HomeMy WebLinkAbout1586-3cn
4-
0
LL
CONSTRUCTION NOTES
1� 8" curb and gutter per Standard Detail No. 101.
2O 4" concrete. sidewalk as shown on Standard Detail No. 100-C and 105A.
ger
4 Trim existing. pavement as shown on drawing and install,3'"A.C, paving over
compacted native soil (95% minimum relative compaction),
,0 Overlay existing pavement to produce a smooth section (1" Minimum).
70 Construct reinforced concrete Discharge Structure per, Standard Detail
No. 124.
n Construct concrete box culvert per Detail "B"
11 Remove eucalyptus trees in street right-of-way.
{ 12 Construct 6" concrete driveway approach per Standard Detail 10274..
W = driveway width.
DAdjust water valve cover to grade.
D-Provide standard frame and cover per Standard Detail No. 124.
REVISIONS
r
K'RIEGER & STEW `Rfr 0
INCORPORATED
ENGINEERING CONSULTANTS
RIVERSIDE, CALIFORNIA ( 714) 684 - 8900
APPROVED BY _ -_ —J. -
REGISTERED ENGINEER N9 _2,57Z0*" DATE
NO
DESCRIPTION
ENG'R.
DATE
APPROVED
DATE
/
�+ 2wcy
-25-SR
Z
visEoT�i��/rvE �/tiliT.soG,tiE��G.
5)AF
2wid
8 -is -8
PM a wit)
8-2$-69
i
Mo. 25226
\ JK UP. 12-31 89
i
U ()TF
11410KlEt6 OF P-)nX C(L\ ePiT -
AT 09011EWW
?)e W0 L 155 114\ 0 Q?" TI -I I CKNf✓55.
CITY OF FONTANA , CALIFORNIA
PUBLIC WORKS DEPARTMENT
Drown 8): Scale:
AVENUE'yo z.ALMERIA'
Designed 6y: Dote.
MILLER AVENUE SOUTHERLY A 3 20' 2 ,24 -9f
Checked By : /&,Lo,0 �,, Dw/g . No . 3
JApproved:
No 0164
CITY ENGINEER RCE
..... �:.