HomeMy WebLinkAbout1450A-2SOI
R,
WI
R
SLOVER AVENUE
OT TO SCALc
MULBERRY AVENUE
�r r -SCALE
►RTH
/W
ST
,W
SPECIAL NOTES
8" Minimum clearance between top of 24" RCP lateral and bottom
of proposed/ existing waterline shall be maintained.
8" Minimum clearance between top or bottom of 24" RCP lateral
and bottom or top of proposed sewerline -shall be maintained.
Depth of sewer line within Santa Ana Avenue
increases in an easterly direction.
Contractor to pothole lateral crossing locations of the existing
16"/10"/4" gas lines prior to construction to verify depth of
said gas lines so as to insure that lateral crossings can be
accomplished.
WEST
R/W
EAST
R/W
SOUTH
Raw
COMMERCE WAY
BUSINESS .-DRIVE
NOr >0 6C-,A1-L:--
SANTA
CFtC
NORTH
R/W W
SANTA ANA
AVENUE,
lvo T TO SG.4 L L