Loading...
HomeMy WebLinkAbout1450B-1TO LA w a FWY. TO � - COLTON SLOVER 11 I I I AVE W Q DAHLIA ST. 0 Z W NN>OR NO SCALE VICINITY MAP SEWER IMPRO�/EMENTffl PLl�NS SLOVER I AVENUE FONTANA GATEWAY- SPECIFIC PLAN AREA CITY OF FONTANA COUNTY OF SAN BERNARDINO zi z a , li..l LJ a Lii CONSTRUCTION NOTES, AND QUANTITY ESTIMATES > Q > Q AVE. ]zSANTA w ANA AVE. >I N Cr W L.— m m Z .. a W JURUPA j Q = BASIN U J V JURUPA AVE. MA LAY AVE. NN>OR NO SCALE VICINITY MAP SEWER IMPRO�/EMENTffl PLl�NS SLOVER I AVENUE FONTANA GATEWAY- SPECIFIC PLAN AREA CITY OF FONTANA COUNTY OF SAN BERNARDINO DESCRIPTION Title Sheet Typical Sections Detail Sheet Slover Avenue SHEET NO. 1 . 2 3 4-5 VE. GENERAL NOTES 1. The construction of all public improvements shall conform to these plans and to the requirements of the City Standard Specifications, Public Works Department, City of Fontana. Refer to definitions and terms in City Standard Specifications. 2. Excavation and Construction Permits shall be obtained from Fontana Public Works Department prior to start of any work within the city limits. 3. The Contractor shall obtain a permit from the San Bernardino County Road Depart- ment for work within the County right-of-way. 4. The Contractor shall obtain a permit from the San Bernardino County Flood Control District for work within their easements. 5. Stationing refers to the centerlines of street except where otherwise • noted. 6. All underground work shall be completed prior to paving of streets. 7. Locations of Public Utilities shown have been determined from available information. However, it shall be the responsibility of the Contractor to determine the true loca- tion and elevation in the field of any existing utilities and to exercise proper pre- cautions to avoid injury or damage thereto. Contractor shall contact underground service alert for utility location before excavation at 1-800-422-4133. 4 8. The walls and faces of all excavations greater than five (5) feet in depth shall be effectively guarded by a shoring system, sloping of the ground or other equivalent means. Trenches less than five (5) feet in depth shall also be guarded when exam- ination indicates hazardous ground movement may be expected. 9. The Contractor(s) shall obtain a permit to perform excavation or trench work as described in Note 6 above from California State Division of Industrial Safety. See Standard Specifications for Public Works Construction Section 306-1.1.6. 10. All manhole and cleanout frames and covers shall be constructed 6 inches below finished grade by sewer contractor and shall be raised to grade by paving contractor after completion of, paving. 11. Refer to City of Fontana, underground utility location Standard Detail 129. 12. Adequate stakes shall be set by the Engineer to enable the Contractor to construct the works to the plan grades. 13. As -built drawings shall be provided by the Contractor to the City of Fontana. 14. The Contractor shall be responsible for the resetting of any survey monuments, street centerline monuments, or benchmarks which are disturbed during construction whether they are shown on the plans or not. 15.- Chis. X shall be placed on the curb over locations of sewer laterals 'by the sewer contractor. 16. It shall be the Contractor's responsibility to verify the horizontal location and vertical elevations of all utility crossings for all utilities constructed prior to the sewer. Any discrepancies shall be made in writing to the owner prior to construction. 17. The Contractor(s) shall coordinate construction with all utilities and other improve- ments including, but not limited to, gas, telephone, electrical, lighting, television cable, landscaping, landscaping irrigation, domestic water, reclaimed water, sewer, storm drainage, flood control systems, etc. 48 -hours prior to excavation near their facilities, notify: City of Fontana San Bernardino County Flood Control 8353 Sierra Avenue 825 East Third Street Fontana, California 92335 San Bernardino, California 92408 Telephone (714) 350-7610 Telephone (714) '383-1665 -- So. Calif. Gas Company Pacific Telephone 8 Telegraph Company 1981 W. Lugonia Avenue 3939 Coronado Street Redlands, California 92374 Anaheim, California 92807 Telephone ( 714) 884-9411 Telephone ( 714) 999-5514 Southern California Edison Company Underground Service Alert 300 N. Pepper Avenue Telephone ( 800) 422-4133 Rialto, California 92376 Group W Cable Telephone 8561 .Nuevo Avenue (714) 820-5598 - Underground Fontana, California 92335 ( 714) 875-5100 - Transmission Telephone ( 714) 350-2344 (213) 637-1233 Pipelines, or. Fontana Water Company ( 800) 422-4133 16803 Spring Street General Telephone Company Fontana, California 92335 245 N. Mountain View Avenue (714) 822-2201 Pomona, California 91766 Telephone ( 213) 357-2257 or (800) 422-4133 SNI✓�'�- 4 SNE�'r� S CONSTRUCTION NOTES, AND QUANTITY ESTIMATES SLOVER AVE. NUMBER ITEM QUANTITY UNIT Install 8" extra strength Vitrified Clay Pipe per City of Fontana'Standards INDEX M � and Specif ications. (0 C� 2- LF 3 > O2 Install 10',' extra strength Vitrified X 0 Clay Pipe per City of Fontana Standards 542 LF and Specifications. 4!! O3 Install 18" extra strenght Vitrified Clay Pipe per City of Fontana Standards and Specifications. LF SCALE � W (n W a o Install 21tra strength Vitrified " exg clay 2 Z pipe per City of Fontana Standards I" = 800' 0 , and Specifications. -' LF SANTA ANA AVE. I I O Install standard manhole per. City of -112. EA Fontana Standard Detail O Install standard drop manhole per �- City of Fontana Standard Detail 112. - --- EA o: O7 Install 8" sewer laterals per City of 2�� J Fontana Standard Detail 125 (Modified). LF O8 Install sewer cleanout box per City of 4 Fontana Standard Detail 125A. EA i O9 Construct sewer line concrete protective .7O blanket per detail sheet No. LF 10 Adjust manhole cover to grade per City of Fontana Standard Detail 109. EA DESCRIPTION Title Sheet Typical Sections Detail Sheet Slover Avenue SHEET NO. 1 . 2 3 4-5 VE. GENERAL NOTES 1. The construction of all public improvements shall conform to these plans and to the requirements of the City Standard Specifications, Public Works Department, City of Fontana. Refer to definitions and terms in City Standard Specifications. 2. Excavation and Construction Permits shall be obtained from Fontana Public Works Department prior to start of any work within the city limits. 3. The Contractor shall obtain a permit from the San Bernardino County Road Depart- ment for work within the County right-of-way. 4. The Contractor shall obtain a permit from the San Bernardino County Flood Control District for work within their easements. 5. Stationing refers to the centerlines of street except where otherwise • noted. 6. All underground work shall be completed prior to paving of streets. 7. Locations of Public Utilities shown have been determined from available information. However, it shall be the responsibility of the Contractor to determine the true loca- tion and elevation in the field of any existing utilities and to exercise proper pre- cautions to avoid injury or damage thereto. Contractor shall contact underground service alert for utility location before excavation at 1-800-422-4133. 4 8. The walls and faces of all excavations greater than five (5) feet in depth shall be effectively guarded by a shoring system, sloping of the ground or other equivalent means. Trenches less than five (5) feet in depth shall also be guarded when exam- ination indicates hazardous ground movement may be expected. 9. The Contractor(s) shall obtain a permit to perform excavation or trench work as described in Note 6 above from California State Division of Industrial Safety. See Standard Specifications for Public Works Construction Section 306-1.1.6. 10. All manhole and cleanout frames and covers shall be constructed 6 inches below finished grade by sewer contractor and shall be raised to grade by paving contractor after completion of, paving. 11. Refer to City of Fontana, underground utility location Standard Detail 129. 12. Adequate stakes shall be set by the Engineer to enable the Contractor to construct the works to the plan grades. 13. As -built drawings shall be provided by the Contractor to the City of Fontana. 14. The Contractor shall be responsible for the resetting of any survey monuments, street centerline monuments, or benchmarks which are disturbed during construction whether they are shown on the plans or not. 15.- Chis. X shall be placed on the curb over locations of sewer laterals 'by the sewer contractor. 16. It shall be the Contractor's responsibility to verify the horizontal location and vertical elevations of all utility crossings for all utilities constructed prior to the sewer. Any discrepancies shall be made in writing to the owner prior to construction. 17. The Contractor(s) shall coordinate construction with all utilities and other improve- ments including, but not limited to, gas, telephone, electrical, lighting, television cable, landscaping, landscaping irrigation, domestic water, reclaimed water, sewer, storm drainage, flood control systems, etc. 48 -hours prior to excavation near their facilities, notify: City of Fontana San Bernardino County Flood Control 8353 Sierra Avenue 825 East Third Street Fontana, California 92335 San Bernardino, California 92408 Telephone (714) 350-7610 Telephone (714) '383-1665 -- So. Calif. Gas Company Pacific Telephone 8 Telegraph Company 1981 W. Lugonia Avenue 3939 Coronado Street Redlands, California 92374 Anaheim, California 92807 Telephone ( 714) 884-9411 Telephone ( 714) 999-5514 Southern California Edison Company Underground Service Alert 300 N. Pepper Avenue Telephone ( 800) 422-4133 Rialto, California 92376 Group W Cable Telephone 8561 .Nuevo Avenue (714) 820-5598 - Underground Fontana, California 92335 ( 714) 875-5100 - Transmission Telephone ( 714) 350-2344 (213) 637-1233 Pipelines, or. Fontana Water Company ( 800) 422-4133 16803 Spring Street General Telephone Company Fontana, California 92335 245 N. Mountain View Avenue (714) 822-2201 Pomona, California 91766 Telephone ( 213) 357-2257 or (800) 422-4133