Loading...
HomeMy WebLinkAbout1586-3cn 4- 0 LL CONSTRUCTION NOTES 1� 8" curb and gutter per Standard Detail No. 101. 2O 4" concrete. sidewalk as shown on Standard Detail No. 100-C and 105A. ger 4 Trim existing. pavement as shown on drawing and install,3'"A.C, paving over compacted native soil (95% minimum relative compaction), ,0 Overlay existing pavement to produce a smooth section (1" Minimum). 70 Construct reinforced concrete Discharge Structure per, Standard Detail No. 124. n Construct concrete box culvert per Detail "B" 11 Remove eucalyptus trees in street right-of-way. { 12 Construct 6" concrete driveway approach per Standard Detail 10274.. W = driveway width. DAdjust water valve cover to grade. D-Provide standard frame and cover per Standard Detail No. 124. REVISIONS r K'RIEGER & STEW `Rfr 0 INCORPORATED ENGINEERING CONSULTANTS RIVERSIDE, CALIFORNIA ( 714) 684 - 8900 APPROVED BY _ -_ —J. - REGISTERED ENGINEER N9 _2,57Z0*" DATE NO DESCRIPTION ENG'R. DATE APPROVED DATE / �+ 2wcy -25-SR Z visEoT�i��/rvE �/tiliT.soG,tiE��G. 5)AF 2wid 8 -is -8 PM a wit) 8-2$-69 i Mo. 25226 \ JK UP. 12-31 89 i U ()TF 11410KlEt6 OF P-)nX C(L\ ePiT - AT 09011EWW ?)e W0 L 155 114\ 0 Q?" TI -I I CKNf✓55. CITY OF FONTANA , CALIFORNIA PUBLIC WORKS DEPARTMENT Drown 8): Scale: AVENUE'yo z.ALMERIA' Designed 6y: Dote. MILLER AVENUE SOUTHERLY A 3 20' 2 ,24 -9f Checked By : /&,Lo,0 �,, Dw/g . No . 3 JApproved: No 0164 CITY ENGINEER RCE ..... �:.