Loading...
HomeMy WebLinkAbout1627-29 0 30" Or STORM DRAIN SCALE: 1"020° CATCH BASIN PER DATE: JULY 15,1988 POWER POLE STORM DRAIN PLANS (TO BE REMOVED DWG. # 14490 R34 SIGN BY OTHERS) "NO U TURN" 104' D '- —2-C, 3DLC+(2DLC) �------------------------------------RW PROPOSED — =P8#5PB#5 1 1 2"C, 2DLC+ 1 DLC PB#5 � — — I ( FUTURE CURB AND GUTTER 04PPB 06 �.. 04P 3A 03A 0313036 — — EXISTING EDGE OF PAVEMENT PROPOSED #2 #2 #3 #3 0 (TO REMAIN) "� A.C. BERM -E o NDON (06 FUTURE) --�-4) 6" GASEDISON. . . -7�7--- —7-77---7/7--77---R34SIGW7 — -- -----ir-----�--— --,r/r----- 7 1 .0- 3 "NO U TURN" 06 (01 FUTURE ) 128^ ( ) 129 — #4 130 120' 70' 30' Q' 02 10" GAS . . . . . 02 02 --42"9STORM DRAIN---------� o l N 12" WATER 02 # . . 2 4P �Z 04 0 PB#5 1-C, 1 DLC PB#5 — EXISTING 2" CONDUIT (EDISON) 1 1/2"C, 2DLC LEGEND -INDICATES 12' x 6' LOOP DETECTOR O-INDICATES 6' x 6' LOOP DETECTOR ALL SIGNAL HEADS TO BE #1, UNLESS OTHERWISE INDICATED ON PLANS. Q -12" # 1 0 -12" STANDARD 12" LENS Uo -12" Q -12" #2 O -12" LEFT TURN Q -12" Q -12" #3 0-121, RIGHT TURN U(q -12" Q -12" #4 Q -12" STANDARD 12" LENS G -12" WITH LEFT TURN F- -12" SPECIAL NOTES 1. SEE SHEET 1 FOR GENERAL NOTES, DETAILS, AND VEH SIG MTG LEGEND. PEDESTRIAN PUSH BUTTON 2. SEE SHEET 3 FOR STRIPING, CHANNELIZATION, LUMINAIRE AND SIGNING. TYPE 3. THE CONTRACTOR SHALL "JACK" ALL CONDUIT "A" UNDER ALL THE ROADWAY UNLESS ANOTHER METHOD IS APPROVED BY THE CITY ENGINEER. 4. METAL BACKPLATES TO BE PROVIDED ON ALL ARROW SIGNAL HEADS. 5. THE CONTRACTOR SHALL SANDBLAST EXISTING STRIPING. 6. THE CONTRACTOR SHALL INSTALL ALL LOOP DETECTORS PER CALTRANS STANDARDS. 7. STRIPING AND CHANNELIZATION SHALL BE PER- 24-4-80 FORMED BY THE CONTRACTOR. POLE SCHEDULE /� 0313. S N r 3' = (TYP) 03A 03B' 40.0- I " z 0 G o w ICD � Q R � R r' N 28.0-- 32.0— EXISTING 06 30' 06 131^- 02 R34 SIGN �"NO U TURN" // / EDGE Of PAVEMENT02 02P STATION 132+92 END EXISTING CURB AND GUTTER BEGIN 3:1 TAPER OF EDGE OF PAVEMENT TO STATION 133+67 1"C, 1 DLC — — — — PB#5 RAW — — — — — — — — — 70' 06 31---/ 132-- . . . . (TYP) 71 TC 89.81 \ 02 PPB FL 89.14 EXISTING TREES (TYP) 7/rF PB#5 — -- R\W O FUTURE CURB RETURN (35' R) TC 89.43 FL 88.76 I J I2 I N U I R N 3 m of A I EDGE OF PAVEMENT m L I B E R R Y I A V E N U E I I STATION 141+16 BEGIN TAPER OF PROPOSED EDGE OF PAVEMENT END TAPER STA11ON 139+85 JOIN EXISTING EDGE OF PAVEMENT oy 111114 111) 1 Do mum w C AOBLZ STANDARD PLACEMENT DIMENSIONS VEH SIG MTG PED SIGNAL PEDESTRIAN PUSH BUTTON H.P.S. SPECIAL N0. LUMINAIRE REQUIREMENTS TYPE SIG. LUM. HEIGHT "A" "B" MASTPOLE 0 MTG RJ ARROW M.A. M.A. JAI 4 PED. SIG. (2) (2) (4) j� 2 PPB (1) (2) (1) �l 4 PPB (1) 2 2 POLE MOUNTED A 24-4-80 35 15 30 2.5 2.5 MAS SV- i -T ? SP -1 2 �-- -�W I.S.N.S. (SLOVER AVE) OB 1-A - - 10 2.5 2.5 - TV 2-T 2 4 SP -2-T 2 4 GFCI GROUND - - OC 24-4-80 35 15 30 8.0 2.5 MAS SV -2 -TD 4 SP -1 -Ti 4 � I.S.N.S. (MULBERRY AVE) OD 18-4-80 30 - 17 1104.0 2.5 1 MAS SV- 1-T - - - - - - 0 o • 0313. S N r 3' = (TYP) 03A 03B' 40.0- I " z 0 G o w ICD � Q R � R r' N 28.0-- 32.0— EXISTING 06 30' 06 131^- 02 R34 SIGN �"NO U TURN" // / EDGE Of PAVEMENT02 02P STATION 132+92 END EXISTING CURB AND GUTTER BEGIN 3:1 TAPER OF EDGE OF PAVEMENT TO STATION 133+67 1"C, 1 DLC — — — — PB#5 RAW — — — — — — — — — 70' 06 31---/ 132-- . . . . (TYP) 71 TC 89.81 \ 02 PPB FL 89.14 EXISTING TREES (TYP) 7/rF PB#5 — -- R\W O FUTURE CURB RETURN (35' R) TC 89.43 FL 88.76 I J I2 I N U I R N 3 m of A I EDGE OF PAVEMENT m L I B E R R Y I A V E N U E I I STATION 141+16 BEGIN TAPER OF PROPOSED EDGE OF PAVEMENT END TAPER STA11ON 139+85 JOIN EXISTING EDGE OF PAVEMENT oy 111114 111) 1 Do mum w C AOBLZ CONDUCTOR RUN AiA23 Q Q Q #14 !� i VEH. SIG. (3) (3) (3) ,0' 2 VEH. SIG. 3 ,O'SA VEH. SIG. 3 3 3 3 �l3B VEH. SIG. 3 3 3 3 !� 8 VEH. SIG. 3 3 3 3 !� 2 PED. SIG. 2) 4) (2) JAI 4 PED. SIG. (2) (2) (4) j� 2 PPB (1) (2) (1) �l 4 PPB (1) 2 2 PPB CODON (1) 2 (3) 1) SPARES 3 3 3 6 3 TOTAL #14 9 19 Z7 34 10 #10 SIGNAL COMMON 1 1 1 2 1 1 TOTAL #10 1 1 1 2 1 1 #8 a A LUMINAIRES 2 2 4 2 GFCI GROUND 1 SIGNAL SERVICE 2 TOTAL #8 2 2 4 2 3 Or IDETECTORS (2) (2) (2) (2) fif 2 DETECTORS 4 4 Ar 6 DETECTORS 3 3 3 3 ftl SA DETECTORS 3 3 X SB DETECTORS 3 3 TOTAL DLC 5 1 5 9 15 6 =urr mzE]E2 3 3 2- 3 2 2 ( )—FUTURE CONNECTION:Ali w1res aholl be pulled, coped In pullboxes, and labeled (future .8) O T pv r 74), GO TO A 7 - 10" GAS 120' 06 1 .0 133--- - 10" GAS . . . . . 14.0 12" WATER EXISTING EDGE OF PAVEMENT (TO REMAIN) SIGNAL MAINTENANCE, INC. (714) 630-5465 ELECTRICAL SERVICE 120V/240V SINGLE PHASE SOUTHWEST CORNER OF MULBERRY AVE. AND SLOVER AVE. STATION 143+30 (SCE REF. STATION 25+70) AT HANDHOLE "BBB" (H5370169) PER SOUTHERN CALIFORNIA EDISON PLAN: D.W.O. 6730-2575 J.I. 8-2506 REF. NO.: UG -D-88-658 SHEET 7 OF 8 SHEETS. FOR SERVICE NOTIFY MR. HAL STEWART, PLANNER SOUTHERN CALIFORNIA EDISON 300 NORTH PEPPER AVENUE RIALTO, CALIFORNIA 92376 (714)820-5483 CONTROLLER ECON OLI TE ASC -8000 PHASING DIAGRAM > 02 i —> 06 T�ADM TT I II 02 06 & 03B > > Jim 61A k 6313 � 64P FUTURE PHASING DIAGRAM >> as 06 02 —� � ir s38 .03A r�031 02 & 06 06 & 01 & 03B 03A & .03B m no m -> / 1% f= -> Q 04P