STREET IMPROVEMENT PLANS
FOR
TRACT
ao'
30 io '
o� .0.20` y
�tvrc /-/w
•
%YPIGAL See T/0/1/
WlLLIAMS ROAD
STREET IMPROVEMENT GENERAL NOTES
11927
1. A11 work shall be C%t7e in accordance with these plans and the City of
Fontana Public Works Department Standard Specifications dated 1975.
2. Construction permits shall be obtained from Fontana Public Works Department
prior to the start of any work.
3. Manhole frames and covers shall be constructed 6" below finished
pavement grade by the sewer contractor and shall be raised to grade at the
completion of the paving
4 Water valve covers shall be raised to gradeby the Paving Contractor.
5. Adequate stakes shall be set by the Engineer to enable the Contractor to
construct the work to the plan (,rades.
6. As -built plans shall be provided'to the City by the Contractor.
7. The Contractor shall contact all serving Utility companies for locations
of existing underground lines that may exist which are not shown on
these plans before the start of any work.
JZ�
44, j
&a
D,2Jv' O./.0 Geme/ Z:rr�
2%000"4-J % 1,
6'7'1
ry�icA� �'�crrow
,5f!N -14al re A YA-*Nl/-
N r- S.
ons
Contractor wfrc-es that lie shall assume: sole and com lete resibilit for job UNAUTHORIZED CHANGES &USES
, f �r y CAUTION: The engineer preparing these plans will not be responsible California Council
tiite cunclitions duanJ u_ the corse. of conu
s-rction 1 of this ro ret, irlcludinsafety of all
y r, or liable for unauthorized changes to or uses of these plans. All ofCivilEn ineerr
l;erti�ns tinct pi-olwrty • that this i-equtreme r. t shall apply continuously and not be lirri- ' �
;feel to norrri��l %%c�rl:in-r }lours r�ncl that the Contractor shall defend indr.rnnif}• and
anges to the plans must be in writing and must be approved by the LandSurveW-,
.34
alc; the !_ wfit•r ;incl ;h(. Ergine t --i harmless fr-oin 'lily ane] all liability, real or alle?ed, �: �•'- eparer of these plans.
}t
inc.e,t�nc-cti� r; ��itil the l�c•rforrriatice of ��orl: on this Prn�cct, cxceptinn for liability
.trt�tt�-f+nni mo .0v ne,;h, once of the; 0,.vier or thc: L• nglnccr. •
le I
I
-� ,Son dac,,v io Ave.
'N a
� � V
!eay_m0n1/ Court _
BA9/N
Iso .sheet moo. 6 ,
srXUP T 1MP,10YeMel r INP&Y MAP
Arf
10
BENCH MARK:
City of Rialto B.M #21 on B.M. Circuit #1
RR Spike on So. Side of PP # 1153325 E at the NE corner
of Base Line and Locust Avenue
Elev.=1400.41
City of Fontana #xm-3
PK Nail in top of So. curb of Miller, 0.9' west of Sc.uthwest
curb return at Alder and Miller,
Elev.=1358.31
Equation: Pubract 0.10'from elevations shown for City of Fontana Bench
BASIS OF BEARING:
Being the centerline of Maple Avenue shown as N00°10'13"W per Parcel
Map No. 4808, PMB 50/20
ESTIMATE OF QUANTITIES:
3274.71
L.F.
8" Curb and Gutter
251.32
L.F.
8" Curb only (Returns)
1932
S. F.
P.C.C. Cross Gutter and Spandrel
•2351.6
S.F.
4 ItP. C. C SM0l a/k
834
S.F.
P. C.C. Drive Approach
2
E.A.
Sidewalk Drain
1
e.A.
Barricade
660
L.F.
21#x4" Redwood Header
55,607
S.F.
A.C. Pavement per Soils Report
1188
S.F.
A.C. Removal
CONSTRUCTION NOTES
( (1 D__
Construct 8" P.C.0 Curb & Gutter per STD 101
2 Construct Ramped return per STD 104A
3(�---- Const•ruct P.C.0 Cross Gutter per STD 104
44 Construct 4' P.C.0 Sidewalk per STD 105A
5 Construct Sidewalk Drain per STD 124 A
6 Construct ,1 r P.C.0 Drive Approachp/oeStd 10.3
7 'Construct 2 A.C. ovar c.ompectad native. soil
8 Install 2"x4" Redwood Header
99 -Install Barricade per STD No. 118
G e i. ... a.. 1 !1 1 A.G. L S l L i 1 ef
Q�_Saw-Cut to Neat Clean Edge
12 Remove existing A.C. Pavement
13 Remove all Interfering trees (typ);
14 Relocate water meter
15 Relocate Power Pole
16 Remove exist, C.L. Fence
Remove exist water Faucet
Q8 Con3truGt A.G. over eonmpacte,d 4c?- ,I.e,
/9 O�i�r/ay ��v�sGing A.G.PavGrr�eaC to vravloI6 Smcjoe.,i strvat tGoC,on.
- " f�� ----- L'oilst�uct G �P• G.G. Garb f l.�utter Per/' Sic% /O/ •
ZZ Cods!,, -V,6 C 7 baSir? pelf- v^fc! /Z/. z 4 �ir� G e/�gXh.
23 Z0/1.67�- eY 0V619 "1,9111Ve r moo . St4/ 20,9 Wi fh 0/eh"'/6 i-�c,�
/oar def'��/ o� sfia� f to o f' to
S>`reel G ir`�5
Q Z ,10C10 / 11,91 h Pressures S(:7c11411W
D 5'00
O
I
.5,4/YMRS0/V f 14s_4oe1*T&s, Ilve
Carr
FONrAN4. c* 4L / , ORNI#4
9587 Arrow Aovfe,
.Sv%fe "N
Roocho ���o�o��, u'4 ,•l 117P
AAMA_414f Alawxs aeowirAeNr
( 7/4) 980- itis
Orawn Ay'
sr1gee r /Mf'r30Yf:M�'/YT '
.4oa/G
NtGA•
DBs9�ea� A y.
Date: "
Kim)
re,4G r Na 92 7
4ppro ve i 6 �
p
Dw9. No
S'hGst
r:onk Troo4 arC.�.
//447
Checker/ may''
gale. 2� .
/ci/G No. Bs OSB
,i . T. J . G ,
y
(iify �ninur-----
s .
4-mm"W
,