCURACY THEREOF 't0 THE SATISFACTION OF, THE CITY ENGINEER. 8. TRAFFIC SIGN DIMENSIONS, COLOR, AND LETTERING SHALL CONFORM TO CALTRANS APPROVED SIGN SPECIFICATION SHEETS. SIGN CODES SHOWN HEREON CORRESPOND TO THE CALTRANS SPECIFICATION SHEET CODES. SIGNS SHALL BE THE STANDARD SIZE UNLESS OTHERWISE INDICATED. 9. MATERIALS FOR SIGNS, POSTS AND MOUNTING HARDWARE, SIGN CONSTRUCTION AND SIGN PANEL INSTALLATION SHALL CONFORM TO SECTION 56-2 OF THE CALTRANS STANDARD SPECIFICATIONS. 10. SIGNS SHALL BE MOUNTED ON METAL BOX SECTION POSTS UNLESS OTHERWISE INDICATED. POSTS AND INSTALLATION SHALL MEET CITY REQUIREMENTS. 11. THE QUANTITY OF TRAFFIC SIGNING AND STRIPING SHALL BE CONSIDERED ONE LUMP SUM ITEM COMPLETE IN PLACE. THE LUMP SUM PRICE IN THE ,BID SHALL INCLUDE FULL COMPENSATION FOR FURNISHING -ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT FOR DOING ALL WORK INVOLVED IN, -OR APPURTENANT TO , THE INSTALLATION OF TRAFFIC LINES AND/OR MARKINGS AND/OR MARKERS AND TRAFFIC SIGNS AS REQUIRED BY THESE PLANS. ALL COSTS FOR TEMPORARY PAVEMENT PAINTING, INCLUDING COSTS FOR SANDBLASTING OF EXISTING LINES AND MARKINGS, AND THE REMOVAL OF PAVEMENT MARKERS, SHALL BE AT THE CONTRACTOR'S EXPENSE. REDWOOD AVENUE CONSTRUCTION NOTES (DI—R-1 "STOP" (REMOVE BOTH WHEN SIGNAL BECOMES OPERATIONAL) 2O)_R-7, R -7A "KEEP RIGHT" SIGN WITH "K" MARKER (D3-��R.18 (RT) "RIGHT LANE.MU TURN RIGHT" SIGN (OR LEFT) 4a—R-26 "NO PARKING ANYTIME" SIGN AT 250' INTERVALS 5 "DIRECTIONAL ARROW" AND/OR "STOP" PAVEMENT MARKING 66 CROSSWALK 7 4" DASHED WHITE LANELINE PER DETAIL I I (��_SOLID 8" WHITE LINE 9 SOLID DOUBLE YELLOW LINE PER DETAIL 28 10 4" SOLID WHITE LINE 11 R-61 SERIES (12)_21<" MARKER 13 R-2 SIGN AND LEGEND S ­ 5 W -II (LT) TYPE "G" FLEXIBLE POST DELINEATORS, CLASS 2 16 W-75 SIGN ,"LANE ENDS MERGE LEFT`S eV�A'O�A` F,y �C.H®C 26229 Z EXp 3"31- 90 sl 011/1 qjE OF C At�t v% REV/,1'E MEd/A/11 .7-0 MAi TC f1 HI wu � �000 g 11 P 11 STREET IMPRO VEMEEN T 191-4A/S ,PE6//SED ST.f/�/NG' TO /�IATIf,� Oh/�, w4e ;1" • G '12� 3170 REDHILL AVENUE - COSTA MESA, CA 92626-3428 • (714) 641-8777 Na. /724' ' CIVIL ENGINEERING - LAND PLANNING - LAND SURVEYING PREPARED UNDER THE SUPERVISION OF: ENGR S. DATE CITY DATE 21 89 NO. REVISIONS pAPPROVAL JOHN C. HOGAN R. C. E. 26229 DAT E CITY OF FONTANA, CALIFORNIA PUBLIC WORKS DEPARTMENT DRAB G BY SIGNING AND STRIPING `� PLAN SCALE: HORIZ. : I"= 80' DESIGNED B K.W. :MILLER AVENUE-,MEYER CANYON DRIVE CHECKED BY& ROANOKE ROAD oarE: J.C.H '7— (o JOB N0. �-����n-� .�,p�; DR.NO. SHT. N0. APPROVED 3801 CIVIL ENGINEER R.C.E. 40964 «�I � OF �