Loading...
HomeMy WebLinkAbout995-1all 0+400 1*00 43 -NN GEWERALNOTES is All work shall be done in accordance with these plans and the City of Public Works Department Standard Specifications dated 1575 Fontana Vv q 4i curs ns CURVE PATA 2 � � �,� lks Ilk -)nst raction permits shall be obtained from Fontana Public Works Depar't_ 2 C 20 a� merit prior to the start of any work. k` A - 4.5"34'29 1- - 49.31 t z&. 05, �` �, h ` M�` w �� �m 3, Manhole frames and covers shall be constructed within 6": of finished ­ 12mm�W 4mM pareTftent grade by the Sewer Contractor and shall be raised to grade L 21 R- 62.00' 1,3 1411 Ilk N at the completion of the paving by the Paving Contractor. 1) A= 2 5"50' 31 " ts50,311, y - 1 - , %X� 4.'�� Water valve covers shall be raised to grade by the Paving Contractor'.,' 4. Al 4 Adequate stake's shall be set by the Engineer to enable the Contractor O R 38.A& IFA to construction the work to the plan grades, 4 REVIL11 A -z 7*' Cnu`12 0 0 VA MTi 0 oil, VU 4 '77 A 41 o j*Zj 20.00 g-4 a4l 41 WAIN L19,E CURVE- 17ArA Ilk 4- at SA4 V iN LV Iry L 4 20 7 06 41 ......... .' 4 ESTIMATE OF QUANTITIES k A 7.85.4 L.F. 6" Curb & Gutter NN cap 2. 689.5 L.F. 8". Curb & Gutter 3. 125.7 L.F. Var. Curb Only (at returns) 4. 31.3 L.F. 8" Curb Only (at returns) 5. x,870 S.F.411 ConcreteSidewalk (include sidewalk ramp)6. 5128 S.F. Concrete Driveway W 161 (Sidewalk not included) CONSTRUCTION 7. 15,3236 S.F. (190 Tons) 2"A.C. Paving 8. 4,995 S.F. (78 Tons) 23�" A.C. Pav- ing 9. 5 5850 S.F. a R.Constriact 890 Curb & Gutter per Stand 'rd No. 1,01 (110 Tons) 3" A.C4 Paving 10. 10 370 S.F. (65 Tons) 1" A.C. Overlay i Construct 6" Curb & Gutter per Standatd �Jo. 101. 11. 1 Each Curb Inlet Structure 4 12. 1 Each Construct • 3 3C'' 3A' Ramped Return per Standard No. 104A. 13. 25 S.F. A -C. Apron 14. /07 L.F. '4. I Construct 4,,, P.C.C. Sidewalk. le 15. 3 Each Raise* S.M.H. to Grade 16. Lump Sum 4 4 Earthwork "L-4 construct P. •C.C. Cross Gutter per Standard No. 1050 17. 966 S.F. X -Gutter Spandrel • Construct 3" A.C. Pavement 'over, compacted native soil. Construct 2-1/20t A,C, Pavement over compacted nat1*7es oil. _4 Construct 2,1 A.C. Pavement over compacted' native soil. 4 Construct ltt A.C. Overlay, 0 tz t -J Aj CAL.IFOMNIA INVI L LG SAi4OE R-6 t44 14 CITY' OF FONTAt-4 6TISawo clean -cutt t straight t stra fht edge. 0.41 ArZMl`1e00M SU IM H TYPICAL 05ON 14.1rep ­*..] rur3LIC Vior Is 0EPARTHC t?A9CH6 Cae,4 Moo�A, CA..Ilm Install 2 -Type Contractor agrees that he shall assume sole and complete responsibility for job 17000AR COURT ot-n-4t ro if-z-7-oo L11 Markers,as directed by City Engineer. i ;relepbane 1"7/*) qVI-1211 SCA 10 A ZEFT MAI,45 At"M Project, including safety of all 97-1 site conditions durincy the course of construction of this P MA C ZVVILLEA STIZ50T -11.41 TO 1-t3&.70 7/ r Of T, /V10- /0401? VERT. ersons and property; that this requirement shall apply continuously and not be lim- p 61246VILLEA S77ZEE7` ited to normal -svoeking hours; and that the Contractor shall defend, indemnify and hold the Owner and the Engineer harmless from any and all liability, real or alleged, in connection with the performance of work on this Project, excepting for liability ------- arising from the sole negligence of the. Owner or the Engineer. Kenneth A/. z/nwl Ile ..v c x. rto ww wrw VIP