Loading...
HomeMy WebLinkAbout1294-8S'CaGEr:AN G* -T fA.W.[�-�[vv� 1V� 9 f 78.42 S D. = 9♦50 6'u.4 x4mA '866.24 "RAP. R.4. 3/.38 CoNaT A. C. (000) Our4or APR' OV ,4,dre# ro ExisT CP GRA066 Tv 0RA/n.> G d.4% MW. Construction contractor- agrees that in accordance with generally accepted construction practices, construction contractor will be required to assume sole and complete responsibility for job site conditions during the course of construction of the project, including safety of all persons Cc�liFornic� Council and property; that this requirement shall be made to apply continuously and not be limited to i normal working hours, and construction contractor further agrees to defend, indemnify and hold Of Civil Engineer/ design professional harmless from any and all liability, real or alleged, in connection with the Aand Swveyor/ j' } performance of work on this project, excepting liability arising from the sole negligence of design { professional. IV [•.v.[ t[vvv-Aar / /? "RCS° (�3,'o-0) _ CITY of fioAlr-41vA,CooIFORNQ/NV/ZE �/ 5 ING.--rt 9339 AAeEume RAP.. 5uire 190 WORK5�ZdNCl/o CG/CAMOw64, CsIL/FoRviA 9/73d I�Gl3L/C raicePNoive.- (7/4) 989-3922 .94wN Y:S'c4ca ; —� .J6roRM DR4/iv RZ4�t/ ` AROF/GE „ F` /!OR/ z : / -0 o6sJ�kao eri Da ��: KiNNCT/i JV. Zwvzew R C.E. 20300 CNEG&6 ,BY:DWv. No. sir , 8 � �dTE. FIG&,moo, TR040B5 J.T. J , , F. G /rY �V&1A1 WW f�G /99$2 2�DA, / I0